roofy

300 East 83 Street

Manhattan, NY 10028BBL 1-01545-0049Map

Owner of record: E83 Properties LLC

300 East 83 Street is an elevator apartment building built in 2023 in Manhattan, 10028. It has 70 residential units across 22 floors. The owner of record is E83 Properties LLC. HPD has recorded 87 housing violations here, most recently on August 18, 2026. 6 of the 50 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2022.

HPD violations
87
DOB violations
19
ECB violations
25
HPD complaints
179

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Aug 18, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2022
3
About 4% of the building's 70 apartments
Up from 1 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 87

  • B

    Properly repair the source and abate the evidence of a water leak at north wall in the foyer located at apt 11a, 11th story, 1st apartment from south at west

    Aug 18, 2026 · Apt 11A

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyer located at apt 11a, 11th story, 1st apartment from south at west

    Aug 18, 2026 · Apt 11A

    Open — Invalid certification
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 11a, 11th story, 1st apartment from south at west

    Aug 18, 2026 · Apt 11A

    Open — Civ14 mailed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 11a, 11th story, 1st apartment from south at west

    Aug 18, 2026 · Apt 11A

    Open — Invalid certification
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story

    Aug 18, 2026

    Open — Nov certified on time
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 14, 2025

    Open — Not complied with
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Aug 14, 2025

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 14, 2025

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story

    Aug 14, 2025

    Closed — Violation closed
Show 40 more ↓
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Aug 14, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 14, 2025

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Aug 14, 2025

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 16, 2025

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 2, 2022

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 15, 2022

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 15, 2022

    Closed — Violation closed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder misssing shoe at fire escape

    Nov 18, 2019

    Closed — Violation closed
  • C

    Abate the nuisance consisting of mice in the entire apartment located at apt 3e, 3rd story, 1st apartment from north at east

    Feb 5, 2019 · Apt 3E

    Closed — Violation closed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at fire escape at building west

    Jul 19, 2018

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 4s, 4th story, 1st apartment from east at south

    Jul 11, 2018 · Apt 4S

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 4s, 4th story, 1st apartment from east at south

    Jul 11, 2018 · Apt 4S

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3n, 3rd story, 1st apartment from west at north

    Jul 11, 2018 · Apt 3N

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 3n, 3rd story, 1st apartment from west at north

    Jul 11, 2018 · Apt 3N

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 6, 2018

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4n, 4th story, 1st apartment from west at north

    Apr 6, 2018 · Apt 4N

    Closed — Violation closed
  • B

    Provide approved metal screen below bulkhead skylight at public hall

    Apr 6, 2018

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of construction material and stroller at public hall, 1st story

    Apr 6, 2018

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 6, 2018

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    Apr 6, 2018

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box improper sign at public hall, 1st story

    Apr 6, 2018

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall, 5th story

    Apr 6, 2018

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Apr 6, 2018

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Apr 6, 2018

    Closed — Violation closed
  • B

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 4n, 4th story, 1st apartment from west at north

    Apr 6, 2018 · Apt 4N

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice located at apt 4n, 4th story, 1st apartment from west at north

    Apr 6, 2018 · Apt 4N

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak throughout ceiling in the 1st room from north located at apt 4n, 4th story, 1st apartment from west at north

    Apr 6, 2018 · Apt 4N

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling all walls in the 1st room from north located at apt 4n, 4th story, 1st apartment from west at north

    Apr 6, 2018 · Apt 4N

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak throughout ceiling in the bathroom located at apt 4n, 4th story, 1st apartment from west at north

    Apr 6, 2018 · Apt 4N

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 4n, 4th story, 1st apartment from west at north

    Apr 6, 2018 · Apt 4N

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the kitchen located at apt 2e, 2nd story, 1st apartment from north at east

    Oct 7, 2017 · Apt 2E

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east

    Oct 7, 2017 · Apt 2E

    Closed — Violation closed
  • B

    Properly repair the broken or defective wood floor in the private hallway located at apt 2e, 2nd story, 1st apartment from north at east

    Oct 7, 2017 · Apt 2E

    Closed — Violation closed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at fire escape at building west

    May 10, 2017

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    May 10, 2017

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall, 1st story

    Aug 14, 2015

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 5e, 5th story, 1st apartment from north at east

    Aug 14, 2015 · Apt 5E

    Closed — Violation dismissed
  • C

    Fire escape defective. properly secure loose triangle gusset plate at east corner top return rail on 4th story balcony, frotn north at fire escape

    Oct 24, 2014

    Closed — Violation closed
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 5e, 5th story, 1st apartment from north at east

    Jul 9, 2014 · Apt 5E

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color all ceilings in the entire apartment located at apt 5e, 5th story, 1st apartment from north at east

    Jun 4, 2014 · Apt 5E

    Closed — Violation closed

DOB building violations · 19

  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 12, 2024

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 11, 2022

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
Show 9 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed

ECB violations · 25

  • Class - 2

    I observed sidewalk shed parapet panel at exposure 1 & 2 with unlawful posting, poster advertising unrelated to the jobsite affixed to the sidewalk shed on the protective structure as per bc 3301.9.7 (no sign,

    Jan 22, 2025 · Penalty $2,530

    Resolve
  • Class - 2

    Failure to comply with bc-3314.4.1.5. respondent didn't place notification of adjustable suspended scaffold installation prior to the initial installation, the department shall be notified at least 24 hours, bu

    Jul 2, 2024 · Penalty $5,000

    Resolve
  • Class - 1

    Special rigger license #5685. failure to designate a qualified foreman, at visit time i asked worker supervisor for his rigging foreman license from dob but the worker failed to provide it. unqualified person a

    Jul 2, 2024 · Penalty $2,530

    Resolve
  • Class - 1

    Permit holder failed to ensure workers safe use for a frame ladder as workers didn't follow the manufacturer specifications by using the ladder while it was closed and set on unstable edges, creating an immedia

    Jul 2, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to provide and maintain adequate housekeeping on several floors placing big piles of combustible loose debris were found on such area, creating hazardous of start fire, the noncombustible debris were no

    Jul 2, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3301.2 missing cover panels: at time of inspection i observed throughout jobsite missing circuit breaker cover panels exposing electrical wires creating a hazardous condition for workers and persons accessin

    Jun 15, 2024 · Penalty $1,600

    Resolve
  • Class - 1

    A worker slipped down stairs and twisted their knee. permit holder job#m00574359-i1-gc failed to submit report within 3 business days of required 16 items by code 28-103.21 per 28-103.21.1 via web form, ll78of2

    Jul 27, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    Responding to incident where labor miguel tumbaco slipped and fall from 16th floor landing on 15th floor at stairs area, inspection revealed that there were missing attendance pre-shift safety meeting prior to

    Jul 22, 2023 · Penalty $5,000

    Resolve
  • Class - 2

    22 story nb, currently on 11floor, i observed active site, with use of fire hydrant at exp2 with no backflow prevention device installed, contrary to dep permit.

    Jun 1, 2023 · Penalty $625

    Resolve
  • Class - 1

    Failure to safeguard all persons and property affected by construction operations. note, the gas valve was struck with excavator while digging at the loading area to job site., safeguard public and property

    May 17, 2023

    Resolve
Show 15 more ↓
  • Class - 2

    A time of inspection on a nb at excavation level observe excavation in progress inspector revealed adjacent property 1592 2nd av is receiving water at the basement level at expos#4 from the excavation operat

    Nov 2, 2022 · Penalty $625

    Resolve
  • Class - 2

    Jobsite fence not constructed or maintained pursuantto subsection.at time of inspection observed active job site not signed off yet.noted no construction fence at exp #3 as required by code.remedy:comply with c

    Mar 18, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection.at time of inspection observed active job site not signed off yet.noted no construction fence at exp #3 as required by code.remedy:comply with

    Mar 18, 2022

    Resolve
  • Class - 2

    Job site fence not constructed or maintained pursuant to subsection.at time of inspection observed active job site not signed off yet.noted no construction fence at exp #4 as required by code.remedy:comply with

    Mar 18, 2022

    Resolve
  • Class - 1

    Bc3301.6 design sizes and capacity of materials structures temporary construction and equipment.note:at time of inspection of active jobsite observed installed shoring on 2nd floor request for design drawing no

    Jan 7, 2022

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.note:at time of inspection active jobsite observed shoring installed on 1st & 2nd floor review of dob approved drawings reveal

    Jan 7, 2022

    Resolve
  • Class - 1

    Bc3314.1 supported scaffold does not comply with chode.note:at time of inspection of active jobsite observed supported scaffold at exp #3 & #4 does not comply with code:not fully planned,missing guardrails,no s

    Jan 7, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to institute safety measures.note:at time of inspection of active construction site observed multiple holes on 1st & 2nd floors with not secured plywood temporary platform blocking egresses creating uns

    Jan 7, 2022 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3314.1 supported scaffold does not comply with code.note:at time of inspection of active construction site observed supported scaffold at exp 32 & #4 does not comply with code.missing toe boards,midrails,top

    Jan 7, 2022 · Penalty $625

    Resolve
  • Class - 2

    Failure to institute safety measures.note:at time of inspection observed multiple holes on 1rst & 2nd floors with no secured plywood temporary platform and beams blocking egress creating unsafe condition.remedy

    Jan 7, 2022 · Penalty $5,000

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.note:at time of inspection i observed sidewalk shed in place w/out lighting installed.remedy:comply w/code-install lighting.

    Aug 27, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    No information panel note at time of inspection i observed sidewalk shed in place without information panel on parapet.rem:comply with code-provide information panel.

    Aug 27, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Sec. 3307.6.5 failure to maintain adequate illumination beneath sidewalk shed as required by code. noted: sidewalk shed erected under job#140413309 along exp#2 ave has inoperable bulbs vendering affected area

    Jan 4, 2016 · Penalty $4,000

    Resolve
  • Non-hazardous

    Sec.27-777 exhaust vent terminates within 10ft of residence window at east exterior wall (first fl) contrary to requirements under reference standards 13-2.3,4,3 thereby discharging exhaust fumes from kitchen

    Mar 5, 2008 · Penalty $2,500

    Resolve
  • Non-hazardous

    B4a/16/36.

    Aug 15, 2005 · Penalty $2,500

    Resolve

Complaints

  • Water leak

    Slow leak

    Sep 2, 2026 · Apt 10C

    Close
  • Paint/plaster

    Ceiling

    Sep 2, 2026 · Apt 10C

    Close
  • Heat/hot water

    Apartment only

    Aug 15, 2026 · Apt 11A

    Close
  • Heat/hot water

    Entire building

    Aug 11, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Aug 11, 2026 · Apt 11A

    Close
  • Heat/hot water

    Apartment only

    Aug 11, 2026 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Aug 11, 2026 · Apt 8C

    Close
  • Heat/hot water

    Entire building

    Jun 3, 2026 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Mar 18, 2026 · Apt 16D

    Close
  • Water leak

    Damp spot

    Mar 18, 2026 · Apt 16D

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Mar 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 5, 2026 · Apt BLDG

    Close
  • Safety

    Fire escape

    Oct 30, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 12, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Sep 28, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 28, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Aug 12, 2025 · Apt 12A

    Close
  • Heat/hot water

    Entire building

    Aug 12, 2025 · Apt 12A

    Close
  • Electric

    No lighting

    Aug 25, 2021 · Apt SIDEWA

    Close
  • General

    Ventilation system

    Sep 30, 2019 · Apt 2S

    Close
  • Unsanitary condition

    Mold

    Sep 30, 2019 · Apt 2S

    Close
  • Unsanitary condition

    Pests

    Apr 26, 2019 · Apt 4E

    Close
  • Unsanitary condition

    Pests

    Oct 27, 2018 · Apt 3E

    Close
  • Plumbing

    Bathtub/shower

    Jul 2, 2018 · Apt 4S

    Close
  • Plumbing

    Basin/sink

    Jul 2, 2018 · Apt 4S

    Close
  • Appliance

    Electric/gas range

    Jul 2, 2018 · Apt 4S

    Close
  • Water leak

    Damp spot

    Jul 2, 2018 · Apt 4S

    Close
  • Safety

    Fire escape

    Jul 2, 2018 · Apt 4S

    Close
  • Plumbing

    Basin/sink

    Jul 2, 2018 · Apt 4S

    Close
  • Plumbing

    Bathtub/shower

    Jul 2, 2018 · Apt 4S

    Close
  • Water leak

    Damp spot

    Jul 2, 2018 · Apt 4S

    Close
  • Appliance

    Electric/gas range

    Jul 2, 2018 · Apt 4S

    Close
  • Unsanitary condition

    Pests

    Jun 30, 2018 · Apt 3N

    Close
  • Unsanitary condition

    Pests

    Apr 4, 2018 · Apt 4N

    Close
  • Paint/plaster

    Ceiling

    Apr 4, 2018 · Apt 4N

    Close
  • Paint/plaster

    Ceiling

    Apr 4, 2018 · Apt 4N

    Close
  • Unsanitary condition

    Pests

    Dec 27, 2017 · Apt 4N

    Close
  • Water leak

    Damp spot

    Dec 27, 2017 · Apt 4N

    Close
  • Paint/plaster

    Ceiling

    Dec 27, 2017 · Apt 4N

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2017 · Apt 3E

    Close
  • Unsanitary condition

    Pests

    Oct 2, 2017 · Apt 2E

    Close
  • Unsanitary condition

    Pests

    Sep 28, 2017 · Apt 2E

    Close
  • Heat/hot water

    Entire building

    May 9, 2017 · Apt 4N

    Close
  • Plumbing

    Water supply

    Apr 25, 2017 · Apt 5E

    Close
  • Plumbing

    Water supply

    Mar 21, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 21, 2017 · Apt BLDG

    Close
  • Electric

    Power outage

    Mar 21, 2017 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2023
Floors
22
Residential units
70
Building area
109,998 ft²
Lot area
5,900 ft²
Zoning
C1-9
Community board
108
Council district
5
Block / lot
1545 / 49
Assessed value
$16,636,500
Landmark / historic district
No

HPD registration #145303, last renewed Oct 14, 2025.

Questions about 300 East 83 Street

Who owns 300 East 83 Street?

The owner of record in NYC Department of City Planning PLUTO data is E83 Properties LLC.

Does 300 East 83 Street have violations?

Yes. NYC HPD has recorded 87 housing violations at this property.

Is 300 East 83 Street rent stabilized?

NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2022 (about 4% of its 70 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 300 East 83 Street built?

City records list 2023 as the year it was built.

How many apartments are in 300 East 83 Street?

It has 70 residential units and 71 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.