roofy

127 Allen Street

Manhattan, NY 10002BBL 1-00415-0032Map

Owner of record: 125-127 Allen St Assoc

127 Allen Street is a walk-up apartment building built in 1910 in Manhattan, 10002. It has 24 residential units across 6 floors. The owner of record is 125-127 Allen St Assoc. HPD has recorded 461 housing violations here, most recently on October 5, 2026. 49 of the 50 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.

HPD violations
461
DOB violations
8
ECB violations
3
HPD complaints
572

What to know

Concern
18 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
1
About 4% of the building's 24 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 461

  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Oct 5, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall, north wall, south wall, east wall in the kitchen located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • C

    Properly repair and abate unsafe electric wiring condition consisting of multiple electrical extension cords connected to electrical outlet next to electrical panel at south wall in the kitchen located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Sep 27, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 3 in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the 3rd room from east located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the kitchen located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ele trical light fixture at ceiling in the 1st room from east located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall, 1st radiator from west at north wall in the kitchen located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Sep 27, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 22, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6c, 6th story, 1st apartment from west at north

    Sep 22, 2026 · Apt 6C

    Open — Invalid certification
  • C

    Provide ready access to buildings heating system basement entrance door locked at boiler room

    Sep 22, 2026

    Open — Nov certified late
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Sep 22, 2026 · Apt 6C

    Open — Nov certified late
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 6c, 6th story, 1st apartment from west at north

    Sep 22, 2026 · Apt 6C

    Open — Civ14 mailed
  • C

    Provide ready access to buildings heating system locked door at basement

    Sep 16, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 2nd apartment from west at north

    Sep 16, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from east located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 4th room from east located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation radiator at west wall in the 4th room from east located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective defective gasket at top and bottom of refrigerator in the kitchen located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 4th room from east located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective connection wasteline at wash basin in the bathroom located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • C

    Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sqft at ceiling in the bathroom located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 1st apartment from west at north

    Jul 29, 2026 · Apt 6C

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Jul 29, 2026

    Open — Nov certified late
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from east, the 1st room from east located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the mold at bathtub in the bathroom located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective wood at floor in the 3rd room from east located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from east located at apt 6c, 6th story, 1st apartment from east at south

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at west wall in the kitchen located at apt 6c, 6th story, 1st apartment from west at north

    Jul 20, 2026 · Apt 6C

    Open — Nov sent out

DOB building violations · 8

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 15, 2014

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 3

  • Class - 2

    Failure to maintain building in code-compliant manner. i observed at apart. 6c ,the floor is sagging ,cracks at different location ,walls and ceiling covered with tape, improper electrical connection with exten

    Aug 17, 2026 · Penalty $1,250

    Active
  • Class - 1

    Licensed rigger failed to ensure scaffold worker met minimum requirement. noted at time of inspection 2 workers on rope scaffold in light well between 127 allen st & 125 allen st workers do not have cert of fit

    Oct 10, 2013 · Penalty $1,600

    Active
  • Class - 1

    Sec. 9-01 rigger failed to name a designated forman. noted: at time ofinspection 2 workers on rope scaffold in light well between 127 allen st & 125 allen st no rigging forman present. remedy: comply w/rule

    Oct 10, 2013 · Penalty $1,600

    Active

Complaints

  • Electric

    Power outage

    Oct 3, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Mold

    Oct 1, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Oct 1, 2026 · Apt 6C

    Close
  • Safety

    Window guard broken/missing

    Oct 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Sep 26, 2026 · Apt 6C

    Close
  • Paint/plaster

    Wall

    Sep 24, 2026 · Apt 6C

    Close
  • Paint/plaster

    Ceiling

    Sep 24, 2026 · Apt 6C

    Close
  • Heat/hot water

    Apartment only

    Sep 19, 2026 · Apt 6C

    Close
  • Paint/plaster

    Wall

    Sep 18, 2026 · Apt 6C

    Close
  • Heat/hot water

    Apartment only

    Sep 14, 2026 · Apt 6C

    Close
Show 40 more ↓
  • General

    Bell/buzzer/intercom

    Sep 2, 2026 · Apt 6C

    Close
  • General

    Bell/buzzer/intercom

    Aug 21, 2026 · Apt 6C

    Close
  • Electric

    Wiring

    Aug 3, 2026 · Apt 6C

    Close
  • General

    Bell/buzzer/intercom

    Aug 3, 2026 · Apt 6C

    Close
  • Heat/hot water

    Apartment only

    Jul 27, 2026 · Apt 2C

    Close
  • Appliance

    Refrigerator

    Jul 24, 2026 · Apt 6C

    Close
  • Safety

    Window guard broken/missing

    Jul 23, 2026 · Apt 6C

    Close
  • Heat/hot water

    Apartment only

    Jul 23, 2026 · Apt 6C

    Close
  • Paint/plaster

    Wall

    Jul 18, 2026 · Apt 6C

    Close
  • Heat/hot water

    Apartment only

    Jul 18, 2026 · Apt 6C

    Close
  • Appliance

    Refrigerator

    Jul 9, 2026 · Apt 6C

    Close
  • Flooring/stairs

    Floor

    Jul 3, 2026 · Apt 6C

    Close
  • Safety

    Window guard broken/missing

    Jul 3, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Mold

    Jul 3, 2026 · Apt 6C

    Close
  • Water leak

    Damp spot

    Jul 3, 2026 · Apt 6C

    Close
  • Unsanitary condition

    Pests

    Jul 3, 2026 · Apt 6C

    Close
  • Appliance

    Refrigerator

    Jul 3, 2026 · Apt 6C

    Close
  • Flooring/stairs

    Floor

    Jul 3, 2026 · Apt 6C

    Close
  • Electric

    No lighting

    Jul 3, 2026 · Apt 6C

    Close
  • Door/window

    Door frame

    Jul 3, 2026 · Apt 6C

    Close
  • Electric

    Outlet/switch

    Jul 3, 2026 · Apt 6C

    Close
  • Flooring/stairs

    Floor

    Jul 3, 2026 · Apt 6C

    Close
  • Electric

    Power outage

    Jul 3, 2026 · Apt 6C

    Close
  • Electric

    Wiring

    Jul 3, 2026 · Apt 6C

    Close
  • Door/window

    Window pane

    Jul 3, 2026 · Apt 6C

    Close
  • Flooring/stairs

    Floor

    Jul 3, 2026 · Apt 6C

    Close
  • Paint/plaster

    Door/frame

    Jul 3, 2026 · Apt 6C

    Close
  • Heat/hot water

    Apartment only

    Jul 3, 2026 · Apt 6C

    Close
  • Paint/plaster

    Radiator

    Jul 3, 2026 · Apt 6C

    Close
  • Paint/plaster

    Ceiling

    Jul 3, 2026 · Apt 6C

    Close
  • Paint/plaster

    Wall

    Jul 3, 2026 · Apt 6C

    Close
  • Paint/plaster

    Wall

    Jul 3, 2026 · Apt 6C

    Close
  • Flooring/stairs

    Floor

    Jul 3, 2026 · Apt 6C

    Close
  • General

    Ventilation system

    Jul 3, 2026 · Apt 6C

    Close
  • Safety

    Carbon monoxide detector

    Jul 3, 2026 · Apt 6C

    Close
  • Plumbing

    Basin/sink

    Jul 3, 2026 · Apt 6C

    Close
  • Plumbing

    Bathtub/shower

    Jul 3, 2026 · Apt 6C

    Close
  • Plumbing

    Bathtub/shower

    Jul 3, 2026 · Apt 6C

    Close
  • Plumbing

    Basin/sink

    Jul 3, 2026 · Apt 6C

    Close
  • Plumbing

    Basin/sink

    Jul 3, 2026 · Apt 6C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1910
Floors
6
Residential units
24
Building area
10,254 ft²
Lot area
2,204 ft²
Zoning
C4-4A
Community board
103
Council district
1
Block / lot
415 / 32
Assessed value
$697,950
Landmark / historic district
No

HPD registration #127285, last renewed Jul 8, 2025.

Questions about 127 Allen Street

Who owns 127 Allen Street?

The owner of record in NYC Department of City Planning PLUTO data is 125-127 Allen St Assoc.

Does 127 Allen Street have violations?

Yes. NYC HPD has recorded 461 housing violations at this property.

Is 127 Allen Street rent stabilized?

NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 4% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 127 Allen Street built?

City records list 1910 as the year it was built.

How many apartments are in 127 Allen Street?

It has 24 residential units and 26 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.