133 Beach 120 Street
Queens, NY 11694BBL 4-16230-0039Map
Owner of record: 133 Beach Apt Corp
133 Beach 120 Street is an elevator apartment building built in 1959 in Queens, 11694. It has 43 residential units across 6 floors. The owner of record is 133 Beach Apt Corp. HPD has recorded 59 housing violations here, most recently on October 19, 2026. 14 of the 50 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2019.
- HPD violations
- 59
- DOB violations
- 28
- ECB violations
- 35
- HPD complaints
- 45
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 59
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 4th story
Oct 19, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at door at compactor closet, 4th story
Oct 19, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at compactor closet, 6th story
Mar 28, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at door at compactor closet, 6th story
Mar 28, 2026
Closed — Violation dismissed - BHazardous
Properly secure the loose handrail at south at public hall stairs, 6th story
Mar 28, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system . at basement
Oct 29, 2025
Open — Nov certified late - CImmediately hazardous
Properly repair or replace the broken or defective lock and handle assembly at building vestibule door at basement
Oct 29, 2025
Open — Nov certified late - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 6th story
Sep 9, 2024
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and east wall at public hall, 6th story
Sep 9, 2024
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing kick down door stopper installed at fire door leading to boiler room at basement at public hall
Sep 9, 2024
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Remove device preventing door from being self-closing hook and eye installed at street entrance door to building
Sep 9, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kickdown door stopper installed at door vestibule to public hall at basement
Sep 9, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and east wall at public hall, 6th story
Sep 9, 2024
Open — Nov certified late - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door to laundry room at basement at public hall
Sep 9, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door near fire stair exit door at basement at public hall
Sep 9, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door at public hall, 6th story
Sep 9, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 29, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 24, 2018
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. at public hall, 6th story
Jan 19, 2018
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak ceiling. at public hall, 6th story
Jan 19, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2015
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling. in the kitchen located at apt 5b, 5th story, 1st apartment from north at east
Jun 29, 2015 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling. in the 1st bedroom from north at east located at apt 5b, 5th story, 1st apartment from north at east
Jun 29, 2015 · Apt 5B
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing. at lobby
Jun 29, 2015
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at lobby
Jun 29, 2015
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 27, 2015
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing fascis at 2nd story balcony east front stack at fire escape
May 7, 2007
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories at east front stack at fire escape
May 7, 2007
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint fire escape east stack all story at front areaway
Apr 30, 2007
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the entire apartment located at apt 2f, 2nd story, 3rd apartment from east at south
Sep 19, 2006 · Apt 2F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... ceiling in the 1st room from north located at apt 2f, 2nd story, 3rd apartment from east at south
Sep 19, 2006 · Apt 2F
Closed — Violation closed - ANon-hazardous
Refit upper and lower sash window in the 2nd room from north at west located at apt 2f, 2nd story, 3rd apartment from east at south
Sep 19, 2006 · Apt 2F
Closed — Violation closed - ANon-hazardous
Refit lower sash window in the 1st room from north located at apt 2f, 2nd story, 3rd apartment from east at south
Sep 19, 2006 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood flooring 12 sq ft near southwall in the 1st room from north located at apt 2f, 2nd story, 3rd apartment from east at south
Sep 19, 2006 · Apt 2F
Closed — Violation closed - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing batten 3rd story balcony 2nd fire escape from west at south side of building
Sep 19, 2006
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies fire escapes throughout
Sep 19, 2006
Closed — Violation closed - BHazardous
D26-10.01 adm code abate the nuisance consisting of doors of fireproof vestibule not adjusted so as to prevent opening of one until other is closed cellar public hall to service area.
Dec 13, 1990
Open — Not complied with - BHazardous
D26-10.01 adm code abate the nuisance consisting of doors of east & west fireproof vestibule not adjusted to prevent opening one until the other is closed cellar.
Dec 13, 1990
Open — Not complied with - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint fire escape all stacks all stys all parts.
Dec 13, 1990
Closed — Violation closed - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing bottom front rail southwest stack 2 sty balcony.
Dec 13, 1990
Closed — Violation closed - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing bottom front rail east stack 2 sty balcony.
Dec 13, 1990
Closed — Violation closed - ANon-hazardous
D26-22.03 adm code post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Dec 10, 1990
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code abate the nuisance consisting of concealed ceiling and wall leaks 3rd sty apt 3d south east room. , section '' ''
Oct 21, 1988 · Apt 3D
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall 3rd sty apt 3d south east room and bathroom. , section '' ''
Oct 21, 1988 · Apt 3D
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color walls 5 sty apt 5b southeast room. , section '' ''
Oct 21, 1988 · Apt 5B
Closed — Violation closed - ANon-hazardous
D26-20.05 adm code provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain door guard 3 sty apt 3d. located at apt 3d
Oct 21, 1988 · Apt 3D
Open — Not complied with - ANon-hazardous
D26-10.01 adm code properly repair the broken or defective 0osaddle of entrance door 3 sty apt 3f. , section '' ''
Oct 21, 1988 · Apt 3F
Closed — Violation closed
DOB building violations · 28
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2016
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
May 6, 2015
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
May 6, 2015
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 12, 2014
Dob violation - dismissed
Show 18 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 25, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 16, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 6, 2010
Dob violation - resolved - Construction other optional
C-construction other optional
Aug 20, 2010
Dob violation - active - Construction other optional
C-construction other optional
Nov 3, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 11, 2007
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 31, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 18, 1991
Vp-violation unserved ecb-active - Elevator elevatorrequired
E-elevator elevatorrequired
May 14, 1990
Dob violation - resolved
ECB violations · 35
- Class - 2
Failure to maintain exterior building facade and appurtenances. note:at the time of inspection observed at roof level crack brick in the chimney,also crack stone at the top of the chimney. remedy:maintain exter
Feb 2, 2023
Resolve - Class - 2
Bc3314.4.8 failure to maintain suspended scaffold.note:at the time of my inspection of a 6 stories alt jobsite i observed suspended scaffoldset up at exp.#2 missing netting.the missing netting constitute a haza
Sep 24, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specification.note:at the time of my inspection of a 6 story facade repairing work.i observed displaced netting by the sns at exp.#1 missing/displaced netting constitute
Sep 24, 2021 · Penalty $2,400
Resolve - Class - 2
Removal of safety measures such as sidewalk shed's, netting, etc, w/out department's approval. note: @ time of (trg) insp bldg facade was still designated as unasfe, the amended facade report (trg) recieved on
Jan 31, 2017 · Penalty $400
Resolve - Class - 2
Failure to file acceptable amended inidicating correction of unsafe conditions described in initial local law 11/98 report.rem:file acceptable amended report.
Nov 7, 2016 · Penalty $800
Resolve - Class - 2
Failure to file an acceptable amended cycle 7 report to this dept indicating correction of unsafe conditions described in initial local law fisp report. remedy: file an amended report following remedial repair
May 29, 2015 · Penalty $800
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Oct 21, 2014 · Penalty $4,000
Resolve - Class - 1
Failure to take required action to secure public safety unsafe facade.noted:no safety measures are erected @ this bldg and the facade is designated as unsafe as per the qewi signed dated of 1/30/07.rmdy:immedia
Dec 11, 2013 · Penalty $6,000
Resolve - Class - 2
Fail to maintain facade & appurtenances.noted:at front entrance parts of the outer width of brick have been removed and left open. rem: immediately make safe.make repairs in safe & legal manner.
Oct 16, 2012 · Penalty $500
Resolve - Class - 1
Fail to take required measures to protect public fr unsafe conditions.noted:an unsafe tech facade report was submitted to the dept and no safety measures are erected.
Oct 16, 2012 · Penalty $2,400
Resolve
Show 25 more ↓
- Class - 2
Sec. 28-302.5. failure to erect safety measures to protect the public from hazardous conditions. noted: a fisp 3 notification of unsafe conditions form was submitted to "the dept" on and no safety measures have
Aug 8, 2012 · Penalty $4,000
Resolve - Class - 2
28-302.5)local law report (cycle 6)filed as "unsafe" by architect/engineer.no amended report was filed."unsafe conditions"require safety provision for the public as per 27-ng(d) & 1rcny32-3(b)(5)(i).no sidewalk
Aug 15, 2011 · Penalty $800
Resolve - Class - 2
Fail to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law11/98 report. remedy: file an amended report following remedial repair
Jun 11, 2010 · Penalty $800
Resolve - Class - 2
97v01 73i10 41t07 52l11 97v-adjust car leveling 73i-grand at bad spots on car rails 52l-broken cwt side spring shackle replace it
May 26, 2010 · Penalty $250
Resolve - Class - 1
Work w/o a permit. noted: supported scaffold over 40' high installed on fire escape at exp 1 w/no permit. remedy: obtain permit.
Apr 2, 2010
Resolve - Class - 2
Work does not conform to approved plans. observed at exp 4 a 60'+ supported scaffold on top of sidewalk shed. & on approved plan by dob: 1)supported scaffold located at exp 1 (different location) 2) supported s
Jan 22, 2010 · Penalty $2,500
Resolve - Class - 2
Fail to provide approved/accepted plans at job site at time of inspection noted;plans for a sidewalk shed with approx 70' of supported scaffold installed on top w/o approved plans for review.creating a hazardou
Dec 30, 2009 · Penalty $500
Resolve - Class - 1
All supported scaffolds shall be inspected daily before each use by a competent person designated by the trade using the scaffold'' due to history on non compliance,noted:daily insp logs for the supported scaff
Dec 30, 2009 · Penalty $6,000
Resolve - Class - 1
Supported scaffold does not meet building code specifications in that-vertical netting is missing torn not secured to the supported scaffoldand flapping in the wind creating a hazardous condition.due to history
Dec 30, 2009 · Penalty $1,600
Resolve - Class - 2
Fail to provide approved/accepted plans at job site at time of inspection.noted:plans for supported scaffold was not available for review.supported scaffold approx 70' high installed on top of a sidewalk shed
Dec 30, 2009
Resolve - Class - 1
Use of supported scaffold w/o a scaffold user certficate noted;worker working off of supported scaffold w/o a scaffold user certficate a time of inspection.stop all work onsupported scaffold/do not remove equip
Dec 30, 2009 · Penalty $1,600
Resolve - Class - 2
Sidewalk shed does not meet code specifications. noted: shed at exp 1has no protection for pedestrian walkway and safety netting is all torn. exp 4 shed columns have no protection against vehicular
Nov 4, 2009 · Penalty $2,400
Resolve - Class - 2
Sec 28.201.1 misc viol: unlawful acts, fail to comply w/comm order to file a certificate of correction w/dob. for ecb violations # 34539098hissued 9/1/2006. for which no compliance has been recorded. remedy: co
Jul 20, 2009 · Penalty $4,000
Resolve - Class - 2
Fail to comply w/commissioner order to file cert of correction w/dob for nov # 34753852h issued 12.11.08. for which no compliance has been recorded. remedy: file certificate of correction.
Jul 20, 2009 · Penalty $4,000
Resolve - Class - 2
Failure to provide approved plans at job site at time of insp observedsupported scaffold stair tower erected under permit #41018009h at exp#2 workers didn't prove approved plans rem: provide plans
Dec 11, 2008 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg walls or appurt. noted:the exterior metal fire escapes facing ocean provienade & serving apts on lines d,e,f are in dispair and dangerous conditions some railing is missing steel struct
Oct 14, 2008 · Penalty $5,000
Resolve - Class - 2
Work does not conform to approved cd-5 sr08/1657 (7/25/08) & cd-5 sr07/2218 (10/3/07) observed a)outrigger beam overhangs. +/- 3ft & +/- 4ftapproved 2.5ft. b)using different counter weights on outrigger beams.
Aug 13, 2008
Resolve - Class - 2
Failed to notify dob prior the use or installation of outrigger beams in connection w/ suspended scaffolds. observed notification confirmation #4005363 expired on 04/13/08. remedy: notify the dob.
Jul 2, 2008 · Penalty $800
Resolve - Non-hazardous
Work w/o a permit.work noted:at front,north & south sides replacement of lintels & brick work,including pointing,evident in various locations.remedy:obtain a permit.
Sep 1, 2006 · Penalty $500
Resolve - Non-hazardous
Failure to maintain building:at east elevation fire escape in state ofdisrepair with rusted & rotted steel support members at various locations throughout. remedy:repair defect.
Jun 28, 2006 · Penalty $350
Resolve - Non-hazardous
55,y,13 55,b,10 59,x,10 85,bb,05 55y main machine leaking seal 55b elevator would not move capacity 59x repair motor room lighting 85 bb 5 year test expired
Jan 28, 2004 · Penalty $180
Resolve - Non-hazardous
75u,39h,46k,36l,36t, 36-replace lock on motor room door.
Sep 9, 1998 · Penalty $180
Resolve - Non-hazardous
35p,08v,74b,74-ele bx shaft (cover)
Mar 20, 1993
Resolve - Non-hazardous
05l,09m,35p, 05.door timer. 09 2 gibs. 35.provide access also repair motor room stairs.
Jul 27, 1992 · Penalty $200
Resolve - Non-hazardous
22d,57o,
Jan 18, 1991 · Penalty $150
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 17, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2025 · Apt BLDG
Close
Show 35 more ↓
- Heat/hot water
Entire building
Oct 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt 6E
Close - Heat/hot water
Entire building
Nov 5, 2024 · Apt BLDG
Close - Water leak
Heavy flow
Sep 6, 2024 · Apt 6FL
Close - Heat/hot water
Entire building
Jan 19, 2022 · Apt 5D
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2021 · Apt 2A
Close - Heat/hot water
Entire building
Feb 25, 2021 · Apt 5E
Close - Heat/hot water
Entire building
Apr 13, 2018 · Apt 5D
Close - Heat/hot water
Entire building
Jan 15, 2018 · Apt 6B
Close - Heat/hot water
Entire building
Sep 27, 2014 · Apt 5K
Close - Nonconst
Rubbish
Jul 20, 2010 · Apt 1G
Close - Nonconst
Vermin
Jul 20, 2010 · Apt 1G
Close - General
Fire-escape
Jan 4, 2008 · Apt BLDG
Close - Plumbing
Water-leaks
Apr 25, 2007 · Apt 1D
Close - Paint/plaster
Ceiling
Apr 25, 2007 · Apt 1D
Close - Plumbing
Water-leaks
Apr 25, 2007 · Apt 1D
Close - General
Mold
Apr 25, 2007 · Apt 1D
Close - Paint/plaster
Ceiling
Apr 25, 2007 · Apt 1D
Close - General
Mold
Apr 25, 2007 · Apt 1D
Close - Paint/plaster
Wall
Dec 19, 2006 · Apt 3A
Close - Paint/plaster
Ceiling
Dec 19, 2006 · Apt 3A
Close - Paint/plaster
Wall
Dec 19, 2006 · Apt 3A
Close - General
Windows
Dec 19, 2006 · Apt 3A
Close - General
Windows
Dec 19, 2006 · Apt 3A
Close - Plumbing
Bathtub/shower
Sep 18, 2006 · Apt 2F
Close - Paint/plaster
Ceiling
Sep 18, 2006 · Apt 2F
Close - General
Mold
Sep 18, 2006 · Apt 2F
Close - General
Floor
Sep 18, 2006 · Apt 2F
Close - Paint/plaster
Ceiling
Sep 18, 2006 · Apt 2F
Close - General
Windows
Sep 18, 2006 · Apt 2F
Close - General
Windows
Sep 18, 2006 · Apt 2F
Close - Plumbing
Basin/sink
Jun 11, 2003 · Apt 5D
Close - Plumbing
Basin/sink
Jun 11, 2003 · Apt 5D
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Sep 9, 2026 | $268,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1959
- Floors
- 6
- Residential units
- 43
- Building area
- 40,500 ft²
- Lot area
- 8,500 ft²
- Zoning
- R7A
- Community board
- 414
- Council district
- 32
- Block / lot
- 16230 / 39
- Assessed value
- $1,913,400
- Landmark / historic district
- No
HPD registration #419193, last renewed Aug 22, 2025.
Questions about 133 Beach 120 Street
Who owns 133 Beach 120 Street?
The owner of record in NYC Department of City Planning PLUTO data is 133 Beach Apt Corp.
Does 133 Beach 120 Street have violations?
Yes. NYC HPD has recorded 59 housing violations at this property.
Is 133 Beach 120 Street rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2019 (about 2% of its 43 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 133 Beach 120 Street built?
City records list 1959 as the year it was built.
How many apartments are in 133 Beach 120 Street?
It has 43 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.