432 West 49 Street
Manhattan, NY 10019BBL 1-01058-0049Map
Owner of record: NYC 4900 Holdings LLC
432 West 49 Street is a walk-up apartment building built in 1910 in Manhattan, 10019. It has 10 residential units across 5 floors. The owner of record is NYC 4900 Holdings LLC. HPD has recorded 389 housing violations here, most recently on November 2, 2025. 8 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 389
- DOB violations
- 9
- ECB violations
- 28
- HPD complaints
- 352
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 389
- BHazardous
Refit lower window sash second window from west at north in the 1st room from north located at apt 3w, 3rd story, 1st apartment from south at west
Nov 2, 2025 · Apt 3W
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3w, 3rd story, 1st apartment from south at west
Nov 2, 2025 · Apt 3W
Open — Invalid certification - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north located at apt 3w, 3rd story, 1st apartment from south at west
Nov 2, 2025 · Apt 3W
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the kitchen , the private hallway located at apt 3w, 3rd story, 1st apartment from south at west
Nov 2, 2025 · Apt 3W
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3w, 3rd story, 1st apartment from south at west
Nov 2, 2025 · Apt 3W
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor at public hall, 1st story
Jan 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at vestibule at public hall, 1st story
Jan 3, 2025
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked boiler room door. in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Dec 20, 2024 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1e, 1st story, 1st apartment from east at south
Dec 20, 2024 · Apt 1E
Open — Violation will be reinspected - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3e, 3rd story
Dec 19, 2024 · Apt 3E
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east
Dec 17, 2024 · Apt 2E
Open — Violation will be reinspected - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east
Dec 17, 2024 · Apt 2E
Open — Violation will be reinspected - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east
Dec 17, 2024 · Apt 2E
Open — Violation will be reinspected - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor at public hall, 1st story
Sep 6, 2024
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of trees ,shrubs ,umbrellas and other household effects preventing free egress at the rear yard
Jul 19, 2024
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2e, 2nd story, 1st apartment from north at east
Jul 19, 2024 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective connection at the waste line under the ksink in the kitchen located at apt 2e, 2nd story, 1st apartment from north at east
Jul 19, 2024 · Apt 2E
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls at closet in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall under sink in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective standing stopper for bathtub in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at steam riser in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation closed - ANon-hazardous
Refit door in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation closed - CImmediately hazardous
Properly secure the loose at wash basin in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation closed - BHazardous
Replace with new the missing light fixture at ceiling in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lock at lower sash 2nd window at south wall in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain surface at bathtub in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Jul 3, 2023 · Apt 3W
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain reglaze finish at bathtub in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - ANon-hazardous
Replace with new the defective flush pipe of water closet .. in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 3rd room from north located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Properly secure the loose light fixture at ceiling in the 2nd room from north located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Replace with new the broken or defective glass pane lower sash window, first window from east at south wall in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective counter balance lower sash window, second window from east at south wall in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Replace with new the broken or defective wall cabinet at east wall in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - ANon-hazardous
Refit door closet at east wall in the kitchen located at apt 3w, 3rd story, 1st apartment from south at west
Dec 16, 2022 · Apt 3W
Closed — Violation closed - BHazardous
Replace with new the missing light fixture at ceiling at vestibule , 1st story
Oct 6, 2022
Closed — Violation closed
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 15, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 1, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 28
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35271925y issued on 07/05/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Nov 15, 2017
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35271925y issued on 07/05/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. occupancy contrary to that allowed by the c of o. 1st fl sub-di
Oct 5, 2017
Resolve - Class - 2
Failure to comply w/the comm's order contained in sum/vio#35271925y issued on 07/05/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. occupancy contrary to that allowed by c of o or bldg dept records.
Aug 16, 2017
Resolve - Class - 1
Occuapancy contrary to that allowed by the certificate of occupancy orbuilding dept records.hpd mdr#110049 indicates building to be 5 stories with 10 a units.each floor having 2 units.it was noted that the 1st
Jul 5, 2017
Resolve - Class - 2
Failure to comply w/commissioners order contained in summons/violation#35177301p issued on 03/10/16 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01.first fl west work w/o permit for kitchen &bathroom
Jun 9, 2017 · Penalty $800
Resolve - Class - 2
Failure to comply with commissioners order contained in summons/violation#35177300n issued on 03/10/16 amd to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for illegal occupancy on the
Jun 3, 2017 · Penalty $800
Resolve - Class - 1
Failure to comply w/the comm's order contained in summons/vio#35177301p issued on 3-10-16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for work w/o a permit at 1st floor.
Apr 9, 2017
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35177300n issued on 03/10/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for occupancy illegal. remedy: comply w
Apr 9, 2017 · Penalty $800
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation#35177301p issued on 08/25/16 and to file a certificate of correction pursuant to 28-201.1 amd 1rcny 102-01.no compliance recorded.re
Apr 9, 2017 · Penalty $2,400
Resolve - Class - 2
Occupancy contrary to that allowed by c of o and dept of bldgs.recordsapartment located at unit w 1st story,1st apartment from south at west.partition erected consisting of sheet rock and studs illegally sub di
Mar 2, 2017 · Penalty $1,200
Active
Show 18 more ↓
- Class - 2
Occupancy contrary to that allowed by cofo and department of buildingsrecords. apartment located at unit 1w 1st story, 1st apart from south at west. partition erected consisting of sheet rock and studs illegall
Mar 2, 2017 · Penalty $1,200
Active - Class - 1
Work w/out a permit. failure to comply w/ the commissioner's order contained in summons/violation# 35177301p issued on 3/10/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for erecting full height pa
Jan 24, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov #35177301p issued on 08/25/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. wokr w/o a permit. on the southwest back apt on the 1st fl.
Jan 4, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov #35177301p issued on 03/10/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. noted: no record of compliance. no related job filing.
Dec 11, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to comply with the commissioners order contained in nov#35177301p issued on 03/17/16 and to file a certificate of correction pursuant to 28--201.1,28-204.4 and 1rcny 102-01.wrk w/out permit created apt
Nov 26, 2016 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35186775l issued on 07/12/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. no records of compliance found. remedy: comply w/comm's order
Oct 22, 2016 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35049343r issued on 05/28/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. noted: no record of compliance found. remedy: comply w/comm's
Oct 22, 2016 · Penalty $800
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov #35177301p issued on 03/10/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. work w/o permit. remedy: comply w/comm's order &/or file a c o
Aug 25, 2016 · Penalty $2,400
Resolve - Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or building dept records. 1story apt in subdivided into 2 class"a"apts known as 1wfront and 1w rear both apt have full kitchen with gas ranges
Aug 24, 2016 · Penalty $1,200
Active - Class - 2
Failure to comply w/ the commissioner's order contained in nov# 35177300n issued on 3/10/16 & to file a c of c pursuant to 28-201.1, 28-204.4 & 1rcny 102-01. noted: no documents file for occupancy contrary to t
Jul 12, 2016 · Penalty $800
Resolve - Class - 1
Failure to comply w/ the commissioner's orders contained in nov# 35177301p issued on 3/10/16 & to file a c of c pursuant to 28-201.1, 28-204.4 & 1rcny 102-01. noted: no documentfile for work w/out a permit. re
Jul 12, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the comm's order contained in nov #35177301p issued on 03/10/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. apt 1w,divided w/o permit-gas,waste & water lines. no permit
May 28, 2016 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35177300n issued on 3/10/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny 102-01. for illegal occupancy at 1st fl level. remedy: comply w/comm's
Apr 30, 2016 · Penalty $4,000
Resolve - Class - 1
Work w/o a permit. work noted:at 1st fl western("right") installed water & waste lines to create 3 pc. bathroom & residential sink. installed gas line for stove & additional created kitchen. erected partition w
Mar 10, 2016 · Penalty $4,000
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or dob records.hpd mdr #110049 indicates bldg to be five stories with ten "a" units. illegal occupancy noted:1st fl western apart. subdivided the legal class "a"
Mar 10, 2016 · Penalty $12,000
Active - Class - 2
Failure to comply w/the comm's order to file a cert.of correction w/the dob for nov#34879683j issued on 03/01/2011 pursuant to 28-204.4 & 1rcny 102-01.
Aug 24, 2011 · Penalty $800
Resolve - Class - 1
Noted at cellar a gerder has been broke and a make shift column instaled the fire rated ceilng is broken at several locations water is actually dripping or leaking into cellar rem: immediately make safe obtain
Mar 1, 2011 · Penalty $1,000
Resolve - Class - 2
Noted at cellar various type of materials has been haphazardly placed in and stored into the cellar rem; maintain adequate housekeeping
Mar 1, 2011
Resolve
Complaints
- Plumbing
Bathtub/shower
May 15, 2026 · Apt 2E
Close - Paint/plaster
Ceiling
May 15, 2026 · Apt 2E
Close - Unsanitary condition
Mold
May 15, 2026 · Apt 2E
Close - Flooring/stairs
Floor
Mar 18, 2026 · Apt 1
Open - Door/window
Door
Mar 18, 2026 · Apt 1
Open - Appliance
Electric/gas range
Jan 7, 2026 · Apt 2E
Close - Appliance
Electric/gas range
Jan 7, 2026 · Apt 2E
Close - Appliance
Electric/gas range
Jan 2, 2026 · Apt 2E
Close - Appliance
Electric/gas range
Jan 2, 2026 · Apt 2E
Close - Unsanitary condition
Mold
Jan 2, 2026 · Apt 2E
Close
Show 40 more ↓
- Appliance
Electric/gas range
Dec 26, 2025 · Apt 2E
Close - Appliance
Electric/gas range
Dec 26, 2025 · Apt 2E
Close - Plumbing
Bathtub/shower
Dec 26, 2025 · Apt 2E
Close - Appliance
Electric/gas range
Dec 23, 2025 · Apt 2E
Close - Unsanitary condition
Mold
Dec 23, 2025 · Apt 2E
Close - Paint/plaster
Wall
Dec 23, 2025 · Apt 2E
Close - Plumbing
Basin/sink
Dec 23, 2025 · Apt 2E
Close - Paint/plaster
Door/frame
Dec 23, 2025 · Apt 2E
Close - Appliance
Electric/gas range
Dec 23, 2025 · Apt 2E
Close - Unsanitary condition
Pests
Oct 23, 2025 · Apt 3W
Close - General
Cabinet
Oct 23, 2025 · Apt 3W
Close - Flooring/stairs
Floor
Oct 23, 2025 · Apt 3W
Close - Paint/plaster
Wall
Oct 23, 2025 · Apt 3W
Close - Appliance
Electric/gas range
Oct 23, 2025 · Apt 3W
Close - General
Ventilation system
Oct 23, 2025 · Apt 3W
Close - Paint/plaster
Ceiling
Oct 23, 2025 · Apt 3W
Close - Door/window
Door frame
Oct 23, 2025 · Apt 3W
Close - Heat/hot water
Apartment only
Oct 23, 2025 · Apt 3W
Close - Door/window
Door
Sep 30, 2025 · Apt 3W
Close - Flooring/stairs
Floor
Sep 30, 2025 · Apt 3W
Close - Electric
Lighting
Sep 30, 2025 · Apt 3W
Close - General
Ventilation system
Sep 30, 2025 · Apt 3W
Close - Paint/plaster
Wall
Sep 30, 2025 · Apt 3W
Close - Door/window
Window frame
Sep 30, 2025 · Apt 3W
Close - Unsanitary condition
Pests
Sep 30, 2025 · Apt 3W
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 15, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2024 · Apt 1E
Close - Heat/hot water
Entire building
Dec 16, 2024 · Apt BLDG
Close - Flooring/stairs
Floor
Dec 16, 2024 · Apt 2E
Close - Door/window
Door
Dec 16, 2024 · Apt 2E
Close - Paint/plaster
Radiator
Dec 16, 2024 · Apt 2E
Close - Appliance
Electric/gas range
Dec 16, 2024 · Apt 2E
Close - Heat/hot water
Entire building
Dec 16, 2024 · Apt 2E
Close - Paint/plaster
Radiator
May 7, 2024 · Apt 2E
Close - Unsanitary condition
Mold
May 7, 2024 · Apt 2E
Close - Flooring/stairs
Floor
May 7, 2024 · Apt 2E
Close - General
Ventilation system
May 7, 2024 · Apt 2E
Close - Safety
Window guard broken/missing
May 7, 2024 · Apt 2E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1910
- Floors
- 5
- Residential units
- 10
- Building area
- 8,800 ft²
- Lot area
- 2,510 ft²
- Zoning
- R8
- Community board
- 104
- Council district
- 3
- Block / lot
- 1058 / 49
- Assessed value
- $1,960,200
- Landmark / historic district
- No
HPD registration #110049, last renewed Oct 20, 2025.
Questions about 432 West 49 Street
Who owns 432 West 49 Street?
The owner of record in NYC Department of City Planning PLUTO data is NYC 4900 Holdings LLC.
Does 432 West 49 Street have violations?
Yes. NYC HPD has recorded 389 housing violations at this property.
Is 432 West 49 Street rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 50% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 432 West 49 Street built?
City records list 1910 as the year it was built.
How many apartments are in 432 West 49 Street?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.