Preparing Your Home for Sale: A Room-by-Room Checklist
Room-by-room prep checklist for NYC apartments and houses: declutter, repair, paint, light and photograph, plus permits and alteration papers buyers ask for.
7 min read · Updated
To prepare a home for sale, do three things in order: get your paperwork clean (permits closed, alterations approved, disclosures ready), fix what a buyer or inspector will flag, then declutter, clean and light every room for photos. In NYC the paperwork step is the one most sellers skip, and it is the one most likely to delay a closing.
This checklist works for co-op and condo apartments as well as houses. It also says plainly which fixes tend to be worth it. A dated kitchen is easy for buyers to see and price; a leak stain, a sticking door or an open permit makes them wonder what else is wrong.
At a glance
- Start
- 6–8 weeks out
- Paperwork fixes can take the longest
- Biggest delay risk
- Open permits
- And unapproved alterations in co-ops and condos
- Best-value prep
- Clean, repair, paint
- Before any renovation
- House sellers
- Disclosure form
- Required for 1–4 family homes before contract
Start with the paperwork
Buyers' attorneys and lenders check public records and building files. Problems found after you sign a contract give the buyer leverage, or a reason to walk. Fix them before you list.
Open DOB permits and sign-offs
If you or a previous owner did work that needed a Department of Buildings permit, the job should be closed out. For minor alterations that don't change the Certificate of Occupancy, DOB issues a Letter of Completion once all permits on the job are inspected and signed off and the final cost affidavit (PW3) is verified. Approved letters can be viewed on the DOB NOW public portal. Search your address on Roofy's building lookup to see permits and violations, and ask the contractor or architect who filed the job to finish any open items. See how to read DOB permits.
Certificate of Occupancy
A CO states a building's legal use and occupancy. Buildings built before 1938 generally don't need one unless later work changed their use, egress or occupancy; DOB can issue a Letter of No Objection to confirm legal use instead. You can look up COs issued before March 1, 2021 in BIS and later ones in DOB NOW. If your house is used as a two-family but the CO says one-family, talk to your attorney before you list. The New York disclosure form asks whether there are certificates of occupancy for the property. See reading a Certificate of Occupancy.
Alteration agreements (co-ops and condos)
Most co-ops and condos require board or managing-agent approval for renovations, usually through an alteration agreement. Buyers' attorneys ask whether work such as a moved kitchen, a new bathroom or removed walls was approved. Find your signed agreement and any sign-off letter from the building. If work was done without approval, ask the managing agent how to legalize it now. See renovating a co-op or condo.
Disclosures
- Houses (1–4 family): complete the Property Condition Disclosure Statement. It asks about flood history, fuel tanks, radon, mold tests, roof, structure and systems, and you attach reports you have. See the disclosure guide.
- Built before 1978: prepare the federal lead paint disclosure and gather any lead reports.
- Co-ops and condos: ask the managing agent for the sale package, fee schedule and any planned assessments.
Which fixes are worth doing
| Usually worth it | Usually not worth it | |
|---|---|---|
| Walls | Patch, then repaint in light neutral colors | Expensive wallpaper or feature walls |
| Kitchen | Deep clean, fix drips, replace a broken appliance | Full renovation right before listing |
| Bathrooms | Regrout, recaulk, new shower curtain and towels | Gut renovation |
| Floors | Clean, buff, fix loose boards | Replacing sound floors to change style |
| Systems | Fix leaks, dead outlets, heat, broken windows | Upgrades buyers can’t see |
| Paperwork | Close permits, find alteration approvals | — |
The logic: buyers subtract more than the cost for anything that looks neglected, because it makes them wonder what else is wrong. A major renovation, by contrast, is a matter of taste and rarely recovers its full cost before a sale. Ask your agent for specific advice with costs; see choosing a listing agent.
The room-by-room checklist
Tick items as you finish them. Your progress is saved in this browser.
Get your home ready to sell
0/18Photos and the floor plan
Many buyers decide whether to visit from the photos and floor plan alone. Book a professional photographer after cleaning and decluttering, on a bright day, with every light on. A floor plan with room dimensions matters more in NYC than in most markets, because buyers compare layouts across many similar apartments. If you're selling yourself, you can list your home free on Roofy once photos are ready.
Suggested timeline
8 weeks out
Paperwork audit
Search permits and violations, find alteration approvals, ask the managing agent for the sale package.6 weeks out
Book trades
Contractor or handyman for repairs, painter, and anyone needed to close permits.4 weeks out
Declutter and store
Remove excess furniture and personal items. A short-term storage unit can help.2 weeks out
Repairs and paint
Finish fixes, then paint, then a deep clean.1 week out
Photos and floor plan
Shoot when the home is finished and the weather is bright.Listing day
Showing-ready routine
Daily 15-minute reset: beds made, counters clear, lights on, blinds open.
Next: set a price with how to price your home, estimate what you'll walk away with using the seller net proceeds calculator, and if you're in a co-op, read selling a co-op.
CO purpose, pre-1938 exemption, Letter of No Objection, CO lookup in BIS (pre-March 1 2021) and DOB NOW (after), from the DOB CO page. Letter of Completion for minor alterations, prerequisites (permits signed off, PW3 verified) and public viewing in DOB NOW, from the DOB LOC page. PCDS asks about certificates of occupancy, radon, mold and other test reports, from DOS-1614-f. EPA lead disclosure duties for pre-1978 homes. Alteration agreements, staging and photography advice are general practice; no cost or return-on-investment figures are claimed. Re-verified 2026-10-12 on DOB CO page (pre-1938 rule, Letter of No Objection, BIS before March 1 2021, DOB NOW after) and DOB LOC page (minor alterations, PW3 final cost verified, permits signed off, public DOB NOW viewing); PCDS question 9 asks about certificates of occupancy; EPA pre-1978 duties. No corrections needed.
Sources
- Certificate of Occupancy · NYC Department of Buildings (accessed October 12, 2026)
- Letter of No Objection or Completion · NYC Department of Buildings (accessed October 12, 2026)
- Real Property Law § 462 (Property Condition Disclosure Statement) · New York State Senate (accessed October 12, 2026)
- Property Condition Disclosure Statement, DOS-1614-f (Rev. 02/25) · NYS Department of State (accessed October 12, 2026)
- Real Estate Disclosures about Potential Lead Hazards · US EPA (accessed October 12, 2026)
- Consumer Guide: 10 Questions to Ask a Seller’s Agent · National Association of Realtors (accessed October 12, 2026)
General information, not legal, tax or financial advice. Rules change; confirm with the agency or a professional before you act.