114 East 102 Street
Manhattan, NY 10029BBL 1-01629-0065Map
Owner of record: Lott Legacy Apartments Housing Developme Nt Fund
114 East 102 Street is a walk-up apartment building built in 1910 in Manhattan, 10029. It has 9 residential units across 5 floors. The owner of record is Lott Legacy Apartments Housing Developme Nt Fund. HPD has recorded 242 housing violations here, most recently on October 22, 2025. 2 of the 50 most recent violations are still open. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 242
- DOB violations
- 10
- ECB violations
- 4
- HPD complaints
- 220
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 242
- BHazardous
Properly repair with similar material the broken or defective rubber gasket at upper and lower door at refrigerator in the kitchen located at apt 5a, 5th story, 1st apartment from west at north
Oct 22, 2025 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story
Apr 27, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north located at apt 4a, 4th story, 1st apartment from west at north
May 2, 2024 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
May 2, 2024
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 4a, 4th story, 1st apartment from west at north
May 2, 2024 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at building entrance door
Apr 14, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 5a, 5th story, 1st apartment from south at west
Feb 15, 2023 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective water supply pipe at wash basin in the bathroom located at apt 5a, 5th story, 1st apartment from south at west
Feb 15, 2023 · Apt 5A
Closed — Violation dismissed - BHazardous
Replace the broken or defective wash basin sink in the bathroom located at apt 5a, 5th story, 1st apartment from south at west
Feb 15, 2023 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south, north and east walls in the public stairs at roof bulkhead
May 17, 2022
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the private hallway located at apt 5b, 5th story, 1st apartment from east at south
Apr 23, 2020 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the private hallway located at apt 5b, 5th story, 1st apartment from east at south
Apr 23, 2020 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, east wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from east at south
Apr 16, 2020 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Apr 16, 2020 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 1st room from north at east located at apt 5b, 5th story, 1st apartment from east at south
Apr 16, 2020 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from east at south
Apr 16, 2020 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from north at east located at apt 5b, 5th story, 1st apartment from east at south
Apr 16, 2020 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 3rd room from north at east located at apt 5b, 5th story, 1st apartment from east at south
Apr 16, 2020 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Apr 16, 2020 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 3rd room from north at east located at apt 5b, 5th story, 1st apartment from east at south
Apr 16, 2020 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall, 1st window frame from north at east wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Oct 29, 2019 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the kitchen located at apt 5b, 5th story, 1st apartment from east at south
Oct 29, 2019 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall, west wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from east at south
Oct 29, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 5b, 5th story, 1st apartment from east at south
Oct 29, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from north at east wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Oct 29, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from east at south
Oct 29, 2019 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall in the private hallway located at apt 5b, 5th story, 1st apartment from east at south
Oct 25, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the private hallway located at apt 5b, 5th story, 1st apartment from east at south
Oct 25, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south
Oct 22, 2019 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at 1st window frame from north at east wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Oct 22, 2019 · Apt 5B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the east window header at the south wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Oct 3, 2019 · Apt 5B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east window header at the south wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Oct 3, 2019 · Apt 5B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... the east window frame at the south wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Oct 3, 2019 · Apt 5B
Closed — Violation closed - ANon-hazardous
M/d law abate the nuisance consisting of moisture penetration at the two windows on the south wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Sep 22, 2019 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Jul 9, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
Jul 9, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 4; a/c units installed at window inproperly secured missing one way screws. in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south
Jul 9, 2019 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from east at south
May 24, 2019 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the 2nd bathroom from north at west located at apt 5b, 5th story, 1st apartment from east at south
May 24, 2019 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the foyer located at apt 5b, 5th story, 1st apartment from east at south
May 24, 2019 · Apt 5B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
May 24, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 1st room from north at west located at apt 5b, 5th story, 1st apartment from east at south
May 24, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 2nd bathroom from north at west located at apt 5b, 5th story, 1st apartment from east at south
May 24, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the foyer located at apt 5b, 5th story, 1st apartment from east at south
May 24, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
May 24, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 8; tenant refused access. tenant has air conditioners in all of the windows except at fire escape, child under six one way screws needed apt 5b in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south
May 24, 2019 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mortise lock at entrance door to building from street
May 20, 2019
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
May 20, 2019 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 4th room from north located at apt 5b, 5th story, 1st apartment from east at south
May 20, 2019 · Apt 5B
Closed — Violation closed
DOB building violations · 10
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 8, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 2
Failure to maintain bldg walls or appurtenances. noted: at exp#1 masonry facade in state of disrepair surrounding door & various locations from 1st fl through 5th fl. remedy: comply w/code maintain exterior bld
Jan 9, 2017 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior blsg wall(s)or appurtenances.noted:@exp #1 masonry facade in state of disrepair surrounding door and various locations from 1st through 5th flrs.rem:maintain exterior bldg wall.
Nov 19, 2016
Resolve - Class - 1
Failure to maintain exterior building wall or appurtenances. at exp1 masonry facade in state of disrepair surrounding door and various locations form 1st to 5th floors. rmdy: maintain exterior building wall.
Sep 23, 2016 · Penalty $1,250
Resolve - Class - 2
Failure to maintain exterior bldg wall or appurtenances. noted at exp#1 front masonry parging defective by entry door 1st fl at masonry cornie at 1st fl & at 5th fl in various locations. remedy: maintain exteri
Sep 8, 2015 · Penalty $1,250
Resolve
Complaints
- Appliance
Refrigerator
Nov 7, 2025 · Apt 5A
Open - Heat/hot water
Entire building
Oct 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 21, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Oct 20, 2025 · Apt 5B
Close - Heat/hot water
Entire building
Oct 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt BLDG
Close - Appliance
Refrigerator
Oct 16, 2025 · Apt 5A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 26, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Nov 18, 2024 · Apt 4A
Close - Paint/plaster
Ceiling
Nov 18, 2024 · Apt 4A
Close - Electric
Power outage
Nov 18, 2024 · Apt 4A
Close - Door/window
Door
Apr 30, 2024 · Apt 5A
Close - Heat/hot water
Apartment only
Apr 30, 2024 · Apt 5A
Close - Electric
Outlet/switch
Jan 19, 2024 · Apt 1B
Close - Door/window
Door
Jan 19, 2024 · Apt 1B
Close - Appliance
Refrigerator
Jan 19, 2024 · Apt 1B
Close - Door/window
Door
Dec 13, 2023 · Apt 5A
Close - Door/window
Door
Dec 13, 2023 · Apt 5A
Close - Heat/hot water
Entire building
Dec 7, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 6, 2023 · Apt 5A
Close - Plumbing
Toilet
Aug 17, 2023 · Apt 4A
Close - Plumbing
Toilet
Aug 17, 2023 · Apt 4A
Close - Electric
No lighting
Aug 17, 2023 · Apt 4A
Close - General
Bell/buzzer/intercom
Apr 2, 2023 · Apt 2A
Close - Door/window
Door
Apr 2, 2023 · Apt 2A
Close - Electric
No lighting
Nov 30, 2022 · Apt 4A
Close - Paint/plaster
Wall
Oct 27, 2022 · Apt 5A
Close - Heat/hot water
Apartment only
Oct 27, 2022 · Apt 5A
Close - Plumbing
Basin/sink
Oct 27, 2022 · Apt 5A
Close - Plumbing
Basin/sink
Jun 27, 2022 · Apt 5A
Close - General
Bell/buzzer/intercom
Jun 27, 2022 · Apt 5A
Close - Plumbing
Bathtub/shower
Jun 27, 2022 · Apt 5A
Close - Plumbing
Basin/sink
Jun 27, 2022 · Apt 5A
Close - Plumbing
Bathtub/shower
Jun 27, 2022 · Apt 5A
Close - Electric
No lighting
Jun 27, 2022 · Apt 5A
Close - Paint/plaster
Wall
Jun 27, 2022 · Apt 5A
Close - Plumbing
Basin/sink
Feb 18, 2022 · Apt 1B
Close - Paint/plaster
Ceiling
Feb 18, 2022 · Apt 1B
Close - Door/window
Window frame
Sep 11, 2019 · Apt 5B
Close - Paint/plaster
Window/frame
Sep 11, 2019 · Apt 5B
Close - Appliance
Refrigerator
Sep 11, 2019 · Apt 5B
Close - Outside building
Roof door/hatch
Feb 5, 2019 · Apt 5B
Close - Appliance
Refrigerator
Feb 5, 2019 · Apt 5B
Close - Water leak
Heavy flow
Feb 5, 2019 · Apt 5B
Close - Door/window
Window frame
Dec 21, 2018 · Apt 5B
Close - Heat/hot water
Apartment only
Dec 21, 2018 · Apt 5B
Close - Appliance
Refrigerator
Aug 15, 2018 · Apt 5B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 5
- Residential units
- 9
- Building area
- 9,210 ft²
- Lot area
- 2,523 ft²
- Zoning
- R7-2
- Community board
- 111
- Council district
- 8
- Block / lot
- 1629 / 65
- Assessed value
- $909,450
- Landmark / historic district
- No
HPD registration #133804, last renewed Sep 10, 2025.
Questions about 114 East 102 Street
Who owns 114 East 102 Street?
The owner of record in NYC Department of City Planning PLUTO data is Lott Legacy Apartments Housing Developme Nt Fund.
Does 114 East 102 Street have violations?
Yes. NYC HPD has recorded 242 housing violations at this property.
Is 114 East 102 Street rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 100% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 114 East 102 Street built?
City records list 1910 as the year it was built.
How many apartments are in 114 East 102 Street?
It has 9 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.