1 Peck Slip
Manhattan, NY 10038BBL 1-00106-0009Map
Owner of record: NYC School Construction Authority
1 Peck Slip is a school building built in 1950 in Manhattan, 10038. The owner of record is NYC School Construction Authority. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 39
- ECB violations
- 13
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 39
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2020
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed
Show 29 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 9, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Elevator elevatoroptional
2
Jun 28, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed - Elevator elevatoroptional
2
Apr 7, 1992
Dob violation - dismissed - Elevator elevatorrequired
51-file for moderinzation of ele and new controller
Jan 13, 1989
Dob violation - resolved
ECB violations · 13
- Class - 2
Reissued ecb#35719830y altered/changed building occupied without a valid cofo as per 28-118.3.1,28-118.3.2.noted cofo#1001363-0000001 expired 12/6/22.rem:obtain a valid cofo or discontinue illegal occupancy.
Jun 12, 2026 · Penalty $3,125
Active - Class - 2
Reissued ecb#35719829r failure to maintain building in code-compliant manner.illumination for exits,exit discharges and public corridors perbc 1006.1;27-381.noted:emergency lights at 6th and 4th floors-stair a
Jun 12, 2026 · Penalty $3,125
Active - Class - 2
Reissue#35692506p altered changed building occupied without a valid cofo as per 28-118.3.1-28-118.3.2.noted:at t.o.i.no updated cofo has been issued by dob.rem:obtain valid cofo.
Jun 25, 2025 · Penalty $3,125
Active - Class - 2
Reissue#35692507r failure to maintain building in code compliant manner.illumination for exits,exit discharges and public corridors per bc 1006.1;27-381.noted:at t.o.i.there were several emergency lights scatte
Jun 25, 2025 · Penalty $3,125
Active - Class - 2
Reissue#35675058x date of issue:04.25.2023 altered/changed building occupied without a valid certificate of occupancy as per 28-118.3.1-28-118.3.2.noted observed during inspection of dob records co#1001363-0000
Nov 14, 2024 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code-compliant manner.illumination forexits,exit discharges and public corridors per bc 1006.1;27-381.at the time of inspection noted & observed that at 6th fl staircase a one ex
Nov 14, 2024 · Penalty $625
Active - Class - 2
Altered/changed building occupied without valid certificate of occupancy as per 28-118.3.noted:observe during inspection of dob records co#1001363-0000001 expired 12/6/22,building occupied and utilized as schoo
Apr 25, 2023 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code compliant manner.noted:observed during inspection of fireproof self closing door cafeteria entrance door was not operating/closing at time of test due to defective/missing h
Apr 25, 2023 · Penalty $625
Resolve - Class - 2
Exit door not self closing in first floor in main entrance one door outside at 5th floor at flr a one door at 4th floor at stair a one door not self closing properly when tested at the time of inspection.rmdy:
Apr 23, 2018
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. noted: a piece of metal truck approx 15'long fell from the 6th fl roof to the public street @ time of inspection. remedy: stop al
Apr 23, 2015 · Penalty $2,430
Resolve
Show 3 more ↓
- Class - 1
Bc3309.10 pursuant to section 28-207.2 of the admin code of the city of ny you are hereby ordered to immediately stop all work @ the above prem b/c of fail to protect adjoining roof,skylights,chimmneys & outlet
Aug 7, 2014
Resolve - Class - 2
Failure to safe guard all persons and property affected by construction operation.iron workers have left 2 metal buckets for holding bolts 15' up on a column near the edge in danger of falling on workers below.
Jun 4, 2014 · Penalty $1,200
Resolve - Class - 2
Work w/o a permit.contractor failed to obtain an alt-3 permit for the use of bobcats on flrs 2-4.also,no permit has been obtained for the modification of the existing standpipe system which was switched to a
Jun 4, 2014 · Penalty $400
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 1950
- Floors
- 7
- Residential units
- —
- Building area
- 112,362 ft²
- Lot area
- 17,789 ft²
- Zoning
- C6-2A
- Community board
- 101
- Council district
- 1
- Block / lot
- 106 / 9
- Assessed value
- $11,056,950
- Landmark / historic district
- South Street Seaport Historic District Extension
Questions about 1 Peck Slip
Who owns 1 Peck Slip?
The owner of record in NYC Department of City Planning PLUTO data is NYC School Construction Authority.
Does 1 Peck Slip have violations?
NYC HPD has no housing violations on record for this property.
Is 1 Peck Slip rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1 Peck Slip built?
City records list 1950 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.