Sub-cycle A · Cycle 10
File by February 21, 2027

Your filing window is open now. The report must be filed within 60 days of the inspector's final inspection date.

Block number ends in4 → sub-cycle A
Filing windowFebruary 21, 2025 – February 21, 2027
Failure to file$5,000 per year
Late filingplus $1,000 per month
Safe: no repairs are needed now. The next report is due in your sub-cycle window.
Sub-cycle (block ends in)Cycle 10 windowCycle 11 window
A (4, 5, 6, 9)2025–20272030–2032
B (0, 7, 8)2026–20282031–2033
C (1, 2, 3)2027–20292032–2034

Windows run February 21 to February 21. Source: 1 RCNY §103-04 and DOB's Cycle 10 service notice (Feb 24, 2025).

How FISP filing windows are assigned

The Facade Inspection and Safety Program (FISP), often still called Local Law 11, requires buildings taller than six stories to have a qualified exterior wall inspector (QEWI) examine the facade and file a report once every five-year cycle. To spread the work out, DOB staggers the deadline by the last digit of the tax block number. Each sub-cycle gets a two-year window that opens and closes on February 21.

Cycle 10 filing windows
Block number ends inSub-cycleFiling window
4, 5, 6, 9AFeb 21, 2025 – Feb 21, 2027
0, 7, 8BFeb 21, 2026 – Feb 21, 2028
1, 2, 3CFeb 21, 2027 – Feb 21, 2029
Source: NYC DOB, FISP Cycle 10 service notice (Feb 24, 2025)

Cycles repeat every five years, so Cycle 11 windows open in 2030, 2031 and 2032 on the same pattern. The block number is part of the property's BBL, which you can find on its Roofy building page or in ACRIS.

Worked example

A 12-story co-op sits on block 1234. The last digit is 4, so it is in sub-cycle A. Its Cycle 10 report must be filed between February 21, 2025 and February 21, 2027. As of October 2026 the window is open, with about four months left. The report must be filed within 60 days of the inspector's final inspection, so the final inspection should be finished by about December 23, 2026 at the latest.

If the board misses the deadline and files on August 21, 2027, six months late, the rule sets a $5,000 failure-to-file penalty for the year after the window closed plus $1,000 for each of the six months: about $11,000 in total.

What your last status means

  • Safe: no repairs needed now and nothing expected to become unsafe in the next five years.
  • SWARMP: safe today, but repairs are needed within the inspector's time frame. A condition can't be reported SWARMP two cycles in a row. If it is still there at the next inspection, it must be reported unsafe and the owner faces a $2,000 penalty.
  • Unsafe: protect the public right away with a sidewalk shed, fence or netting, and correct the conditions within 90 days of filing. DOB may grant up to 90 more days with a contract and schedule, but not for financial reasons. The inspector re-inspects within two weeks of the repairs and files an amended report.
  • No Report Filed: starting in Cycle 10, an owner with this status may file early, before the building's window, after paying all civil penalties.
Penalty for not correcting an unsafe condition
YearBasePlus, per linear foot of shed
1$1,000/month—
2$1,000/month$10/month
3$1,000/month$20/month
4$1,000/month$30/month
5$1,000/month$40/month
Source: 1 RCNY §103-04(d)(3)

What to do next

Read FISP facade inspections explained and what owners pay for in Local Law 11. Check your gas piping year with the LL152 due date checker, and track every other filing in the landlord compliance calendar.

Common questions

What are the FISP Cycle 10 filing windows?

Cycle 10 began February 21, 2025. Sub-cycle A (block number ending in 4, 5, 6 or 9) files between February 21, 2025 and February 21, 2027. Sub-cycle B (0, 7 or 8) files February 21, 2026 to February 21, 2028. Sub-cycle C (1, 2 or 3) files February 21, 2027 to February 21, 2029.

Which buildings need a FISP inspection?

Buildings with exterior walls greater than six stories, whatever the certificate of occupancy says. A six-story building with a cellar that is more than half above the adjacent ground on any wall is also covered.

What are the penalties for a late FISP report?

Under 1 RCNY §103-04, failing to file costs $5,000 per year after the window closes, plus $1,000 per month late until an acceptable report is filed. Failing to fix an unsafe condition adds $1,000 per month, plus a per-foot charge for the sidewalk shed from the second year.

What does SWARMP mean?

Safe with a repair and maintenance program: the facade is safe now but needs repairs within the next five years (and not sooner than one year) to keep it from becoming unsafe. The same condition cannot be reported as SWARMP two cycles in a row; if it is not fixed it must be reported unsafe, and the owner faces a $2,000 penalty.

How fast must unsafe facade conditions be fixed?

The owner must immediately protect the public, for example with a sidewalk shed, and correct unsafe conditions within 90 days of filing the report. DOB may grant an extension of up to 90 days with a contract and schedule; financial reasons are not accepted.

Fact-checked October 12, 2026

Re-verified 2026-10-12: block-digit mapping and Feb 21 two-year windows from 1 RCNY 103-04(c)(4)(v); Cycle 10 dates (10A 2025-2027, 10B 2026-2028, 10C 2027-2029) and NRF early filing via sub-cycle override from DOB service notice of Feb 24, 2025. >6 stories and cellar rule (c)(4)(i); 60-day filing (viii); new-building and contiguous-lot options (vi)-(vii); unsafe 90-day repair, 90-day extension (no financial reasons), two-week re-inspection (c)(5); SWARMP definition and no consecutive SWARMP (c)(6); penalties $5,000/yr, $1,000/mo late, unsafe $1,000/mo plus $10-$40/lf/mo shed in years 2-5, $2,000 SWARMP (d). Worked examples recomputed (Dec 23, 2026 latest inspection; $11,000 for 6 months late). Cycle 11 windows projected from the rule's years-ending-in pattern.

Sources

  1. 1 RCNY §103-04 Periodic Inspection of Exterior Walls and Appurtenances of Buildings · NYC Department of Buildings (accessed October 12, 2026)
  2. Service Notice: Façades Inspection and Safety Program (FISP) Cycle 10 (February 24, 2025) · NYC Department of Buildings (accessed October 12, 2026)

General information, not legal, tax or financial advice. Rules change; confirm with the agency or a professional before you act.