roofy

88-19 133 Avenue

Queens, NY 11417BBL 4-11351-0105Map

Owner of record: Balsam Village 1 LLC

88-19 133 Avenue is a walk-up apartment building built in 1977 in Queens, 11417. It has 6 residential units across 3 floors. The owner of record is Balsam Village 1 LLC. HPD has recorded 16 housing violations here, most recently on August 31, 2026. 9 of the 16 most recent violations are still open.

HPD violations
16
DOB violations
8
ECB violations
0
HPD complaints
40

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 31, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 16

  • C

    Provide ready access to buildings heating system door lock at basement at boiler room

    Aug 31, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3a, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 3A

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3a, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 3A

    Open — Civ14 mailed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing on wall at public hall, 1st story

    Aug 31, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 31, 2026

    Open — Nov certified on time
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing on wall at public hall, 1st story

    Aug 31, 2026

    Open — Nov certified on time
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 2nd story, 1st apartment from east at south

    Aug 31, 2026 · Apt 3A

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 12, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 15, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 4, 2022

    Closed — Violation dismissed
Show 6 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 21, 2016

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 2nd story, apartment at west

    Jan 23, 2013 · Apt 3B

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperative in the entire apartment located at apt 3b, 2nd story, apartment at west

    Jan 23, 2013 · Apt 3B

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system padlock on door at cellar

    Jan 23, 2013

    Open — Nov certified late
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north at west located at apt 1b, 1st apartment from east at south

    Aug 6, 2006 · Apt 1B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color north and west walls in the 2nd room from north at west located at apt 1b, 1st apartment from east at south

    Aug 6, 2006 · Apt 1B

    Open — Nov sent out

DOB building violations · 8

  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Plumbing

    Toilet

    Aug 29, 2026 · Apt 3A

    Close
  • Plumbing

    Bathtub/shower

    Aug 29, 2026 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Aug 29, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2023 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Nov 5, 2021 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Feb 17, 2021 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Feb 17, 2021 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Oct 17, 2020 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    May 8, 2020 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 6, 2020 · Apt BLDG

    Close
Show 30 more ↓
  • Plumbing

    Basin/sink

    Oct 17, 2019 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Apr 10, 2019 · Apt 1

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 17, 2019 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2019 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Apr 15, 2018 · Apt 2B

    Close
  • Door/window

    Window frame

    Mar 12, 2018 · Apt 2A

    Close
  • Door/window

    Window frame

    Mar 12, 2018 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 28, 2017 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Nov 7, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 4, 2017 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2016 · Apt 1B

    Close
  • Appliance

    Electric/gas range

    Dec 5, 2015 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Dec 5, 2015 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Aug 13, 2015 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Jan 10, 2015 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2014 · Apt 3A

    Close
  • Heating

    Heat related

    Jan 23, 2014 · Apt 1A

    Close
  • Heating

    Heat related

    Jan 8, 2014 · Apt 3B

    Close
  • Heating

    Heat related

    Dec 10, 2013 · Apt 2A

    Close
  • Heating

    Heat related

    Apr 11, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Feb 21, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Feb 5, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Feb 3, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Jan 23, 2013 · Apt NA

    Close
  • Heating

    Heat related

    Jan 18, 2013 · Apt 3B

    Close
  • Heating

    Heat related

    Jan 3, 2013 · Apt 3B

    Close
  • Heating

    Heat related

    Nov 27, 2012 · Apt NA

    Close
  • Plumbing

    Water supply

    Aug 6, 2006 · Apt 3A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1977
Floors
3
Residential units
6
Building area
3,960 ft²
Lot area
3,240 ft²
Zoning
R4
Community board
410
Council district
32
Block / lot
11351 / 105
Assessed value
$374,850
Landmark / historic district
No

HPD registration #421470, last renewed Jul 16, 2025.

Questions about 88-19 133 Avenue

Who owns 88-19 133 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Balsam Village 1 LLC.

Does 88-19 133 Avenue have violations?

Yes. NYC HPD has recorded 16 housing violations at this property.

Is 88-19 133 Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 88-19 133 Avenue built?

City records list 1977 as the year it was built.

How many apartments are in 88-19 133 Avenue?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.