89-01 133 Avenue
Queens, NY 11417BBL 4-11351-0103Map
Owner of record: Balsam Village 1 LLC
89-01 133 Avenue is a walk-up apartment building built in 1977 in Queens, 11417. It has 6 residential units across 3 floors. The owner of record is Balsam Village 1 LLC. HPD has recorded 25 housing violations here, most recently on June 12, 2025. 7 of the 25 most recent violations are still open.
- HPD violations
- 25
- DOB violations
- 5
- ECB violations
- 0
- HPD complaints
- 25
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 25
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeds the allowable maximum of 130 degrees in the entire apartment located at apt 3b, 2nd story, 1st apartment from west at north
Apr 10, 2025 · Apt 3B
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degrees at bathroom and in the kitchen located at apt 3b, 3rd story, 1st apartment from west at north
Mar 26, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Mar 26, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north
Mar 26, 2025 · Apt 3B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than ten square feet at ceiling and all walls in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north
Mar 26, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north
Mar 26, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Mar 26, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak ceiling in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Mar 26, 2025 · Apt 3B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than ten square feet at ceiling and all walls in the bathroom located at apt 3b, 3rd story, 1st apartment from west at north original violation 17787247 issued 26-mar-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 26, 2025 · Apt 3B
Open — Defect letter issued
Show 15 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall and east wall and ceiling in the 1st room from north at west located at apt 3b, 3rd story, 1st apartment from west at north
Mar 26, 2025 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apartment door in the entrance located at apt 3b, 3rd story, 1st apartment from west at north
Mar 26, 2025 · Apt 3B
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 15, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective mortise lock at building entrance , 1st story
Oct 13, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 4, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ....
Dec 21, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 21, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ...
Dec 21, 2020
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Dec 21, 2020
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of 3 bikes and household items. at public hall, 1st story
Dec 21, 2020
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 1, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 27, 2015
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3b, 2nd story, apartment at north
Jul 5, 2007 · Apt 3B
Open — Nov sent out - BHazardous
Arrange and make self-closing the doors - in the entrance located at apt 3b, 2nd story, apartment at north
Jul 5, 2007 · Apt 3B
Open — Nov sent out
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Apr 8, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Mar 28, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Mar 28, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Mar 26, 2025 · Apt BLDG
Close - Door/window
Door
Sep 28, 2022 · Apt 3B
Close - Door/window
Door
Sep 12, 2022 · Apt 3B
Close - Heat/hot water
Entire building
Dec 19, 2020 · Apt 2B2NDF
Close - Electric
Power outage
Dec 19, 2020 · Apt 2B2NDF
Close - Unsanitary condition
Pests
Mar 20, 2018 · Apt 3A
Close - Door/window
Window pane
Apr 24, 2017 · Apt 3B
Close
Show 15 more ↓
- Door/window
Window frame
Mar 17, 2017 · Apt 2B
Close - Water leak
Slow leak
Mar 17, 2017 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 17, 2017 · Apt 2B
Close - Paint/plaster
Ceiling
Mar 17, 2017 · Apt 2B
Close - Heating
Heat related
Nov 9, 2010 · Apt 3B
Close - General
Windows
Jul 1, 2008 · Apt 3B
Close - General
Doors
Jul 1, 2008 · Apt 3B
Close - Nonconst
Rubbish
Jun 24, 2007 · Apt 2A
Close - Nonconst
Vermin
Jun 4, 2007 · Apt 3B
Close - Nonconst
Vermin
Mar 28, 2007 · Apt 3B
Close - Heating
Heat related
Jan 25, 2007 · Apt 1B
Close - Heating
Heat related
Dec 9, 2006 · Apt 1B
Close - Heating
Heat related
Dec 8, 2006 · Apt 1B
Close - Heating
Heat related
Nov 19, 2006 · Apt 1A
Close - Heating
Heat related
Nov 5, 2006 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1977
- Floors
- 3
- Residential units
- 6
- Building area
- 3,900 ft²
- Lot area
- 2,324 ft²
- Zoning
- R4
- Community board
- 410
- Council district
- 32
- Block / lot
- 11351 / 103
- Assessed value
- $369,000
- Landmark / historic district
- No
HPD registration #421481, last renewed Jul 16, 2025.
Questions about 89-01 133 Avenue
Who owns 89-01 133 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Balsam Village 1 LLC.
Does 89-01 133 Avenue have violations?
Yes. NYC HPD has recorded 25 housing violations at this property.
Is 89-01 133 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 89-01 133 Avenue built?
City records list 1977 as the year it was built.
How many apartments are in 89-01 133 Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.