roofy

87-07 Dumont Avenue

Queens, NY 11417BBL 4-11367-0043Map

Owner of record: Balsam Village 1 LLC

87-07 Dumont Avenue is a walk-up apartment building built in 1977 in Queens, 11417. It has 6 residential units across 3 floors. The owner of record is Balsam Village 1 LLC. HPD has recorded 18 housing violations here, most recently on February 11, 2026. 8 of the 18 most recent violations are still open.

HPD violations
18
DOB violations
6
ECB violations
0
HPD complaints
31

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Feb 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 18

  • C

    Replace or repair the self-closing doors that is missing or defective latch at building front entrance door at public hall, 1st story

    Feb 11, 2026

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set at building front entrance door at public hall, 1st story

    Feb 11, 2026

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at north wall in the kitchen located at apt 3b, 2nd story, 1st apartment from west at north

    May 17, 2025 · Apt 3B

    Open — Nov certified late
  • C

    M/d law abate the nuisance consisting of hot water temperature exceeds the allowable maximum of 130 degrees in the entire apartment located at apt 3b, 2nd story, 1st apartment from west at north

    May 17, 2025 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st room from east located at apt 3b, 2nd story, 1st apartment from west at north

    May 17, 2025 · Apt 3B

    Open — Nov certified late
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3b, 2nd story, 1st apartment from west at north

    May 17, 2025 · Apt 3B

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 4, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 6, 2021

    Closed — Violation dismissed
Show 8 more ↓
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    May 6, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    May 6, 2021

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at basement

    Jan 19, 2019

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at basement

    Jan 19, 2019

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at basement

    Jan 19, 2019

    Open — Nov sent out
  • A

    D26-20.08,20.09 adm code file certification of satisfactory installation of smoke detecting device in accordance with h.p.d. rules and regulations.

    Jan 18, 1983

    Closed — Violation closed
  • A

    Section 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing.

    Mar 5, 1982

    Open — Nov sent out
  • A

    D26-41.15 adm code post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Mar 5, 1982

    Open — Nov sent out

DOB building violations · 6

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    May 13, 2025 · Apt 3B

    Close
  • Paint/plaster

    Wall

    May 13, 2025 · Apt 3B

    Close
  • Electric

    Outlet/switch

    May 13, 2025 · Apt 3B

    Close
  • Unsanitary condition

    Mold

    May 13, 2025 · Apt 3B

    Close
  • Water leak

    Slow leak

    May 16, 2021 · Apt 3A

    Close
  • Paint/plaster

    Wall

    May 13, 2021 · Apt 3A

    Close
  • Plumbing

    Bathtub/shower

    May 13, 2021 · Apt 3A

    Close
  • Flooring/stairs

    Floor

    May 13, 2021 · Apt 3A

    Close
  • Electric

    No lighting

    May 3, 2021 · Apt BLDG

    Close
Show 21 more ↓
  • Heat/hot water

    Entire building

    May 1, 2021 · Apt 2A

    Close
  • Plumbing

    Bathtub/shower

    Apr 28, 2021 · Apt B

    Close
  • Electric

    No lighting

    Mar 24, 2021 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Feb 14, 2021 · Apt B

    Close
  • Plumbing

    Toilet

    Mar 2, 2019 · Apt 3A

    Close
  • Plumbing

    Toilet

    Mar 1, 2019 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Jan 8, 2019 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Jan 8, 2019 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Jan 8, 2019 · Apt 3A

    Close
  • Plumbing

    Toilet

    Jan 8, 2019 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Jan 8, 2019 · Apt 3A

    Close
  • Paint/plaster

    Ceiling

    Jan 8, 2019 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Jan 8, 2019 · Apt 3A

    Close
  • Water leak

    Heavy flow

    Jul 22, 2018 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 1, 2018 · Apt 3B

    Close
  • Heating

    Heat related

    Feb 23, 2014 · Apt NA

    Close
  • Nonconst

    Vermin

    Apr 15, 2010 · Apt 3B

    Close
  • Nonconst

    Rubbish

    Apr 15, 2010 · Apt 3B

    Close
  • Nonconst

    Vermin

    Apr 11, 2010 · Apt 2B

    Close
  • Nonconst

    Carbon monoxide

    Nov 27, 2004 · Apt 3A

    Close
  • Nonconst

    Carbon monoxide

    Nov 27, 2004 · Apt 3B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1977
Floors
3
Residential units
6
Building area
3,960 ft²
Lot area
5,038 ft²
Zoning
R4
Community board
410
Council district
32
Block / lot
11367 / 43
Assessed value
$374,850
Landmark / historic district
No

HPD registration #421592, last renewed Jul 16, 2025.

Questions about 87-07 Dumont Avenue

Who owns 87-07 Dumont Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Balsam Village 1 LLC.

Does 87-07 Dumont Avenue have violations?

Yes. NYC HPD has recorded 18 housing violations at this property.

Is 87-07 Dumont Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 87-07 Dumont Avenue built?

City records list 1977 as the year it was built.

How many apartments are in 87-07 Dumont Avenue?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.