roofy

20 Spring Street

Manhattan, NY 10012BBL 1-00479-0018Map

Owner of record: Rjhwong,

20 Spring Street is a walk-up apartment building built in 1900 in Manhattan, 10012. It has 15 residential units across 6 floors. The owner of record is Rjhwong,. HPD has recorded 72 housing violations here, most recently on July 23, 2023. City tax records listed 9 rent-stabilized apartments here in 2024.

HPD violations
72
DOB violations
4
ECB violations
6
HPD complaints
37

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Jul 23, 2023

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
9
About 60% of the building's 15 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 72

  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of uncapped natural gas pipe at ceiling in the kitchen located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the 1st room from north located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, 1st window frame from north at east wall in the bathroom located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, east wall, west wall in the foyer located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, south wall, east wall, 1st window frame from north at east wall in the 1st room from north located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation closed
Show 40 more ↓
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 3rd room from north at east located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 3rd room from north at west located at apt 14, 6th story, 2nd apartment from east at south

    Jul 23, 2023 · Apt 14

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing , hook and latching mechanism as permanent door holding device installed at floor and vestibule door to building , 1st story

    Jun 29, 2022

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing , hook and latching mechanism as permanent door holding device installed at floor and entrance door to building , 1st story

    Jun 29, 2022

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective wood floor in the foyer located at apt 14, 6th story, 2nd apartment from east at south

    Apr 20, 2022 · Apt 14

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, north wall, ceiling in the kitchen located at apt 14, 6th story, 2nd apartment from east at south

    Apr 20, 2022 · Apt 14

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the 1st room from north located at apt 14, 6th story, 2nd apartment from east at south

    Apr 20, 2022 · Apt 14

    Closed — Violation dismissed
  • C

    Trace and repair the source and abate the visible mold condition... 14 sq ft at west wall, and 20 sq ft at east wall in the kitchen located at apt 14, 6th story, 2nd apartment from east at south

    Apr 20, 2022 · Apt 14

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, west wall, 1st window frame from north at east wall in the kitchen located at apt 14, 6th story, 2nd apartment from east at south

    Apr 20, 2022 · Apt 14

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north located at apt 14, 6th story, 2nd apartment from east at south

    Apr 20, 2022 · Apt 14

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 3rd room from north at east located at apt 14, 6th story, 2nd apartment from east at south

    Apr 20, 2022 · Apt 14

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from north at west located at apt 14, 6th story, 2nd apartment from east at south

    Apr 20, 2022 · Apt 14

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 3rd room from north at west located at apt 14, 6th story, 2nd apartment from east at south

    Apr 20, 2022 · Apt 14

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the hallway at public hall, 1st story

    May 18, 2018

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 18, 2018

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story

    May 18, 2018

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    May 18, 2018

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story

    May 18, 2018

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). sign missing at public hall, 1st story

    May 18, 2018

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    May 18, 2018

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story

    May 18, 2018

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors missing at all stories at public hall

    May 18, 2018

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 7, 4th story, 1st apartment from east at south

    May 18, 2018 · Apt 7

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    May 14, 2018

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the kitchen located at apt 11, 5th story, 2nd apartment from east at south

    May 14, 2018 · Apt 11

    Closed — Violation closed
  • B

    Repair or replace the smoke detector inoperable located at apt 14, 6th story, 6th apartment from east at south

    Apr 25, 2018 · Apt 14

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 14, 6th story, 6th apartment from east at south

    Apr 25, 2018 · Apt 14

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over the ceiling in the 3rd room from north at west located at apt 14, 6th story, 6th apartment from east at south

    Apr 25, 2018 · Apt 14

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective base sink cabinet in the kitchen located at apt 14, 6th story, 6th apartment from east at south

    Apr 25, 2018 · Apt 14

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 14, 6th story, 6th apartment from east at south

    Apr 25, 2018 · Apt 14

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall stairs

    Apr 25, 2018

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of heavy industrial fan and two free standing radiators at public hall, 6th story

    Apr 25, 2018

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of general household garbage and construction materials at public hall, 1st story

    May 17, 2015

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12. at public hall

    May 17, 2015

    Closed — Violation dismissed
  • B

    Arrange and make self-closing the doors in the entrance located at apt 14, 6th story, 2nd apartment from east at south

    May 6, 2015 · Apt 14

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the nuisance consisting of mold ... at east and south walls (appx 8 sq.ft) in the 3rd room from north at east located at apt 14, 6th story, 2nd apartment from east at south

    May 6, 2015 · Apt 14

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 14, 6th story, 2nd apartment from east at south

    May 6, 2015 · Apt 14

    Closed — Violation dismissed
  • A

    Properly secure the loose knob at door in the 3rd room from north at west located at apt 14, 6th story, 2nd apartment from east at south

    May 6, 2015 · Apt 14

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom , the 3rd room from north at east located at apt 14, 6th story, 2nd apartment from east at south

    Apr 15, 2015 · Apt 14

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall, ceiling in the foyer located at apt 14, 6th story, 2nd apartment from east at south

    Apr 15, 2015 · Apt 14

    Closed — Violation dismissed

DOB building violations · 4

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Apr 6, 2001

    Vw-violation work without permit - active

ECB violations · 6

  • Class - 2

    Failure to maintain building in code compliant matter. use of prohibited hardware per bc 1008.1.8: 27-371(j). noted: on door leading from a fire passage way to street observed a latch and a hatch approximately

    Mar 20, 2019

    Resolve
  • Class - 1

    Failure to maintain bldg non code compliant hardware & exit signs rear door approx 30" wide door is fire exit door of a multiple dwelling as per #34702256l rem: maintain bldg w/ code compliant manner

    May 29, 2009 · Penalty $1,000

    Resolve
  • Class - 1

    Change in occupancy use of space as a place of assembly when the current use of the c/o does not call for place of assembly use current c/o is #062022 as per #34702255j rem: new c/o or vacate the area

    May 29, 2009 · Penalty $1,000

    Resolve
  • Class - 1

    Change in occupancy/ use of c of o as per 28-118.3.1 & 28-118.3.2 by operating a place of assembly as per when the current c of o does not allow such occupancy. noted: c/o62022 allows for 5 persons when premis

    Oct 18, 2008 · Penalty $1,000

    Resolve
  • Class - 1

    Fail to maintain bldg in code-compliant manner. use of prohibited door& or hardware & lock of exit signs. noted:@ rear of premises a door approx 30" wide is in place & door leading to exit of multiple dwelling

    Oct 18, 2008 · Penalty $1,000

    Resolve
  • Non-hazardous

    Work without permit noted:1st floor commercial space with gut demo andblocked up door entrance to lobby (public hallway)with under block.re medy:stop all work obtain and maintain all proper permits and plans wi

    Apr 6, 2001

    Resolve

Complaints

  • Paint/plaster

    Wall

    Jul 12, 2023 · Apt 14

    Close
  • Paint/plaster

    Wall

    Jul 1, 2023 · Apt 14

    Close
  • Unsanitary condition

    Mold

    Jul 1, 2023 · Apt 14

    Close
  • Heat/hot water

    Apartment only

    Dec 14, 2022 · Apt 15

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2022 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Apr 5, 2022 · Apt 14

    Close
  • Unsanitary condition

    Mold

    Apr 5, 2022 · Apt 14

    Close
  • Heat/hot water

    Apartment only

    Nov 22, 2021 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Jun 6, 2019 · Apt 14

    Close
  • Heat/hot water

    Entire building

    Nov 22, 2018 · Apt BLDG

    Close
Show 27 more ↓
  • Heat/hot water

    Entire building

    Nov 21, 2018 · Apt 8

    Close
  • Paint/plaster

    Ceiling

    May 16, 2018 · Apt 14

    Close
  • Paint/plaster

    Ceiling

    May 16, 2018 · Apt 14

    Close
  • General

    Cooking gas

    May 16, 2018 · Apt 14

    Close
  • Heat/hot water

    Entire building

    May 16, 2018 · Apt 14

    Close
  • Heat/hot water

    Entire building

    May 16, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 15, 2018 · Apt 7

    Close
  • General

    Cooking gas

    May 15, 2018 · Apt 7

    Close
  • Heat/hot water

    Entire building

    May 11, 2018 · Apt 11

    Close
  • Paint/plaster

    Wall

    Apr 16, 2018 · Apt 14

    Close
  • Water leak

    Slow leak

    Apr 16, 2018 · Apt 14

    Close
  • Heat/hot water

    Apartment only

    Jan 12, 2018 · Apt 14

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2017 · Apt 14

    Close
  • Unsanitary condition

    Mold

    Apr 29, 2015 · Apt 14

    Close
  • Unsanitary condition

    Mold

    Apr 29, 2015 · Apt 14

    Close
  • Unsanitary condition

    Mold

    Apr 29, 2015 · Apt 14

    Close
  • Paint/plaster

    Ceiling

    Mar 23, 2015 · Apt 14

    Close
  • Paint/plaster

    Wall

    Mar 23, 2015 · Apt 14

    Close
  • Paint/plaster

    Ceiling

    Feb 13, 2015 · Apt 14

    Close
  • Plumbing

    Bathtub/shower

    Feb 13, 2015 · Apt 14

    Close
  • Flooring/stairs

    Floor

    Feb 13, 2015 · Apt 14

    Close
  • Plumbing

    Basin/sink

    Feb 13, 2015 · Apt 14

    Close
  • Paint/plaster

    Wall

    Feb 13, 2015 · Apt 14

    Close
  • Paint/plaster

    Wall

    Feb 13, 2015 · Apt 14

    Close
  • Paint/plaster

    Ceiling

    Feb 13, 2015 · Apt 14

    Close
  • Electric

    Outlet/switch

    Feb 13, 2015 · Apt 14

    Close
  • Plumbing

    Basin/sink

    Feb 13, 2015 · Apt 14

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1900
Floors
6
Residential units
15
Building area
11,875 ft²
Lot area
2,856 ft²
Zoning
C6-2
Community board
102
Council district
1
Block / lot
479 / 18
Assessed value
$1,637,100
Landmark / historic district
No

HPD registration #114064, last renewed Jul 2, 2025.

Questions about 20 Spring Street

Who owns 20 Spring Street?

The owner of record in NYC Department of City Planning PLUTO data is Rjhwong,.

Does 20 Spring Street have violations?

Yes. NYC HPD has recorded 72 housing violations at this property.

Is 20 Spring Street rent stabilized?

NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 60% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 20 Spring Street built?

City records list 1900 as the year it was built.

How many apartments are in 20 Spring Street?

It has 15 residential units and 16 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.