roofy

13-43 Beach Channel Drive

Queens, NY 11691BBL 4-15659-0032Map

Owner of record: Tulloch, Kristine A

13-43 Beach Channel Drive is a two-family home built in 2005 in Queens, 11691. It has 2 residential units across 2 floors. The owner of record is Tulloch, Kristine A. HPD has recorded 85 housing violations here, most recently on October 7, 2026. 48 of the 50 most recent violations are still open.

HPD violations
85
DOB violations
4
ECB violations
22
HPD complaints
93

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 7, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 85

  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard at building front yard

    Oct 7, 2026

    Open — Violation open
  • B

    Properly repair or replace the broken or defective brick and mortar joint at pillar supporting landing at stairs at building front , 1st story

    Oct 7, 2026

    Open — Violation open
  • B

    Properly repair with similar material the broken or defective 7th concrete tread from bottom at stairs leading to apartment 2 at building front , 1st story

    Oct 7, 2026

    Open — Violation open
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Oct 7, 2026 · Apt 2

    Open — Violation open
  • C

    Abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Oct 7, 2026 · Apt 2

    Open — Violation open
  • I

    The premises or apts. have been vacated by the department and cannot be reoccupied until so ordered after proof of compliance for vacate# 261140 at cellar apartment (northwest 1) at cellar (west 1). date posted and mailed: september 01, 2026. effective date: september 02, 2026. at cellar

    Sep 1, 2026

    Open — Info nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Aug 23, 2026 · Apt 1

    Open — Nov sent out
  • B

    Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range at cellar

    Aug 23, 2026

    Open — Nov sent out
  • B

    § 9, 56, 193, 300, 302 m.d. law- above frame building has been converted from a private dwelling to a multiple dwelling and is now occupied and maintained as such contrary to law.restore premises to lawful occupancy

    Aug 23, 2026

    Open — Nov sent out
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections the shower stall at cellar

    Aug 23, 2026

    Open — Nov sent out
Show 40 more ↓
  • B

    § 9, 170, 171, 300, 301, 302 m.d.law-file plans and application and obtain a certificate of occupancy to legalize the conversion from a private dwelling to multiple dwelling use if lawfully feasible or restore to lawful occupancy

    Aug 23, 2026

    Closed — Violation closed
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections water closet, bathtub, shower stall, wash basin and residential sink at cellar

    Aug 23, 2026

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective electrical outlet at east wall in the 2nd bathroom from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective wood base cabinet door at sink in the kitchen located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair and abate unsafe electric wiring condition consisting of loose wires at south wall in the 1st room from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • A

    Replace with new the missing light fixture cover in the 1st bathroom from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective electrical outlet at east wall in the 2nd bathroom from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • A

    Replace with new the missing light fixture cover in the 4th room from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and south wall in the 1st room from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • A

    Repair the leaky and/or defective faucets at wash basin in the 2nd bathroom from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Replace the broken or defective wash basin in the 1st bathroom from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl linoleum flooring in the 4th room from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood door frame in the 2nd bathroom from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • A

    Properly secure the loose door hinges in the 3rd room from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective concrete landing at stairs leading to 1st story , 1st story

    Aug 16, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Replace the broken or defective wash basin in the 1st bathroom from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl linoleum flooring in the 4th room from east at south located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling next to ventilation cover in the 2nd bathroom from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Notice of issuance sent to tenant
  • B

    Replace with new the missing 2 metal baulister at intermediate landing at apartment 1 entrance , 1st story

    Aug 16, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at south wall in the 2nd room from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the missing wood door at entrance in the 2nd room from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • A

    Refit east 2 window in the 1st room from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective connection at wasteline at wash basin in the 2nd bathroom from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and south wall in the 1st room from east located at apt 1, 1st story, 2nd apartment from south at west

    Aug 16, 2026 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the missing 2 metal baulisters at intermediate landing at apartment 1 entrance , 1st story

    Aug 16, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in uniform color at ceiling and all walls in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west

    Apr 21, 2026 · Apt 2

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west

    Apr 21, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Apr 21, 2026 · Apt 2

    Open — Nov sent out
  • B

    Repair the broken or defective connection at wasteline at wash basin in the 1st bathroom from east located at apt 2, 2nd story, 1st apartment from south at west

    Apr 21, 2026 · Apt 2

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in wasteline at bathtub in the 2nd bathroom from east located at apt 2, 2nd story, 1st apartment from south at west

    Apr 21, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at north wall and east wall in the 1st bathroom from east located at apt 2, 2nd story, 1st apartment from south at west

    Apr 21, 2026 · Apt 2

    Open — Nov sent out
  • A

    Refit door in the entrance located at apt 2, 2nd story, 1st apartment from south at west

    Apr 21, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood base cabinet in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Apr 21, 2026 · Apt 2

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the 1st bathroom from east located at apt 2, 2nd story, 1st apartment from south at west

    Apr 21, 2026 · Apt 2

    Open — Nov sent out

DOB building violations · 4

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 7, 2011

    Dob violation - active
  • Construction other optional

    C-construction other optional

    Aug 24, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jun 29, 2011

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 6, 2011

    Dob violation - active

ECB violations · 22

  • Class - 2

    Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #34985395y issued on 8/1/12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Apr 25, 2015 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #34985395y issued on 8/1/12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Mar 10, 2015 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to comply w/ the comm's order to file a cert of correction w/ the dept of bldg for notice of violation #34985395y issued on 08/01/12pursuant to 28-204.4 & 1rcny 102-01.rem:file a cert of correction.

    Jan 24, 2015 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34985395y issued on 8/1/12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Dec 5, 2014 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to comply w/ the comm's order to file a cert of correction w/ the dept of bldg for notice of violation #34985395y issued on 08/01/12pursuant to 28-204.4 & 1rcny 102-01.rem:file a cert of correction.

    Oct 31, 2014 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34985395y issued on 8/1/12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Sep 20, 2014 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to comply w/the comm'nrs oder to file a cert.of correction w/the dob for nov 34985395y issued on 08/1/12 pursuant to 28-204.4 & 1rcny 102-01.remedy:file a certificate of correction

    Jul 2, 2014 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to comply with the commissioners order to file a certificate of correction with the dept of buildings for nov#34985395y issued on 08/01/12 pursuant to 28-204.4 & 1rcny 102-01 remedy:file a certificate o

    May 17, 2014 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to comply to the commissioners order to file a certificate of correction with the dob for notice of violation #34985395y issued 08/01/12 pursuant to 28-204.4 & 1rcny 102-01.remedy:file a certificate of

    Mar 19, 2014 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a certificate of correction w/dob for nov #34985395y issued on 8/1/12 pursuant to 28- 204.4 & 1rcny 102-01. rmdy: file a certificate of correction.

    Jan 16, 2014 · Penalty $4,000

    Resolve
Show 12 more ↓
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34985395y issued on 8/1/12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Sep 12, 2013 · Penalty $4,000

    Resolve
  • Class - 1

    Failure to comply w/commissioner's vacate order. vacate order issued for entire class 'a' apt at cellar level. cellar level re-oocupied by 2 adults @ time of visit. inadequate ventilation & no secondary egress

    Aug 1, 2012 · Penalty $25,000

    Active
  • Class - 2

    Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34914705m issued on 6/16/11 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.

    Oct 21, 2011 · Penalty $4,000

    Resolve
  • Class - 2

    Residence altered for occupancy as a dwelling for more than the legally approved # of fam.dob record co#402156821f indicate premise to be legally approved for (2)fam.(1st & 2ndflrs.0cellar: accessory,storage re

    Aug 24, 2011 · Penalty $6,000

    Active
  • Class - 1

    27-128-1bc)@ time of inspec removed vacate order stickers has occured which was posted on illegal cellar apt contrary to c of o#402156821,nov#34794660y,34909797m,34894697x.new vacate order in stickers again pos

    Jun 16, 2011 · Penalty $8,000

    Active
  • Class - 2

    Failure to comply w/ the comms order to file a cert of correction w/ the dob resp failed to correct the violating conditions and file a cert of correction pursuant to 28-204.2 for nov#34894697x rem: file cert o

    May 18, 2011 · Penalty $4,000

    Resolve
  • Class - 1

    Violations: violation of closure order. at time of inspection removed of vacate order stickers has occurred which was posted on illegal cellar apt contrary to c of o #402156821 & nov #34794660y. remedy: comply

    Mar 29, 2011 · Penalty $8,000

    Active
  • Class - 1

    Failure to comply w/requirement. (28-201.1. 28-201.2(4)) of admin code. not compliant noted: the vacate order notice which was posted on thecellar door has been removed. remedy: comply w/nov.

    Jan 13, 2011 · Penalty $8,000

    Active
  • Class - 1

    Occupancy contrary to that allowed by the c of o or building dept records. noted: c of o #402156821f(12-11-06) states - "accessory storage,boiler room laundry area" for cellar. at time of inspection observed at

    Nov 13, 2009 · Penalty $12,000

    Active
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments. for alt 2 job #410059788(2-7-08) permit expired (8-10-08). noted: at cellar full height partitions not removed as shown on pl

    Nov 13, 2009 · Penalty $2,500

    Active
  • Hazardous

    Residence altered for occupancy as a dwelling for more than the legally approved number of families. dept of bldg records co #402156821 indicates premises to be legally approved for a 2 family (1st & 2nd floor)

    Sep 15, 2007 · Penalty $7,550

    Active
  • Hazardous

    Work w/o a permit. work noted: at cellar level premises created full height partition for 4 room installed water & waste lines for a 3 pc bathroom (toilet, sink, shower) & residential sink at kitchen. installed

    Sep 15, 2007 · Penalty $800

    Active

Complaints

  • Heat/hot water

    Apartment only

    Oct 7, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 6, 2026 · Apt APT2AN

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2026 · Apt 1FLOOR

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2026 · Apt 1FLOOR

    Close
  • Safety

    Smoke detector

    Aug 10, 2026 · Apt 1FLOOR

    Close
  • Flooring/stairs

    Stairs

    Aug 10, 2026 · Apt 1

    Close
  • Outside building

    Porch/balcony

    Aug 10, 2026 · Apt 1

    Close
  • Electric

    Outlet/switch

    Aug 10, 2026 · Apt 1FLOOR

    Close
  • Electric

    Lighting

    Aug 10, 2026 · Apt 1FLOOR

    Close
  • Paint/plaster

    Wall

    Aug 10, 2026 · Apt 1FLOOR

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Aug 10, 2026 · Apt 1FLOOR

    Close
  • General

    Cabinet

    Aug 10, 2026 · Apt 1FLOOR

    Close
  • Flooring/stairs

    Floor

    Aug 10, 2026 · Apt 1FLOOR

    Close
  • Water leak

    Slow leak

    Aug 10, 2026 · Apt 1FLOOR

    Close
  • Safety

    Carbon monoxide detector

    Aug 10, 2026 · Apt 1FLOOR

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Safety

    Carbon monoxide detector

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Door/window

    Door

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Unsanitary condition

    Mold

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Plumbing

    Bathtub/shower

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Water leak

    Slow leak

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Safety

    Smoke detector

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Flooring/stairs

    Floor

    Aug 4, 2026 · Apt 1STFLO

    Close
  • General

    Cabinet

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Door/window

    Door frame

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Plumbing

    Bathtub/shower

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Electric

    Outlet/switch

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Paint/plaster

    Ceiling

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Paint/plaster

    Wall

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Paint/plaster

    Wall

    Aug 4, 2026 · Apt 1STFLO

    Close
  • General

    Cabinet

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Outside building

    Porch/balcony

    Aug 4, 2026 · Apt 1STFLO

    Close
  • Safety

    Smoke detector

    Aug 2, 2026 · Apt 1STFLO

    Close
  • Paint/plaster

    Wall

    Aug 2, 2026 · Apt 1STFLO

    Close
  • Flooring/stairs

    Floor

    Aug 2, 2026 · Apt 1STFLO

    Close
  • Door/window

    Window frame

    Aug 2, 2026 · Apt 1STFLO

    Close
  • Plumbing

    Basin/sink

    Aug 2, 2026 · Apt 1STFLO

    Close
  • Safety

    Carbon monoxide detector

    Aug 2, 2026 · Apt 1STFLO

    Close
  • Paint/plaster

    Wall

    Aug 2, 2026 · Apt 1STFLO

    Close
  • Electric

    Outlet/switch

    Aug 2, 2026 · Apt 1STFLO

    Close
  • Unsanitary condition

    Pests

    Apr 19, 2026 · Apt 2NDFLO

    Close
  • Paint/plaster

    Cabinet

    Apr 19, 2026 · Apt 2NDFLO

    Close
  • Unsanitary condition

    Mold

    Apr 19, 2026 · Apt 2NDFLO

    Close
  • Door/window

    Door

    Apr 19, 2026 · Apt 2NDFLO

    Close
  • Plumbing

    Bathtub/shower

    Apr 19, 2026 · Apt 2NDFLO

    Close
  • Plumbing

    Basin/sink

    Apr 19, 2026 · Apt 2NDFLO

    Close
  • Plumbing

    Radiator

    Apr 19, 2026 · Apt 2NDFLO

    Close
  • Flooring/stairs

    Floor

    Apr 19, 2026 · Apt 2NDFLO

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Aug 7, 2025 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Two-family home (B2)
Year built
2005
Floors
2
Residential units
2
Building area
2,034 ft²
Lot area
1,369 ft²
Zoning
R5
Community board
414
Council district
31
Block / lot
15659 / 32
Assessed value
$44,520
Landmark / historic district
No

Questions about 13-43 Beach Channel Drive

Who owns 13-43 Beach Channel Drive?

The owner of record in NYC Department of City Planning PLUTO data is Tulloch, Kristine A.

Does 13-43 Beach Channel Drive have violations?

Yes. NYC HPD has recorded 85 housing violations at this property.

Is 13-43 Beach Channel Drive rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 13-43 Beach Channel Drive built?

City records list 2005 as the year it was built.

How many apartments are in 13-43 Beach Channel Drive?

It has 2 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.