125 Allen Street
Manhattan, NY 10002BBL 1-00415-0033Map
Owner of record: 125-127 Allen St Assoc
125 Allen Street is a walk-up apartment building built in 1900 in Manhattan, 10002. It has 24 residential units across 6 floors. The owner of record is 125-127 Allen St Assoc. HPD has recorded 536 housing violations here, most recently on April 29, 2026. 38 of the 50 most recent violations are still open. City tax records listed 24 rent-stabilized apartments here in 2024.
- HPD violations
- 536
- DOB violations
- 8
- ECB violations
- 19
- HPD complaints
- 538
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 536
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of uncapped gas pipe at east wall in the kitchen located at apt 1c, 1st story, 1st apartment from north at east
Jul 18, 2025 · Apt 1C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the kitchen located at apt 1c, 1st story, 1st apartment from north at east
Jul 18, 2025 · Apt 1C
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Nov 20, 2024
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective concrete lintel over building entrance door at public hall, 1st story
Nov 20, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of illegal wire tapping at the ceiling at public hall, 5th story
Nov 13, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of illegal wire tapping at the ceiling at public hall, 4th story
Nov 13, 2024
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at all walls and ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the bathroom , the 3rd room from east, the kitchen located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain glazed finish at bathtub in the bathroom located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the bathroom located at apt 1c, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1C
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2024
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock on the building's entrance door at public hall, 1st story
Mar 5, 2024
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of garbage stored at public hall, 1st story
Mar 5, 2024
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass at the vestbule door at public hall, 1st story
Mar 5, 2024
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire rated material at the ceiling at public hall, 1st story
Mar 5, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling at public hall, 1st story
Mar 5, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice at public hall
Nov 21, 2023
Open — Nov sent out - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the refuse at public hall
Nov 21, 2023
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling , 1st story
Oct 26, 2023
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall at public hall, 4th story
Oct 26, 2023
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling , 1st story
Oct 26, 2023
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at east bulkhead door , 6th story
Oct 26, 2023
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at public hall stairs, 3rd story
Oct 26, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall stairs, 3rd story
Oct 26, 2023
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall at public hall stairs, 3rd story
Oct 26, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Oct 26, 2023
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Oct 26, 2023
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 3rd story
Oct 26, 2023
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at door at vestibule , 1st story
Oct 26, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, and south wall at public hall, 6th story
Oct 26, 2023
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall at public hall, 6th story
Oct 26, 2023
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling south and west walls at public hall, 6th story
Oct 26, 2023
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall at public hall, 5th story
Oct 26, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall at public hall stairs, 4th story
Oct 26, 2023
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall stairs, 4th story
Oct 26, 2023
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling , 1st story
Oct 26, 2023
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling at public hall, 1st story
Jun 30, 2023
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and south wall at public hall, 1st story
Jun 30, 2023
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building entrance door , 1st story
Jun 30, 2023
Closed — Violation closed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 19
- Class - 1
Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or wiring in use. double lugging in 100 amp disconnect switch in basement. remedy: comply with ec code
Oct 24, 2018
Resolve - Class - 2
Work w/o a permit. i observed on the ground floor in allen's cut and shave barbershop, 3pc bathroom insalled....shower, toilet and lavatory.alt the plumbing work and installation was done w/o a permit. rmdy:ob
Oct 24, 2018
Resolve - Class - 1
Failure to ground electrical systems. no water ground conductor provided to service switch in basement. remedy: provide grounding
Oct 24, 2018
Resolve - Class - 1
Electrical work w/o a permit. observed at 2:00pm branch circuit wiringinstalled for fixtures outlets switches hvac unit in barbershop. no application on file for electrical work in barbershop. remedy:obtain per
Oct 24, 2018
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or wiring in use. expose electrical wiring and defective fixtures throughout building and no disconnect switch for hvac c
Oct 24, 2018
Resolve - Class - 3
Electrical work without a permit. observed at 2:30pm (1) electric atm sign connection installed in electric sign. no application on file forelectric sign. remedy: obtain permit
Oct 10, 2018
Resolve - Class - 2
Electrical work without a permit. observed at 2:30pm (1) atm sign installed in front of building. no application on file for electric sign. remedy: obtain permit
Oct 10, 2018
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or wiring in use. seal tight in excess installed inatm sign in front of building and expose wiring in hallways. remedy:co
Oct 10, 2018
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/vio # 35249276m issued on 05/07/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for changing occupancy w/o a valid c of o. remedy:
Sep 23, 2017 · Penalty $2,000
Resolve - Class - 2
Failure to notify the dept prior to installation of equipment. note i observed c-hooks in connection with rope on parapet wall w/o notification number worker were on the process of installing the platform. dur
Aug 9, 2017 · Penalty $400
Active
Show 9 more ↓
- Class - 2
Failure to comply with the commissioners order contained in summons/violation #35249276m issued on 05/08/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.altered/changed bldg occ
Aug 2, 2017 · Penalty $2,000
Resolve - Class - 1
Failure to comply w/commissioneres order contained in summons/violation#35249277y issued on 05/08/17 and to file a cofc pursuant ot 28-201.1and 1rcny 102-01.apts 2b&3d partitions in each apt.to create three add
Jun 26, 2017
Resolve - Class - 2
Failure to comply w/commissioners order contained in summons/violatio n#35249276m issued on 05/08/17 and to file a cofc pursuant to 28-201.1 and 1rcny 102-01.apts 2b &3d each created three occupied rooms.rem:co
Jun 26, 2017 · Penalty $2,000
Resolve - Class - 2
Work without a permit.work noted:in apt#6a observed full partitions were erected to create extra rooms.partitions size approx 1)11ft h x 11ft l 2)8ft l x 11ft h.100% of work done without permit.obtain permit or
May 20, 2017 · Penalty $400
Resolve - Class - 1
Altered/changed bldg occupied w/o a valid certificate of occupancy. noted: 4 occupied rooms were added/created in apt 3d and apt 2b (2 extra rooms in each apt) contrary to cofo #85482 and icard 127286 which
May 8, 2017 · Penalty $500
Resolve - Class - 1
Work w/o permit. work noted: in apt #2b and apt 3d observed full partitions were erected to create 3 rooms in each apt. 100% of work done w/o permitl rmdy:obtain all required permit or restore premise to leg
May 8, 2017
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner. noted: respondent removed suspended scaffold from the job site while being on notice of swo issued on 10.10.13.remedy:comply w/the commissioner's
Jan 15, 2014
Resolve - Class - 1
Licensed rigger failed to ensure scaffold worker met minimum requirement. noted: at time of inspection 2 workers on a rope scaffold between 127 allen st & 125 allen st workers do not have cert of fitness (no id
Oct 10, 2013
Resolve - Class - 1
Sec. 9-01 rigger failed to name a designated forman. noted: at time ofinspection 2 workers on a rope scaffold in light well between 127 allen st & 125 allen st no rigging forman present. remedy: comply w/rule
Oct 10, 2013
Resolve
Complaints
- Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 24, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Oct 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 11, 2025 · Apt 4B
Close - Unsanitary condition
Pests
Aug 13, 2025 · Apt 3B
Close - General
Cooking gas
Jul 9, 2025 · Apt 1C
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Nov 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 18, 2024 · Apt BLDG
Close - Water leak
Slow leak
Oct 25, 2024 · Apt 1C
Close - Paint/plaster
Wall
Oct 25, 2024 · Apt 1C
Close - Unsanitary condition
Garbage/recycling storage
Oct 25, 2024 · Apt 1C
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 1C
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 1C
Close - Water leak
Slow leak
Oct 25, 2024 · Apt 1C
Close - Paint/plaster
Wall
Oct 25, 2024 · Apt 1C
Close - Plumbing
Basin/sink
Oct 25, 2024 · Apt 1C
Close - Flooring/stairs
Floor
Oct 25, 2024 · Apt 1C
Close - Plumbing
Basin/sink
Oct 25, 2024 · Apt 1C
Close - Plumbing
Bathtub/shower
Oct 25, 2024 · Apt 1C
Close - Unsanitary condition
Mold
Oct 25, 2024 · Apt 1C
Close - Plumbing
Toilet
Oct 25, 2024 · Apt 1C
Close - Paint/plaster
Ceiling
Oct 25, 2024 · Apt 1C
Close - Unsanitary condition
Pests
Oct 25, 2024 · Apt 1C
Close - Heat/hot water
Entire building
Apr 28, 2024 · Apt 3B
Close - Heat/hot water
Entire building
Apr 28, 2024 · Apt 3D
Close - Unsanitary condition
Pests
Mar 11, 2024 · Apt 2D
Close - Unsanitary condition
Pests
Feb 16, 2024 · Apt 2D
Close - Unsanitary condition
Pests
Feb 3, 2024 · Apt 2D
Close - Heat/hot water
Apartment only
Jan 19, 2024 · Apt 6C
Close - Heat/hot water
Apartment only
Jan 19, 2024 · Apt 2A
Close - Unsanitary condition
Pests
Jan 6, 2024 · Apt 2D
Close - Paint/plaster
Wall
Jan 6, 2024 · Apt 2D
Close - Plumbing
Water supply
Aug 30, 2023 · Apt 2B
Close - Electric
Power outage
Aug 30, 2023 · Apt 2B
Close - Water leak
Damp spot
Jun 26, 2023 · Apt 1A
Close - Electric
No lighting
Jun 26, 2023 · Apt 1A
Close - Unsanitary condition
Pests
Jun 26, 2023 · Apt 1A
Close - Water leak
Heavy flow
Jun 26, 2023 · Apt 1A
Close - Door/window
Door
Jun 26, 2023 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Jun 26, 2023 · Apt 1A
Close - Door/window
Door
Jun 26, 2023 · Apt 1A
Close - Water leak
Heavy flow
Jun 26, 2023 · Apt 1A
Close - Plumbing
Basin/sink
May 12, 2023 · Apt 3D
Close - Water leak
Damp spot
Apr 1, 2023 · Apt 1A
Close - Paint/plaster
Ceiling
Apr 1, 2023 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 5, 2023 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1900
- Floors
- 6
- Residential units
- 24
- Building area
- 10,254 ft²
- Lot area
- 2,204 ft²
- Zoning
- C4-4A
- Community board
- 103
- Council district
- 1
- Block / lot
- 415 / 33
- Assessed value
- $787,950
- Landmark / historic district
- No
HPD registration #127286, last renewed Jul 17, 2026.
Questions about 125 Allen Street
Who owns 125 Allen Street?
The owner of record in NYC Department of City Planning PLUTO data is 125-127 Allen St Assoc.
Does 125 Allen Street have violations?
Yes. NYC HPD has recorded 536 housing violations at this property.
Is 125 Allen Street rent stabilized?
NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2024 (about 100% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 125 Allen Street built?
City records list 1900 as the year it was built.
How many apartments are in 125 Allen Street?
It has 24 residential units and 26 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.