roofy

168 Mulberry Street

Manhattan, NY 10013BBL 1-00471-0031Map

Owner of record: 166-168-170 Mulberry Street HDFC

168 Mulberry Street is a walk-up apartment building built in 1900 in Manhattan, 10013. It has 18 residential units across 5 floors. The owner of record is 166-168-170 Mulberry Street HDFC. HPD has recorded 22 housing violations here, most recently on November 1, 2016. 6 of the 22 most recent violations are still open.

HPD violations
22
DOB violations
6
ECB violations
7
HPD complaints
16

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Nov 1, 2016

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 22

  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Nov 1, 2016

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box that is missing at public hall, 1st story

    Nov 1, 2016

    Open — Nov sent out
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor that is missing at public hall, 1st story

    Nov 1, 2016

    Open — Nov sent out
  • C

    Fire escape defective. properly secure the loose and hanging 1st metal tread from bottom at the 2nd sty balcony at the front fire escape

    Nov 1, 2016

    Closed — Violation closed
  • C

    Fire escape defective. properly secure the loose and hanging 12th metal tread from bottom at the 5th sty balcony at the front fire escape

    Nov 1, 2016

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of canopy installed at the 1st sty obstructing the drop ladder from landing at the front fire escape

    Nov 1, 2016

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing located at apt d3, 4th story, 2nd apartment from east at south , section at east

    Oct 3, 2014 · Apt D3

    Open — Second no access to re-inspect violation
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt d3, 4th story, 2nd apartment from east at south , section at east

    Oct 3, 2014 · Apt D3

    Open — Second no access to re-inspect violation
  • C

    M/d law abate the nuisance consisting of free standing radiator, at public hall, 2nd story, section at east

    Oct 3, 2014

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of uncapped steam riser , at public hall, 1st story

    Oct 3, 2014

    Closed — Violation closed
Show 12 more ↓
  • C

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling, south & east walls throughout at public hall, 1st story

    Sep 11, 2014

    Closed — Violation closed
  • C

    Properly secure the loose ceiling light fixtures at vestibule hall and public hall, 1st sty.

    Sep 11, 2014

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of uncapped heating supply pipe at north at public hall, 1st story

    Sep 11, 2014

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceilings at all sty's with fire retarding materials at public hall

    Jun 16, 2014

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective walls at all sty's with fire retarding materials at public hall

    Jun 16, 2014

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed b x cables at the ceilings and walls at all sty's at public hall

    Jun 16, 2014

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt e4, 5th story, 1st apartment from north at east

    Jan 8, 2014 · Apt E4

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from north located at apt e4, 5th story, 1st apartment from north at east

    Jan 8, 2014 · Apt E4

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt e4, 5th story, 1st apartment from north at east

    Jan 8, 2014 · Apt E4

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceilings and walls in the entire apartment located at apt e4, 5th story

    Oct 2, 2013 · Apt E4

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt e4, 5th story

    Oct 2, 2013 · Apt E4

    Closed — Violation closed
  • B

    Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 200 watt minimum required at front areaway

    May 4, 2000

    Closed — Violation closed

DOB building violations · 6

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 8, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 7

  • Class - 2

    Failure to comply w/the commissioner's order to file a certificate of correction with dept.of bldgs.note: viol.#:35065252l/100213er02rws04 hearing status currently:in violation & cert. status:no compliance.rem

    Jul 31, 2014 · Penalty $2,000

    Resolve
  • Class - 1

    File a cert of correction or other related materials containing material false statements.noteed:respondent filed a cert of correction on 6/23/14 for nov #35074176n upon insp on found that conditions described

    Jul 7, 2014

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dept. of bldg. noted : repondent failed to comply w/commissioner's order to correct violating conditions & file a cert. of

    Jul 7, 2014

    Resolve
  • Class - 1

    Failure to safeguard persons+property affected by cons operation.noted:pipe scaffold @ rear fire escape obstructs egress from rear occupied apts to street.scaffold notes for job#121704824 indicate that erection

    Jul 7, 2014

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected/by const operations.note:facade work in progress w/ app # 121 w/ scaffolding obstructing fire escapes @ rear exterior wall obstructing egress for occupants w

    May 6, 2014 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at job site. at time of inspection construction work has been done under alt 2 #121606636,alt 2 #121637229 after hrs variance permit posted observed. stop all work.

    Nov 2, 2013

    Resolve
  • Class - 2

    Failure to maintain bldg code compliant manner. noted: at interior apt 4b cracks & separations in plaster located at walls ceilings & door ways throughout. remedy: repair & replace.

    Oct 2, 2013 · Penalty $500

    Active

Complaints

  • Heat/hot water

    Entire building

    Jan 8, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 20, 2014 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2014 · Apt B1

    Close
  • Electric

    Wiring

    Sep 8, 2014 · Apt D1

    Close
  • Electric

    Wiring

    Sep 8, 2014 · Apt D1

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 8, 2014 · Apt D1

    Close
  • General

    Bell/buzzer/intercom

    Sep 8, 2014 · Apt D1

    Close
  • Paint/plaster

    Ceiling

    Jun 10, 2014 · Apt E2

    Close
  • Paint/plaster

    Wall

    Jun 10, 2014 · Apt E2

    Close
Show 6 more ↓
  • Electric

    Wiring

    Jun 10, 2014 · Apt E2

    Close
  • Plumbing

    Water supply

    Mar 3, 2014 · Apt B4

    Close
  • Heating

    Heat related

    Feb 28, 2014 · Apt NA

    Close
  • General

    Cooking gas

    Jan 30, 2014 · Apt BLDG

    Close
  • Electric

    Bell-buzzer/intercom

    Jan 17, 2014 · Apt BLDG

    Close
  • Electric

    Bell-buzzer/intercom

    Sep 15, 2012 · Apt B4

    Close

Sales history

DatePriceTypeUnits
Jul 8, 2026$695,000Coops - walkup apartments—

Building details

Building type
Walk-up apartment building (C6)
Year built
1900
Floors
5
Residential units
18
Building area
12,280 ft²
Lot area
5,027 ft²
Zoning
C6-2G
Community board
102
Council district
1
Block / lot
471 / 31
Assessed value
$2,077,650
Landmark / historic district
No

HPD registration #130460, last renewed Jul 30, 2026.

Questions about 168 Mulberry Street

Who owns 168 Mulberry Street?

The owner of record in NYC Department of City Planning PLUTO data is 166-168-170 Mulberry Street HDFC.

Does 168 Mulberry Street have violations?

Yes. NYC HPD has recorded 22 housing violations at this property.

Is 168 Mulberry Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 168 Mulberry Street built?

City records list 1900 as the year it was built.

How many apartments are in 168 Mulberry Street?

It has 18 residential units and 20 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.