roofy

130 Beach 121 Street

Queens, NY 11694BBL 4-16230-0044Map

Owner of record: Belle Beacon Housing Corp

130 Beach 121 Street is an elevator apartment building built in 1963 in Queens, 11694. It has 48 residential units across 6 floors. The owner of record is Belle Beacon Housing Corp. HPD has recorded 58 housing violations here, most recently on May 7, 2026. 8 of the 50 most recent violations are still open.

HPD violations
58
DOB violations
26
ECB violations
25
HPD complaints
22

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 58

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 7, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north located at apt 5g, 5th story, 1st apartment from south at west

    Jan 31, 2024 · Apt 5G

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective radiator cover in the kitchen located at apt 5g, 5th story, 1st apartment from south at west

    Dec 20, 2023 · Apt 5G

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from north located at apt 5g, 5th story, 1st apartment from south at west

    Dec 20, 2023 · Apt 5G

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north located at apt 5g, 5th story, 1st apartment from south at west

    Dec 20, 2023 · Apt 5G

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5g, 5th story, 1st apartment from south at west

    May 11, 2023 · Apt 5G

    Open — Nov sent out
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 5g, 5th story, 1st apartment from south at west

    May 11, 2023 · Apt 5G

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 29, 2023

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective caulking around exterior door frame north wall in the terrace located at apt 5g, 5th story, 1st apartment from south at west

    Mar 2, 2023 · Apt 5G

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective caulking around exterior window frame east wall in the terrace located at apt 5g, 5th story, 1st apartment from south at west

    Mar 2, 2023 · Apt 5G

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective eroded exterior south, east and north brick walls. in the terrace located at apt 5g, 5th story, 1st apartment from south at west

    Mar 2, 2023 · Apt 5G

    Closed — Violation closed
  • B

    Properly repair the broken or defective balkony door frame ar south wall. in the 1st room from north located at apt 5g, 5th story, 1st apartment from south at west

    Feb 9, 2023 · Apt 5G

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper door at compactor closet, 6th story

    Nov 18, 2022

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1a, 1st story, 2nd apartment from west at north

    Apr 14, 2022 · Apt 1A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2021

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing.

    Aug 18, 1999

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at 1 sty pub hall.

    Aug 18, 1999

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system boiler room door locked at cellar.

    Aug 18, 1999

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at or near mailboxes 1 sty pub hall.

    Aug 18, 1999

    Closed — Violation closed
  • B

    Replace or repair the self-closing the doors that is missing or defective hopper door at compactor room 6 sty pub hall.

    Aug 18, 1999

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling west room 6 sty apt 6b. , section '' ''

    Jan 1, 1997 · Apt 6B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling south room 6 sty apt 6b. , section '' ''

    Jan 1, 1997 · Apt 6B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceilings 6 sty apt 6b thruout. , section '' ''

    Dec 20, 1996 · Apt 6B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling 6 sty apt 6b center room. , section '' ''

    Dec 20, 1996 · Apt 6B

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over 6 sty apt 6b center room. , section '' ''

    Dec 20, 1996 · Apt 6B

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of offensive odors emanating from 1 sty apt 1d into pub hall 1 sty. , section '' ''

    Jul 22, 1996 · Apt 1D

    Closed — Violation closed
  • B

    Remove all obstructions and repair all defects in wasteline of bathroom bathtub at 4 sty apt 4b. , section '' ''

    Jul 27, 1993 · Apt 4B

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of concealed water leak from walls and ceiling in bathroom of 4 sty apt 4b. , section '' ''

    Jul 27, 1993 · Apt 4B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings thruout 4 sty apt 4b. , section '' ''

    Jul 27, 1993 · Apt 4B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling private hall and inside closet at private hall 4 sty northwest apt 4b. , section '' ''

    May 6, 1992 · Apt 4B

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of mildew ceiling inside closet at private hall 4 sty northwest apt 4b. , section '' ''

    May 6, 1992 · Apt 4B

    Closed — Violation closed
  • C

    Remove all obstructions and repair all defects in waste line bathtub bathroom 4 sty northwest apt 4b er1. , section '' ''

    May 6, 1992 · Apt 4B

    Closed — Violation closed
  • C

    Remove the illegal fastening double cylinder lock installed entrance door 4 sty northwest apt 4b. , section '' ''

    May 6, 1992 · Apt 4B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling bathroom 4 sty northwest apt 4b. , section '' ''

    May 6, 1992 · Apt 4B

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over 6 sty apt 6b. , section '' ''

    Aug 6, 1991 · Apt 6B

    Closed — Violation closed
  • B

    Properly repair the broken or defective mortise lock on entrance door to 6 sty apt 6b. , section '' ''

    Aug 6, 1991 · Apt 6B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceilings thruout 6 sty apt 6b. , section '' ''

    Aug 6, 1991 · Apt 6B

    Closed — Violation closed
  • B

    Properly repair the broken or defective mortise lock on entrance door to 6 sty apt 6b. , section '' ''

    Apr 10, 1991 · Apt 6B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceilings throughout 6 sty apt 6b. , section '' ''

    Apr 10, 1991 · Apt 6B

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in center room of 6 sty apt 6b er1. , section '' ''

    Apr 10, 1991 · Apt 6B

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak over center room of 6 sty apt 6b er1. , section '' ''

    Apr 10, 1991 · Apt 6B

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall & window reveal 5 sty apt 5d east & center room. , section '' ''

    Jun 19, 1990 · Apt 5D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department ceiling 5 sty apt 5d east room. , section '' ''

    Jun 19, 1990 · Apt 5D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling & walls 6 sty apt 6d south room. , section '' ''

    Jul 27, 1989 · Apt 6D

    Open — Not complied with
  • A

    Properly repair the broken or defective window sashes 2 sty apt 1c all windows lower sashes r106. , section '' ''

    Jan 30, 1989 · Apt 1C

    Closed — Violation closed
  • A

    Refit door to terrace 2 sty apt 1c. , section '' ''

    Jan 30, 1989 · Apt 1C

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of double cylinder lock 2 sty apt 1c entrance. , section '' ''

    Jan 30, 1989 · Apt 1C

    Closed — Violation closed
  • A

    D26-10.01 adm code properly repair the broken or defective window sashes 2 sty apt 1c all windows lower sashes. , section '' ''

    Jan 30, 1989 · Apt 1C

    Closed — Violation closed
  • C

    Remove all obstructions and repair all defects in wasteline 1 sty apt 1a bathtub er1. , section '' ''

    May 24, 1988 · Apt 1A

    Closed — Violation closed
  • A

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet 1 sty apt 1a bathroom. , section '' ''

    May 24, 1988 · Apt 1A

    Closed — Violation closed

DOB building violations · 26

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 2, 2022

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 19, 2019

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 17, 2019

    Dob violation - dismissed
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 4, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 19, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 9, 2016

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 2, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 25, 2013

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
Show 16 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 16, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 6, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 22, 2010

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 7, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 29, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 21, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 17, 2003

    Dob violation - resolved
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Aug 8, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 24, 1990

    Dob violation - resolved

ECB violations · 25

  • Class - 2

    Work without a permit.noted:at time of inspection observed at exposure4 the replacement of bricks approx.20'x2' on parapet wall.the work is being done by 2 workers standing on a balcony concrete roof with an ex

    Jan 31, 2024 · Penalty $1,280

    Resolve
  • Class - 2

    No sws design drawings(dd) i observed 1 worker on top of sidewalk shed(sws) at exp1 working on brick facade. sws was loaded with bricks and materials. upon request to view the sws dd, installation inspection re

    May 19, 2022 · Penalty $625

    Resolve
  • Class - 1

    Unsafe access-ladder base not stable-no guardrails i observed 1 worker on top of sidewalk shed(sws) at exp1. upon accessing the extension ladder near exp4, ladder base on top of a brick(no mudsill or other safe

    May 19, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    I observed no property address on the sws panel.

    May 19, 2022 · Penalty $625

    Resolve
  • Class - 2

    Temporary construction equipment on site. expired permit. at the time of inspection i observed sidewalk shed in place at exp #1 and exp #4 permit for sidewalk shed has been expired on 7/24/19. remedy: renew

    Jul 25, 2019

    Resolve
  • Class - 1

    Unlawfully continued work while on notice of a stop work order. at thetime of inspection i observed supported scaffold was removed from the place. facade work was complete.stop work order exp. on this property

    Jul 25, 2019

    Resolve
  • Class - 2

    Failure to maintain exterior building facade & appurtenance.(1)exp#4 south elevation/facing boat walk)step crack/spalled @ parapet masonry facade in between apt c/o line were observe.rem: maintain exterior

    Jun 19, 2019

    Resolve
  • Class - 1

    Failure to maintain exterior building facade and appurtenances. such as fire escape. note: at the time of inspection observe at exp3 south elevation inoperable drop ladder/damage/broken drop ladder at fire es

    May 9, 2019 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #811854.remedy: submit required technical report

    Oct 15, 2018 · Penalty $625

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.note:at time of inspection i observed sidewalk shed in place which the general contractor on site failed to maintained in a safe condition and used in a m

    Jul 25, 2018 · Penalty $2,430

    Resolve
Show 15 more ↓
  • Class - 2

    Approved documents plans.failed to provide approved plans/documents attime of inspection.note:at time of inspection i observed supported scaffold installed on exposure #4 with no approved plan documents availab

    Jul 25, 2018 · Penalty $530

    Resolve
  • Class - 1

    3314.8.1. partial swo for supported scaffold issued pursuant to 28-207.2 & posted @ premises. unsafe conditions. note: observed stairs side rails are missing. remedy:do not use supported scaffold. comply with c

    Jan 23, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Partial swo for all facade job issued pursuant to 28-207.2 & posted @ premises. maintenance. note: failure to maintain adequate houskeeping per section requirements. observed a large amount of construction debr

    Jan 23, 2017 · Penalty $800

    Resolve
  • Class - 2

    3314.4.8. partial swo for supported scaffold issued pursuant to 28-207.2. & posted @ premises. maintenance. note: observed debris netting isdisconnected from the pipe scaffold frame. failure to maintain scaffol

    Jan 23, 2017 · Penalty $800

    Resolve
  • Class - 2

    Partial swo for supported scaffold issued pursuant to 28-207.2 & posted @ premises. maintenance. pedestrian protection doesn't meet code specs. note: observed sidewalk shed columns are: covered by sand & debris

    Jan 23, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    Partial swo for using sidewalk shed roof pursuant to 28-207.2 & posted@ premises. no guardrail. note: observed sidewalk shed roof been used as a working area. temporary fall protection isn't provided. remedy: d

    Jan 23, 2017 · Penalty $800

    Resolve
  • Class - 2

    Failure to file acceptable amended report indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file acceptable amended report.

    Nov 7, 2016

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Oct 21, 2014 · Penalty $400

    Resolve
  • Class - 3

    02l10,60l11,68b07.car outside communication.not working a173 rule 3.11.1.(68b07)keep up to date maintenance log.

    Aug 24, 2012

    Resolve
  • Non-hazardous

    Failure to maintain exterior bldg window steel lintel on the double mollin window is bowing and rusting out causing an hazardous condition remedy make also safe elect side walk also rsmvs repair damaged steel

    Feb 3, 2004 · Penalty $800

    Resolve
  • Non-hazardous

    73x 35i 73 restore to service call 312 8740 for reinspection 35 motor room walls faling apart

    Sep 9, 1998

    Resolve
  • Non-hazardous

    75#5,54l11,36l11,31q7,73x11,57o2. 5 year test past due (3-92). restoreto service so a full inspection can be made by this department. call (212)312-8740.

    Oct 18, 1997

    Resolve
  • Non-hazardous

    46k.

    Aug 23, 1993 · Penalty $1,000

    Resolve
  • Non-hazardous

    Use of a saining scaffold to point outside of a seven story bldg without a riggers license use of a swinging scaffold without danger signs for protection of the public-obtain proper signs failed to provide cent

    Jun 4, 1992 · Penalty $2,000

    Resolve
  • Non-hazardous

    73#,14m,52l,#(73)perform 5 yr test, properly tag device and file elv3 form #(52)properly wire brake solehold.

    Mar 18, 1992 · Penalty $75

    Resolve

Complaints

  • Plumbing

    Radiator

    Jan 26, 2024 · Apt 5G

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2024 · Apt 2D

    Close
  • Plumbing

    Radiator

    Dec 13, 2023 · Apt 5G

    Close
  • Door/window

    Window frame

    Dec 13, 2023 · Apt 5G

    Close
  • Door/window

    Window frame

    Dec 13, 2023 · Apt 5G

    Close
  • Unsanitary condition

    Mold

    Dec 13, 2023 · Apt 5G

    Close
  • Paint/plaster

    Wall

    Dec 13, 2023 · Apt 5G

    Close
  • Paint/plaster

    Wall

    Dec 13, 2023 · Apt 5G

    Close
  • Heat/hot water

    Entire building

    Dec 12, 2023 · Apt 5G

    Close
  • Door/window

    Window frame

    Feb 22, 2023 · Apt 5G

    Close
Show 12 more ↓
  • Door/window

    Door frame

    Feb 22, 2023 · Apt 5G

    Close
  • Door/window

    Door frame

    Feb 3, 2023 · Apt 5G

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2022 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 9, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 25, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 9, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 9, 2020 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 17, 2018 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Oct 26, 2014 · Apt 112

    Close
  • General

    Mold

    Apr 30, 2009 · Apt 5C

    Close
  • Paint/plaster

    Wall

    Apr 30, 2009 · Apt 5C

    Close

Sales history

DatePriceTypeUnits
Mar 9, 2026$214,000Coops - elevator apartments—

Building details

Building type
Elevator apartment building (D4)
Year built
1963
Floors
6
Residential units
48
Building area
41,120 ft²
Lot area
8,500 ft²
Zoning
R7A
Community board
414
Council district
32
Block / lot
16230 / 44
Assessed value
$1,412,100
Landmark / historic district
No

HPD registration #420383, last renewed Jul 21, 2025.

Questions about 130 Beach 121 Street

Who owns 130 Beach 121 Street?

The owner of record in NYC Department of City Planning PLUTO data is Belle Beacon Housing Corp.

Does 130 Beach 121 Street have violations?

Yes. NYC HPD has recorded 58 housing violations at this property.

Is 130 Beach 121 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 130 Beach 121 Street built?

City records list 1963 as the year it was built.

How many apartments are in 130 Beach 121 Street?

It has 48 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.