Renovating a Co-op or Condo: Alteration Agreements and Permits
Renovating an NYC co-op or condo takes board approval via an alteration agreement, then DOB permits when needed. The steps, rules and costs to expect.
7 min read · Updated
To renovate a co-op or condo apartment in NYC, you first need the building’s permission, usually by signing an alteration agreement and getting your plans approved by the board or managing agent. Then, if the work goes beyond minor alterations, a licensed architect or engineer files for a Department of Buildings (DOB) permit before any work starts.
Contractor guides focus on design and cost. This guide covers the permission side: what the building will ask for, what the city requires, and how to keep a renovation from stalling halfway.
At a glance
- Building approval
- Alteration agreement
- Set by your co-op or condo
- City approval
- DOB permit if required
- Filed by a PE or RA
- Contractor license
- DCWP Home Improvement Contractor
- Plus Licensed Master Plumber/Electrician
- City work hours
- Weekdays 7 am–6 pm
- Outside that needs a variance
Two approvals, not one
A renovation in an apartment building has two gatekeepers. The building controls whether you can touch its pipes, walls and floors, through the co-op’s proprietary lease and house rules or the condo’s declaration and bylaws. The city controls whether the work meets the Building Code, through DOB permits. Building approval does not replace a permit, and a permit does not override the building’s rules. Most buildings will not let a job start until both are in hand.
The approval path, step by step
- 1
Read the rules and get the alteration package
Ask the managing agent for the alteration agreement, renovation rules, insurance requirements and fee schedule. Read them before you hire anyone; they decide what is allowed, how long you have, and what you will pay the building. - 2
Hire an architect or engineer if you need permits
DOB says that if your project requires a permit, you must hire a Registered Design Professional, meaning a Professional Engineer (PE) or Registered Architect (RA). Only an RDP can submit construction documents to DOB. Some buildings require stamped drawings even for work that does not need a permit. - 3
Submit plans to the board
The package usually includes drawings, a scope of work, the contractor’s license and insurance, and a schedule. The board often has its own architect or engineer review it, and alteration agreements commonly make the owner pay that reviewer’s fees. - 4
Sign the alteration agreement and pay deposits
The agreement is a contract between you and the co-op or condo. Expect a refundable security deposit against damage and fees for processing and review. Amounts vary by building. - 5
File with DOB
Your architect or engineer files the application, most often through DOB NOW: Build. The property owner must also be added to DOB NOW filings (DOB’s electrical FAQ says the owner needs an NYC.ID account to be added as a stakeholder). In a co-op or condo the corporation or board may act as owner, so ask the managing agent early who handles that and how long it takes. - 6
Check for asbestos before demolition
DOB’s project checklist calls for an asbestos investigation to check for asbestos-containing material that will be removed or disturbed. Older NYC buildings are where this matters most. - 7
Build, inspect and close out
Work within the building’s hours and rules, pass DOB inspections, and get the permit signed off. Then give the building the sign-off paperwork to get your deposit back.
What is usually in an alteration agreement
There is no standard city form; each building writes its own. Read for these terms, and ask about anything that is unclear before you sign:
| Term | What it controls | What to ask |
|---|---|---|
| Scope approval | What you may change: walls, kitchen, baths, floors, windows, HVAC | Which items need full board review vs. agent sign-off? |
| “Wet over dry” rule | Where kitchens and bathrooms may go | Can I move a kitchen or bath at all, and with what waterproofing? |
| Work hours and duration | When contractors may work and how long the job may take | What are the daily hours, and what are the penalties for overruns? |
| Insurance | Policies your contractors must carry, and who is named as additional insured | Can I get the exact certificate wording to send to contractors? |
| Deposits and fees | Security deposit, processing fee, architect review fee | When is the deposit refunded, and what can be deducted? |
| Flooring and soundproofing | Underlayment and carpet coverage rules to limit noise | What sound rating or underlayment is required? |
| Riser and shutdown rules | Who may shut off water or gas risers, with what notice | Must the building’s staff or plumber handle shutdowns? |
| Liability for damage | Who pays if a leak damages a neighbor or common areas | Do I need to carry extra liability coverage? |
The wet over dry rule
Many co-ops and condos ban “wet over dry”: placing a wet room (kitchen, bathroom, laundry) above a neighbor’s dry living space, such as a bedroom or living room. A leak from a bathroom over a bedroom does far more damage than one over another bathroom. If your plan moves a kitchen or bath, expect the board to say no or to require extra waterproofing and inspections. Check the rule before you fall in love with a floor plan, especially when making an offer on an apartment you plan to reconfigure.
Which work needs a DOB permit
DOB lists painting, plastering, installing new cabinets, replacing plumbing fixtures and resurfacing floors as examples of work that does not need a permit. Contractors doing that work must still hold a Department of Consumer and Worker Protection (DCWP) Home Improvement Contractor license, and DOB says ordinary plumbing work that needs no permit must still be done by a Licensed Master Plumber.
Moving walls is where people get caught. Under DOB’s rule 1 RCNY 101-14, permanently removing part of a non-load-bearing, non-fire-rated partition in a residence is exempt only when it is limited to the lesser of 50% of the wall or 45 square feet. Larger removals and structural work need a permit, plumbing and gas work beyond the ordinary work DOB lists needs a plumbing filing, and DOB says no electrical installation or modification may be done without a permit and a Licensed Master Electrician. In certain anti-harassment areas and in single room occupancy buildings, even a small permanent removal needs a permit. Our full guide, do you need a DOB permit?, has a project-by-project table.
Contractors, licenses and insurance
- General contractor. DCWP requires a Home Improvement Contractor license for construction, repair or remodeling work on any residential building in NYC. DOB also advises a written contract that includes the contractor’s company name, address and license numbers.
- Plumber and electrician. DOB says ordinary plumbing work, including allowed gas piping work, must be done by a Licensed Master Plumber, and electrical installation or modification needs an electrical permit and a Licensed Master Electrician.
- Check licenses. DOB points owners to DCWP’s Instant License Check to confirm a home improvement contractor’s license, and its Find Licensed Professionals page explains how to look up DOB-licensed trades.
- Certificates of insurance. The building will want certificates from every contractor naming the co-op or condo, and often the managing agent, as additional insureds. Get the exact wording from the agent; see certificates of insurance in NYC buildings.
- Your own policy. Tell your insurer about the project. Your unit policy should cover your improvements once they are done, and your liability if work damages a neighbor. See homeowners insurance basics.
Work hours and neighbors
The city’s baseline is that construction outside 7:00 am to 6:00 pm on weekdays, or any time on Saturday or Sunday, needs an After Hours Variance from DOB. Buildings usually set narrower hours of their own, such as later starts and no work on holidays, and limit when you can use the service elevator. Give neighbors notice before demolition, and keep the hallways clean; complaints are the fastest way to lose the board’s goodwill.
Timeline and budget
Build approval time into your plan. Board review, revisions and DOB filing often take longer than the construction itself, and the clock in your alteration agreement may start when you sign. Budget for the building’s fees, the board architect’s review, permit fees and a contingency on top of construction. If your building has a special assessment coming, factor that in too.
Independent re-check 2026-10-12: DOB Do I Need a Permit (no-permit examples, DCWP HIC license, ordinary plumbing by Licensed Master Plumber, Instant License Check). 1 RCNY 101-14 PDF Table 2 III.2 re-read: Group R permanent removal exempt up to lesser of 50% of wall surface or 45 sq ft; exceptions for Special Hudson Yards, Garment Center P-2, Clinton, West Chelsea, Greenpoint-Williamsburg anti-harassment areas, and SRO dwellings. DOB Working on Your Project: RDP rule, only RDP submits construction documents, asbestos investigation, licensed GC, written contract with license numbers, inspections and final sign-off. DOB Obtaining a Permit: most permits via DOB NOW: Build, PE/RA files plans. After Hours Variance: before 7:00 am, after 6:00 pm, Saturday or Sunday. DOB electrical owner requirements: permit plus Licensed Master Electrician (source added). Electrical FAQ: owner needs NYC.ID to be added as stakeholder (claim that the owner must sign the original filing removed as unverified). DCWP HIC license scope verified. Removed unverified "Know Your Construction Professional" directory claim. Alteration agreement terms, wet-over-dry, deposits and building hours are described as common building rules that vary; no amounts asserted.
Sources
- Do I Need a Permit? · NYC Department of Buildings (accessed October 12, 2026)
- 1 RCNY §101-14: Categories of work that may or may not require a permit · NYC Department of Buildings (accessed October 12, 2026)
- Working on Your Project · NYC Department of Buildings (accessed October 12, 2026)
- Obtaining a Permit · NYC Department of Buildings (accessed October 12, 2026)
- DOB NOW: Build Electrical Filings FAQs · NYC Department of Buildings (accessed October 12, 2026)
- After Hours Variances · NYC Department of Buildings (accessed October 12, 2026)
- Home Improvement Contractor License Application Checklist · NYC Department of Consumer and Worker Protection (accessed October 12, 2026)
- Project Requirements for Owner: Electrical Systems · NYC Department of Buildings (accessed October 12, 2026)
- Find Licensed Professionals · NYC Department of Buildings (accessed October 12, 2026)
General information, not legal, tax or financial advice. Rules change; confirm with the agency or a professional before you act.