22 Spring Street
Manhattan, NY 10012BBL 1-00479-0017Map
Owner of record: 22 Spring Sm LLC
22 Spring Street is a walk-up apartment building built in 1900 in Manhattan, 10012. It has 16 residential units across 5 floors. The owner of record is 22 Spring Sm LLC. HPD has recorded 236 housing violations here, most recently on June 13, 2026. 34 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 236
- DOB violations
- 10
- ECB violations
- 23
- HPD complaints
- 361
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 236
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 3, 2nd story, 1st apartment from south at west
Jun 13, 2026 · Apt 3
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at south yard
Jun 13, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3, 2nd story, 1st apartment from south at west
Jun 13, 2026 · Apt 3
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 13, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Jun 13, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice yard, section ''rear''
Sep 24, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule at public hall, 1st story
Sep 5, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 11, 3rd story, 2nd apartment from east at south
Sep 23, 2024 · Apt 11
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 11, 4th story, 1st apartment from south at west
Sep 12, 2024 · Apt 11
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 11, 4th story, 1st apartment from south at west
Sep 12, 2024 · Apt 11
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 11, 4th story, 1st apartment from south at west
Sep 12, 2024 · Apt 11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 11, 4th story, 1st apartment from south at west
Sep 12, 2024 · Apt 11
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 11, 4th story, 1st apartment from south at west
Sep 12, 2024 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 11, 4th story, 1st apartment from south at west
Sep 12, 2024 · Apt 11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 11, 4th story, 1st apartment from south at west
Sep 12, 2024 · Apt 11
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 11, 4th story, 1st apartment from south at west
Sep 12, 2024 · Apt 11
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of rodents rats at rear yard, 1st story
Apr 10, 2024
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lock set at the vestibule door , 1st story
Apr 10, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the fire door leading to the basement at north at public hall, 1st story
Apr 10, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 15, 2023
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook and latch at vestibule door.
Jun 21, 2023
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and latch at building entrance door.
Jun 21, 2023
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice yard, 1st story
Jun 21, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 15, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 16, 2022
Closed — Violation dismissed - ANon-hazardous
Refit the door in the entrance located at apt 6, 3rd story, 1st apartment from east at south
Jun 4, 2021 · Apt 6
Open — Nov certified late - ANon-hazardous
Remove device preventing door from being self-closing at building entrance door at public hall, 1st story
May 24, 2021
Open — Nov certified late - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 3 standards at 2nd story balcony at north fire escape
May 24, 2021
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system improperly filled out at public hall, 1st story
Feb 23, 2021
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at boiler room
Feb 23, 2021
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 3rd room from north located at apt 5, 3rd story, 1st apartment from north at east
Feb 23, 2021 · Apt 5
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Feb 21, 2021
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Feb 21, 2021 · Apt 6
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 11, 4th story, 1st apartment from south at west
Feb 14, 2021 · Apt 11
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room, section ''basement''
Feb 14, 2021
Open — Nov certified late - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Feb 14, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 3rd room from north located at apt 6, 3rd story, 1st apartment from east at south
Feb 8, 2021 · Apt 6
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system basement door locked at boiler room
Feb 8, 2021
Open — Nov certified late - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system improperly filled out at public hall, 1st story
Feb 8, 2021
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 4th room from north located at apt 6, 3rd story, 1st apartment from east at south
Feb 6, 2021 · Apt 6
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 4th room from north located at apt 10, 4th story, 2nd apartment from east at south
Feb 6, 2021 · Apt 10
Open — Nov certified late - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Feb 6, 2021 · Apt 6
Open — Nov certified late - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 6, 3rd story, 1st apartment from east at south
Feb 6, 2021 · Apt 6
Open — Nov certified late - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room in cellar locked at back of the building
Feb 6, 2021
Open — Nov certified late - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes houehold items at 5th story balcony, front stack at fire escape
Jul 5, 2020
Closed — Violation dismissed
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 16, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 9, 2015
Dob violation - dismissed - Construction other optional
Filed a certificate form application etc containing a material of false statement(s) noted under application # 121993780
May 6, 2015
Dob violation - dismissed - Construction other optional
Filed a certificate form application etc containing a material of false statement(s) noted under application # 121993780
May 6, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 3, 2014
Dob violation - dismissed - Plumbing none
Work no permit in apt #4 new plumbing waste stack, hot & cold water lines feeding upper apts remedy: obtain permits
Sep 13, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 26, 2014
Dob violation - dismissed
ECB violations · 23
- Class - 2
Occupancy contrary. job 121845003 indicates apartment 9 with no bedrooms. noted: apartment 9 converted to 2 bdrm apartment with beds, clothing, and personal items., discontinue illegal occupancy or amend c of o
Jan 21, 2022
Resolve - Class - 2
Work without a permit. noted: at apartment 9 at 4th fl erected full height partition walls with doors creating 2 bedrooms and relocation of apartment entry door., obtain all permits
Jan 21, 2022 · Penalty $625
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: at rear fireescape. 2nd sty balcony obstructed w/a block garbage bag full of construction encumbrances & other objects or items left. at main stairs 5th
Sep 16, 2015 · Penalty $1,000
Resolve - Class - 2
Exit door not self-closing.noted:observed at time of insp.the apt.exit fire proof doors not to be self closing at apt.units #4,#8,#10,#11 & 16.fire proof exit apt.door need to be self close to keep the public a
May 6, 2015 · Penalty $500
Resolve - Class - 1
Failure to maintian bldg in code complaint manner.noted:observed at time of insp.at apt/#11 part of the stucco ceiling compared and crack allowing debris and dust to enter rooms the ceiling and roof into the oc
May 6, 2015 · Penalty $1,000
Resolve - Class - 2
Altered/changed bldg occupied w/o a valid certificate of occupancy.as per 28-118.3.1 & 28-118.3.2 noted:job #121510980 alt-1 was file at premises to change the use of the 1st floor from residential use to retai
May 6, 2015 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in code-compliant manners.insp time 12:45pm @above date.@ time of insp i observed fresh air vent for main house trap not connected & open in the cellar.inatiquit vent system.photos take
Mar 27, 2015
Resolve - Class - 1
Gas being supplied to bldg without inspection & certification by dob. inspection time 12:45pm at above date. at time of inspection i observed new installation of new gas piping from existing used gas meter wit
Mar 27, 2015
Resolve - Class - 1
Failure to have new or altered system tested. inspection time 12:45pm at above date. at time of inspection i observed new installation of gas piping from existing used meter with new meter bar to new boiler &
Mar 27, 2015
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner.insp time 12:45pm @ above date.@ time of insp i observed main house trap not connected to the fresh air vent & pipe is open in the cellar & are the foul smell c
Mar 27, 2015 · Penalty $2,500
Resolve
Show 13 more ↓
- Class - 1
Failure to comply w/an order of the commissioner. noted: at time of inspection no supported scaffold on site supported scaffold was removed while being on stop work order issued on 9/3/14. rmdy:comply w/commiss
Sep 15, 2014 · Penalty $12,000
Resolve - Class - 1
Work w/o a permit.observed @ 9:15am in apt #4 new plumbing piping installed,waste stack,hot & cold water piping to supply upper apts-work permit on file 122105783-states work in apt-7-3fl & 12-4fl only.rem:obta
Sep 13, 2014
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection for alt #122105782 for renovation of apt 7 & 12. noted at time of inspection apts fully gutted & work being performed all workers at
Sep 12, 2014 · Penalty $250
Resolve - Class - 2
Failure to maintain: noted: at apt 3 walls (plaster) in bathroom is deteriorated & cracked along w/sections of walls in (kitchen) area that is crack at the seem - floors in kitchen are sagging & uneven.
Sep 12, 2014 · Penalty $250
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations for alt 2 appl #122105782 for renovation of apt 7 & 12. noted at time of inspection at apt 3 of which is (below) apt 7 that has
Sep 12, 2014 · Penalty $1,200
Resolve - Class - 1
3314.8 partial swo issued for supported scaffold pursuant 28-207.2 andposted on premises.failure to provide guardrails and endrails.noted:attime of inspection supported scaffold at exp#1 missing guardrails and
Sep 3, 2014 · Penalty $1,600
Resolve - Class - 1
3314.5 partial swo issued for supported scaffold pursuant 28-207.2 and posted on premises. failed to fully planked working levels.noted:at time of inspection working levels for supported scaffold at exp#1 are
Sep 3, 2014 · Penalty $1,600
Resolve - Class - 2
Partial swo issued for suspended scaffold pursuant 28-207.2 & posted on premises.failed to notify dept.prior to use/inst. of c-hooks in connection w/suspended scaffold noted at time of inspec. 2-c-hooks in conn
May 20, 2014 · Penalty $800
Resolve - Class - 2
Sidewalk shed parapet panel not in compliance.noted:@ time of insp.sidewalk shed parapet panel does not contain:(1)the street address of the site.(2)the statement for more information visit www.nyc.gov/building
May 5, 2014 · Penalty $4,000
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner. noted: in apt 5 in rear room, a separation at corner of ceiling runs approx 6' also notedin bathroom ceiling, slight cracking and water damage at corner above
Jan 31, 2014 · Penalty $2,500
Resolve - Class - 2
Failure to install ground-fault circuit interrupter (gfci) protection as requried entire temporary wiring installation: no gfci circuit provided for lighting fixtures and receptacle outlets. rmdy:install gfci
Dec 16, 2013
Resolve - Class - 1
Electrical work w/o a permit. bsmt service equipment: 200 amp service switch,service entrance conductor. "please note" these two aps: m348485, m347144 not covered the above work. rmdy: obtain permit.
Dec 16, 2013 · Penalty $8,000
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment,apparatus, materials,devices,appliances or wiring in use. the entire temporary installation:open defective wiring are in use, receptacles and lighitng on the sa
Dec 16, 2013
Resolve
Complaints
- Plumbing
Water supply
Jun 12, 2026 · Apt 3
Close - Plumbing
Water supply
Jun 12, 2026 · Apt 11
Close - Water leak
Heavy flow
Jun 10, 2026 · Apt 3
Close - Water leak
Slow leak
May 26, 2026 · Apt 11
Close - Water leak
Slow leak
May 20, 2026 · Apt 3
Close - Water leak
Slow leak
Mar 30, 2026 · Apt 5
Close - Unsanitary condition
Garbage/recycling storage
Sep 5, 2025 · Apt BLDG
Close - Electric
No lighting
Sep 4, 2025 · Apt 3
Close - Unsanitary condition
Pests
Sep 4, 2025 · Apt 3
Close - Door/window
Door
Jul 16, 2025 · Apt BLDG
Close
Show 40 more ↓
- General
Ventilation system
Jun 11, 2025 · Apt 12
Close - Plumbing
Bathtub/shower
Dec 24, 2024 · Apt 3
Close - Heat/hot water
Apartment only
Dec 16, 2024 · Apt 3
Close - Heat/hot water
Entire building
Dec 16, 2024 · Apt BLDG
Close - Outside building
Roofing
Oct 7, 2024 · Apt 3
Close - Plumbing
Basin/sink
Sep 8, 2024 · Apt 11
Close - Plumbing
Basin/sink
Sep 8, 2024 · Apt 11
Close - Plumbing
Basin/sink
Sep 8, 2024 · Apt 11
Close - Unsanitary condition
Pests
Aug 3, 2024 · Apt BACKYA
Close - Door/window
Door
Aug 3, 2024 · Apt FRONTD
Close - Door/window
Door
Jan 19, 2024 · Apt BLDG
Close - Door/window
Door
Jan 19, 2024 · Apt BLDG
Close - General
Mailbox
Jan 16, 2024 · Apt 3
Close - Electric
No lighting
Dec 21, 2023 · Apt 3
Close - Door/window
Door
Dec 21, 2023 · Apt 3
Close - Door/window
Door
Oct 22, 2023 · Apt 3
Close - Door/window
Door
Oct 2, 2023 · Apt 3
Close - Unsanitary condition
Garbage/recycling storage
Oct 2, 2023 · Apt 3
Close - Unsanitary condition
Pests
Oct 2, 2023 · Apt 3
Close - Unsanitary condition
Pests
Oct 2, 2023 · Apt 3
Close - Unsanitary condition
Pests
Jun 8, 2023 · Apt 3
Close - Electric
Lighting
Jun 8, 2023 · Apt 3
Close - Electric
Power outage
Mar 24, 2022 · Apt 3
Close - General
Bell/buzzer/intercom
Feb 18, 2022 · Apt 3
Close - Heat/hot water
Apartment only
Jan 21, 2022 · Apt 10
Close - General
Bell/buzzer/intercom
May 18, 2021 · Apt 6
Close - Unsanitary condition
Mold
May 18, 2021 · Apt 6
Close - Plumbing
Water supply
May 18, 2021 · Apt 6
Close - Safety
Fire escape
Mar 21, 2021 · Apt 1
Close - Door/window
Door
Mar 21, 2021 · Apt 1
Close - Water leak
Slow leak
Feb 26, 2021 · Apt 11
Close - Heat/hot water
Apartment only
Feb 26, 2021 · Apt 11
Close - Heat/hot water
Apartment only
Feb 21, 2021 · Apt 5
Close - Heat/hot water
Apartment only
Feb 17, 2021 · Apt 6
Close - Heat/hot water
Entire building
Feb 15, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 13, 2021 · Apt 11
Close - Heat/hot water
Apartment only
Jan 31, 2021 · Apt 6
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt BLDG
Close - Appliance
Refrigerator
Jan 10, 2021 · Apt 6
Close - Door/window
Window frame
Jan 10, 2021 · Apt 6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C4)
- Year built
- 1900
- Floors
- 5
- Residential units
- 16
- Building area
- 9,310 ft²
- Lot area
- 1,909 ft²
- Zoning
- C6-2
- Community board
- 102
- Council district
- 1
- Block / lot
- 479 / 17
- Assessed value
- $1,906,200
- Landmark / historic district
- No
HPD registration #106845, last renewed Oct 10, 2025.
Questions about 22 Spring Street
Who owns 22 Spring Street?
The owner of record in NYC Department of City Planning PLUTO data is 22 Spring Sm LLC.
Does 22 Spring Street have violations?
Yes. NYC HPD has recorded 236 housing violations at this property.
Is 22 Spring Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 38% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 22 Spring Street built?
City records list 1900 as the year it was built.
How many apartments are in 22 Spring Street?
It has 16 residential units and 18 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.