Renovating a Co-op or Condo: Alteration Agreements and Permits

Renovating an NYC co-op or condo takes board approval via an alteration agreement, then DOB permits when needed. The steps, rules and costs to expect.

7 min read · Updated

To renovate a co-op or condo apartment in NYC, you first need the building’s permission, usually by signing an alteration agreement and getting your plans approved by the board or managing agent. Then, if the work goes beyond minor alterations, a licensed architect or engineer files for a Department of Buildings (DOB) permit before any work starts.

Contractor guides focus on design and cost. This guide covers the permission side: what the building will ask for, what the city requires, and how to keep a renovation from stalling halfway.

At a glance

Building approval
Alteration agreement
Set by your co-op or condo
City approval
DOB permit if required
Filed by a PE or RA
Contractor license
DCWP Home Improvement Contractor
Plus Licensed Master Plumber/Electrician
City work hours
Weekdays 7 am–6 pm
Outside that needs a variance

Two approvals, not one

A renovation in an apartment building has two gatekeepers. The building controls whether you can touch its pipes, walls and floors, through the co-op’s proprietary lease and house rules or the condo’s declaration and bylaws. The city controls whether the work meets the Building Code, through DOB permits. Building approval does not replace a permit, and a permit does not override the building’s rules. Most buildings will not let a job start until both are in hand.

The approval path, step by step

  1. 1

    Read the rules and get the alteration package

  2. 2

    Hire an architect or engineer if you need permits

  3. 3

    Submit plans to the board

  4. 4

    Sign the alteration agreement and pay deposits

  5. 5

    File with DOB

  6. 6

    Check for asbestos before demolition

  7. 7

    Build, inspect and close out

What is usually in an alteration agreement

There is no standard city form; each building writes its own. Read for these terms, and ask about anything that is unclear before you sign:

Common alteration agreement terms and what to check
TermWhat it controlsWhat to ask
Scope approvalWhat you may change: walls, kitchen, baths, floors, windows, HVACWhich items need full board review vs. agent sign-off?
“Wet over dry” ruleWhere kitchens and bathrooms may goCan I move a kitchen or bath at all, and with what waterproofing?
Work hours and durationWhen contractors may work and how long the job may takeWhat are the daily hours, and what are the penalties for overruns?
InsurancePolicies your contractors must carry, and who is named as additional insuredCan I get the exact certificate wording to send to contractors?
Deposits and feesSecurity deposit, processing fee, architect review feeWhen is the deposit refunded, and what can be deducted?
Flooring and soundproofingUnderlayment and carpet coverage rules to limit noiseWhat sound rating or underlayment is required?
Riser and shutdown rulesWho may shut off water or gas risers, with what noticeMust the building’s staff or plumber handle shutdowns?
Liability for damageWho pays if a leak damages a neighbor or common areasDo I need to carry extra liability coverage?

The wet over dry rule

Many co-ops and condos ban “wet over dry”: placing a wet room (kitchen, bathroom, laundry) above a neighbor’s dry living space, such as a bedroom or living room. A leak from a bathroom over a bedroom does far more damage than one over another bathroom. If your plan moves a kitchen or bath, expect the board to say no or to require extra waterproofing and inspections. Check the rule before you fall in love with a floor plan, especially when making an offer on an apartment you plan to reconfigure.

Which work needs a DOB permit

DOB lists painting, plastering, installing new cabinets, replacing plumbing fixtures and resurfacing floors as examples of work that does not need a permit. Contractors doing that work must still hold a Department of Consumer and Worker Protection (DCWP) Home Improvement Contractor license, and DOB says ordinary plumbing work that needs no permit must still be done by a Licensed Master Plumber.

Moving walls is where people get caught. Under DOB’s rule 1 RCNY 101-14, permanently removing part of a non-load-bearing, non-fire-rated partition in a residence is exempt only when it is limited to the lesser of 50% of the wall or 45 square feet. Larger removals and structural work need a permit, plumbing and gas work beyond the ordinary work DOB lists needs a plumbing filing, and DOB says no electrical installation or modification may be done without a permit and a Licensed Master Electrician. In certain anti-harassment areas and in single room occupancy buildings, even a small permanent removal needs a permit. Our full guide, do you need a DOB permit?, has a project-by-project table.

Contractors, licenses and insurance

  • General contractor. DCWP requires a Home Improvement Contractor license for construction, repair or remodeling work on any residential building in NYC. DOB also advises a written contract that includes the contractor’s company name, address and license numbers.
  • Plumber and electrician. DOB says ordinary plumbing work, including allowed gas piping work, must be done by a Licensed Master Plumber, and electrical installation or modification needs an electrical permit and a Licensed Master Electrician.
  • Check licenses. DOB points owners to DCWP’s Instant License Check to confirm a home improvement contractor’s license, and its Find Licensed Professionals page explains how to look up DOB-licensed trades.
  • Certificates of insurance. The building will want certificates from every contractor naming the co-op or condo, and often the managing agent, as additional insureds. Get the exact wording from the agent; see certificates of insurance in NYC buildings.
  • Your own policy. Tell your insurer about the project. Your unit policy should cover your improvements once they are done, and your liability if work damages a neighbor. See homeowners insurance basics.

Work hours and neighbors

The city’s baseline is that construction outside 7:00 am to 6:00 pm on weekdays, or any time on Saturday or Sunday, needs an After Hours Variance from DOB. Buildings usually set narrower hours of their own, such as later starts and no work on holidays, and limit when you can use the service elevator. Give neighbors notice before demolition, and keep the hallways clean; complaints are the fastest way to lose the board’s goodwill.

Timeline and budget

Build approval time into your plan. Board review, revisions and DOB filing often take longer than the construction itself, and the clock in your alteration agreement may start when you sign. Budget for the building’s fees, the board architect’s review, permit fees and a contingency on top of construction. If your building has a special assessment coming, factor that in too.

Fact-checked October 12, 2026

Independent re-check 2026-10-12: DOB Do I Need a Permit (no-permit examples, DCWP HIC license, ordinary plumbing by Licensed Master Plumber, Instant License Check). 1 RCNY 101-14 PDF Table 2 III.2 re-read: Group R permanent removal exempt up to lesser of 50% of wall surface or 45 sq ft; exceptions for Special Hudson Yards, Garment Center P-2, Clinton, West Chelsea, Greenpoint-Williamsburg anti-harassment areas, and SRO dwellings. DOB Working on Your Project: RDP rule, only RDP submits construction documents, asbestos investigation, licensed GC, written contract with license numbers, inspections and final sign-off. DOB Obtaining a Permit: most permits via DOB NOW: Build, PE/RA files plans. After Hours Variance: before 7:00 am, after 6:00 pm, Saturday or Sunday. DOB electrical owner requirements: permit plus Licensed Master Electrician (source added). Electrical FAQ: owner needs NYC.ID to be added as stakeholder (claim that the owner must sign the original filing removed as unverified). DCWP HIC license scope verified. Removed unverified "Know Your Construction Professional" directory claim. Alteration agreement terms, wet-over-dry, deposits and building hours are described as common building rules that vary; no amounts asserted.

Sources

  1. Do I Need a Permit? · NYC Department of Buildings (accessed October 12, 2026)
  2. 1 RCNY §101-14: Categories of work that may or may not require a permit · NYC Department of Buildings (accessed October 12, 2026)
  3. Working on Your Project · NYC Department of Buildings (accessed October 12, 2026)
  4. Obtaining a Permit · NYC Department of Buildings (accessed October 12, 2026)
  5. DOB NOW: Build Electrical Filings FAQs · NYC Department of Buildings (accessed October 12, 2026)
  6. After Hours Variances · NYC Department of Buildings (accessed October 12, 2026)
  7. Home Improvement Contractor License Application Checklist · NYC Department of Consumer and Worker Protection (accessed October 12, 2026)
  8. Project Requirements for Owner: Electrical Systems · NYC Department of Buildings (accessed October 12, 2026)
  9. Find Licensed Professionals · NYC Department of Buildings (accessed October 12, 2026)

General information, not legal, tax or financial advice. Rules change; confirm with the agency or a professional before you act.