89-10 150 Street
Queens, NY 11435BBL 4-09681-0071Map
Owner of record: 8910s LLC
89-10 150 Street is an elevator apartment building built in 2023 in Queens, 11435. It has 31 residential units across 8 floors. The owner of record is 8910s LLC. HPD has recorded 12 housing violations here, most recently on October 13, 2026. 7 of the 12 most recent violations are still open. City tax records listed 32 rent-stabilized apartments here in 2024.
- HPD violations
- 12
- DOB violations
- 2
- ECB violations
- 16
- HPD complaints
- 15
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 401, 4th story, 1st apartment from east at south
Oct 13, 2026 · Apt 401
Open — Notice of issuance sent to tenant - CImmediately hazardous
Remove the illegal fastening consisting of unacceptable electromagnetic locking device installed at vestibule door at public hall, 1st story
Oct 13, 2026
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch set at vestibule door at public hall, 1st story
Oct 13, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 7, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchen located at apt 604, 6th story, 1st apartment from west at north
Jun 28, 2025 · Apt 604
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at north located at apt 604, 6th story, 1st apartment from west at north
Jun 28, 2025 · Apt 604
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 3rd room from east at north located at apt 604, 6th story, 1st apartment from west at north
Jun 28, 2025 · Apt 604
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchen located at apt 604, 6th story, 1st apartment from west at north
Jun 28, 2025 · Apt 604
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the 3rd room from east at north located at apt 604, 6th story, 1st apartment from west at north original violation 18057389 issued 28-jun-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 28, 2025 · Apt 604
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 12, 2025
Closed — Violation dismissed
Show 2 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door at north wall at public hall, 1st story
May 18, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at fire door at north wall at public hall, 1st story
May 18, 2025
Open — Nov sent out
DOB building violations · 2
- Construction other optional
Boro commissioner has ordered work stopped for # q00636152-i 1 due to gc # 622911 license revocation.
Apr 26, 2024
Dob violation - dismissed - Construction other optional
Boro commissioner has ordered work stopped for # q00636152-i 1 due to gc # 622911 license revocation.
Apr 26, 2024
Dob violation - dismissed
ECB violations · 16
- Class - 2
Work without a permit. note: observed work has been done to pave with concrete the entire front of this location approximately 2400 square feet including sidewalk without a permit., obtain all permits
Jun 17, 2024 · Penalty $1,250
Resolve - Class - 2
Failure to maintain building in code-compliant manner. note: observed sidewalk with inadequate slope surface (grade elevation changed) at front of this location in violation of construction code and dot regulat
Jun 17, 2024 · Penalty $625
Resolve - Class - 2
Fire code/observed 8 story building without active construction operation,uppon checking the standpipe connection at street level pressurized system reads 0 psi.observed cut pipe/disconnected -standpipe must be
Sep 9, 2023
Resolve - Class - 2
At inspection, it was observed failure to provide upon request - re-shore/shoring plan, safety strap log, sidewalk shed maintenance log, tool box talk meeting was last held on 5/22/23 and no pre-shift was held
Jun 24, 2023
Resolve - Class - 2
At inspection, it was observed: failure to install sidewalk shed as per code - missing reflective/high visibility paint on driveway, missing cross bracing as per plan, missing light fixtures, failed to provide
Jun 24, 2023 · Penalty $2,430
Resolve - Class - 2
Obstruction of street and sidewalks - failure to provide dot permit for dumpster: at inspection it was observed dumpster on street at exp.1 and upon request for dot permit none was provided/available contrary t
Jun 24, 2023
Resolve - Class - 2
At inspection it was observed: failure to provide over head protection at exp.2 with work platform at 2nd floor over hanging on adjacent property and on exp.4,ohp was not provided as per ssp -004.00 page 4 of 5
Jun 24, 2023 · Penalty $5,030
Resolve - Class - 2
At inspection, it was observed: failure to provide adequate housekeeping with construction materials and debris that were combustible and not contained all over jobsite, materials were stored close to leading e
Jun 24, 2023
Resolve - Class - 2
During inspection of a active proposed 8 story construction site i observed inadequate housekeeping at exposures 1 & 3. i observed a trash, material, debris mix covering the entire rear yard and material and de
Jun 22, 2023
Resolve - Class - 2
Upon inspection of an active 8 story nb construction site i observed a sidewalk shed installed at exposure 1. upon request to see the following documents to be kept on site none were provided at the time of ins
Jun 22, 2023
Resolve
Show 6 more ↓
- Class - 2
Upon inspection of a active proposed 8 story nb i observed a sidewalk shed installed at exposure 1 without a code compliant parapet sign. parapet signs should include the contractor of the site or owner of the
Jun 22, 2023
Resolve - Class - 2
Upon inspection i observed a sidewalk shed installed at exposure 1. upon review of approved drawings it was confirmed the shed was installed contrary to plans. shed is missing a bay, cross bracing in wrong loca
Jun 22, 2023
Resolve - Class - 2
No fire extinguishers. at the time of my inspection of an active proposed 8 story construction site upon inspection of the 2nd floor i observed no adequate fire extinguishers in place. i observed only 1 fire ex
Jun 22, 2023
Resolve - Class - 1
Inspection of an 8 story building with work in progress, observed two worker on site with truck cross sidewalk for soil removel . upon my request for deperment of transportation docoment for scope of work none
Feb 2, 2023 · Penalty $2,530
Resolve - Class - 2
At the time of inspection on inactive alt site, i observed a construction fence erected at exposure #1 that was missing a project information panel as required.
May 26, 2022
Resolve - Class - 2
At the time of inspection on inactive alt site, i observed a construction fence erected at exposures #1, 2 and 4 missing viewing panels as required.
May 26, 2022
Resolve
Complaints
- Electric
Power outage
Oct 13, 2026 · Apt 401
Close - Unsanitary condition
Pests
Oct 13, 2026 · Apt 401
Close - Electric
Power outage
Oct 13, 2026 · Apt 305
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt 404
Open - Unsanitary condition
Pests
May 30, 2026 · Apt 401
Close - Plumbing
Toilet
Apr 14, 2026 · Apt 305
Close - Safety
Smoke detector
Apr 14, 2026 · Apt 305
Close - Plumbing
Basin/sink
Oct 22, 2025 · Apt 701
Close - Electric
Power outage
Oct 8, 2025 · Apt 305
Close - Plumbing
Toilet
Jul 30, 2025 · Apt 305
Close
Show 5 more ↓
- Plumbing
Water supply
Jun 28, 2025 · Apt 604
Close - Appliance
Electric/gas range
Jun 3, 2025 · Apt 604
Close - Plumbing
Toilet
May 24, 2025 · Apt 305
Close - Plumbing
Toilet
May 23, 2025 · Apt 305
Close - Appliance
Electric/gas range
Jan 16, 2025 · Apt 604
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2023
- Floors
- 8
- Residential units
- 31
- Building area
- 25,591 ft²
- Lot area
- 6,300 ft²
- Zoning
- R7X
- Community board
- 412
- Council district
- 27
- Block / lot
- 9681 / 71
- Assessed value
- $1,953,000
- Landmark / historic district
- No
HPD registration #434373, last renewed Oct 6, 2025.
Questions about 89-10 150 Street
Who owns 89-10 150 Street?
The owner of record in NYC Department of City Planning PLUTO data is 8910s LLC.
Does 89-10 150 Street have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 89-10 150 Street rent stabilized?
NYC Department of Finance tax bills listed 32 rent-stabilized units here in 2024 (about 100% of its 31 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 89-10 150 Street built?
City records list 2023 as the year it was built.
How many apartments are in 89-10 150 Street?
It has 31 residential units and 32 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.