73-07 153 Street
Queens, NY 11367BBL 4-06807-0002Map
Owner of record: Kew Gardens Hills, LLC
73-07 153 Street is a walk-up apartment building built in 1950 in Queens, 11367. It has 120 residential units across 3 floors. The owner of record is Kew Gardens Hills, LLC. HPD has recorded 1,022 housing violations here, most recently on October 4, 2026. 39 of the 50 most recent violations are still open. City tax records listed 115 rent-stabilized apartments here in 2024.
- HPD violations
- 1,022
- DOB violations
- 69
- ECB violations
- 12
- HPD complaints
- 1,531
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,022
- CImmediately hazardous
Properly repair or replace the broken or defective locking assembly device at building front entrance door at public hall, 1st story
Oct 4, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective base cabinet at the wash basin in the bathroom located at apt 2f, 2nd story, 2nd apartment from east at south
Sep 18, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 2f, 2nd story, 2nd apartment from east at south
Sep 18, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2f, 2nd story, 2nd apartment from east at south
Sep 18, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Properly secure the loose wooden molding at the ceiling at public hall, 1st story
Sep 18, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lower glass pane at the window at south in the kitchen located at apt 2f, 2nd story, 2nd apartment from east at south
Sep 18, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 2f, 2nd story, 2nd apartment from east at south
Sep 18, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 4th room from east at north located at apt 2f, 2nd story, 2nd apartment from east at south
Sep 18, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective street entance door latch to building , 1st story
Sep 11, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective street entance door latch to building , 1st story
Sep 11, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 3d, 3rd story, 2nd apartment from east at south
Sep 11, 2026 · Apt 3D
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak south wall in the 1st room from east located at apt 3d, 3rd story, 2nd apartment from east at south
Sep 11, 2026 · Apt 3D
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 1st room from east located at apt 3d, 3rd story, 2nd apartment from east at south
Sep 11, 2026 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 2nd apartment from east at south
Sep 11, 2026 · Apt 3D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective street entance door latch to building , 1st story
Sep 11, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell buzzer at west wall in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Sep 4, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at south stack building front at fire escape
Sep 4, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at firedoor at south wall leading to rear yard at public hall, 1st story
Sep 4, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch assembly at building front
Aug 26, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door
Aug 26, 2026
Closed — Violation closed - CImmediately hazardous
Remove all obstructions from water closet .. in the bathroom located at apt 3f, 3rd story, 2nd apartment from east at south
Aug 21, 2026 · Apt 3F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall and ceiling in the bathroom located at apt 1f, 1st story, 2nd apartment from east at south
Aug 21, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the bathroom located at apt 1f, 1st story, 2nd apartment from east at south
Aug 21, 2026 · Apt 1F
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at north wall in the bathroom located at apt 1f, 1st story, 2nd apartment from east at south
Aug 21, 2026 · Apt 1F
Open — Civ14 mailed - BHazardous
Replace the broken or defective sink in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south
Aug 21, 2026 · Apt 3F
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in sink waste line in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south
Aug 21, 2026 · Apt 3F
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wash tub waste line in the bathroom located at apt 3f, 3rd story, 2nd apartment from east at south
Aug 21, 2026 · Apt 3F
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wash basin waste line in the bathroom located at apt 3f, 3rd story, 2nd apartment from east at south
Aug 21, 2026 · Apt 3F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood flooring in the 2nd room from north located at apt 1f, 1st story, 2nd apartment from east at south
Aug 21, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east at north, the bathroom located at apt 2f, 2nd story, 2nd apartment from east at south
Aug 12, 2026 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 2nd apartment from east at south
Aug 12, 2026 · Apt 2F
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1e, 1st story, 1st apartment from east at south
Aug 6, 2026 · Apt 1E
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall at bathtub in the bathroom located at apt 1e, 1st story, 1st apartment from east at south
Aug 6, 2026 · Apt 1E
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 1e, 1st story, 1st apartment from east at south
Aug 6, 2026 · Apt 1E
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective latch at building entrance door , 1st story
Aug 5, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood door frame in the entrance located at apt 3d, 3rd story, 2nd apartment from east at south
Aug 5, 2026 · Apt 3D
Closed — Violation closed - BHazardous
Abate the nuisance consisting of pests. evidence of ticks in the entire apartment located at apt 3d, 3rd story, 2nd apartment from east at south
Aug 5, 2026 · Apt 3D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at window reveal at south wall in the 1st room from east located at apt 3d, 3rd story, 2nd apartment from east at south
Aug 5, 2026 · Apt 3D
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective latch set at building front entrance door , 1st story
Aug 5, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective strike plate in the entrance located at apt 3d, 3rd story, 2nd apartment from east at south
Aug 5, 2026 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story
Aug 5, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2h, 2nd story, 1st apartment from east at south
Aug 5, 2026 · Apt 2H
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2h, 2nd story, 1st apartment from east at south
Aug 5, 2026 · Apt 2H
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch on 2nd door leading to parking lot at public hall, 1st story
Aug 5, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch on 1st door leading to parking lot at public hall, 1st story
Aug 5, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Jul 30, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Jul 30, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at stack at east at building rear at fire escape
Jul 29, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective metal soffit at awning at entrance at building front , 1st story
Jul 29, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Jul 27, 2026
Open — Not complied with
DOB building violations · 69
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 12
- Class - 3
Failure to maintain building in code-compliant manner. at time of inspection, observed, the celling is in disrepair and in apt# 2f a large water bulging & leaking at kitchen entrance celling is coming from the
Jan 27, 2023 · Penalty $500
Active - Class - 2
Controls missing covers, missing pressure relief valve discharge piping, missing flue spillage switch, flame rollout switch improperly used as a flue spillage switch. correct all violating conditions and submit
Dec 28, 2022 · Penalty $625
Active - Non-hazardous
Bq9 49 37 36 49-gas shut off boiler fail inspection.36-not registered.bq9-no permit.37-boiler not ready to inspection.
Nov 3, 2000 · Penalty $350
Resolve - Non-hazardous
Bq9-work without a permit/boiler not ready.49-shut gas off boiler fail inspection/36 not registered.
Nov 3, 2000 · Penalty $350
Resolve - Non-hazardous
Bq9 36 37 49 bq9-work without permit.49-gas shut off boiler failed.36-boiler not registered.37-boiler not ready for inspection.
Nov 3, 2000 · Penalty $350
Resolve - Non-hazardous
Bq9 36 37 49 bq9-work without a permit.37-boiler not ready for inspection.36-boiler not registered.49-gas shut off boiler failed.
Nov 3, 2000 · Penalty $350
Resolve - Non-hazardous
Bq9-work without a permit.37-boiler not ready for inspection.36-boiler not registered.49-gas shut off boiler failed inspection.
Nov 3, 2000 · Penalty $350
Resolve - Non-hazardous
4a 36 boiler-hot water installed without permits.
Nov 3, 2000 · Penalty $800
Resolve - Non-hazardous
4a 36 hot water boiler installed-without permits.
Nov 3, 2000 · Penalty $800
Resolve - Non-hazardous
4a 36 hot water boiler installed-without permits.
Nov 3, 2000 · Penalty $800
Resolve
Show 2 more ↓
- Non-hazardous
4a 36 hot water boiler installed without permits.
Nov 3, 2000 · Penalty $800
Resolve - Non-hazardous
4a 36 hot water boiler installed-without permit.
Nov 3, 2000 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
Oct 7, 2026 · Apt 3E
Open - Paint/plaster
Wall
Sep 27, 2026 · Apt 1H
Open - Door/window
Door
Sep 27, 2026 · Apt 1H
Open - Plumbing
Toilet
Sep 27, 2026 · Apt 1H
Open - Unsanitary condition
Pests
Sep 27, 2026 · Apt 1H
Open - Plumbing
Basin/sink
Sep 25, 2026 · Apt 1H
Open - Plumbing
Toilet
Sep 17, 2026 · Apt 3F
Open - Unsanitary condition
Garbage/recycling storage
Sep 17, 2026 · Apt 3F
Open - General
Bell/buzzer/intercom
Sep 17, 2026 · Apt 3F
Open - Unsanitary condition
Sewage
Sep 17, 2026 · Apt 3F
Open
Show 40 more ↓
- Unsanitary condition
Sewage
Sep 17, 2026 · Apt 3F
Open - Unsanitary condition
Mold
Sep 17, 2026 · Apt 3F
Open - Water leak
Heavy flow
Sep 16, 2026 · Apt 2F
Close - Door/window
Door
Aug 29, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Aug 26, 2026 · Apt 2F
Close - Plumbing
Steam pipe/riser
Aug 26, 2026 · Apt 2F
Close - Unsanitary condition
Mold
Aug 15, 2026 · Apt 1F
Close - Door/window
Door
Aug 7, 2026 · Apt 1C
Close - Water leak
Slow leak
Aug 7, 2026 · Apt 1C
Close - Door/window
Door
Aug 5, 2026 · Apt 1B
Close - Water leak
Slow leak
Aug 1, 2026 · Apt 3D
Close - Unsanitary condition
Mold
Aug 1, 2026 · Apt 3D
Close - Door/window
Door
Aug 1, 2026 · Apt 3D
Close - Unsanitary condition
Sewage
Aug 1, 2026 · Apt 3D
Close - Plumbing
Toilet
Aug 1, 2026 · Apt 3D
Close - Door/window
Window frame
Jul 30, 2026 · Apt 3F
Close - Plumbing
Toilet
Jul 30, 2026 · Apt 3F
Close - Unsanitary condition
Mold
Jul 30, 2026 · Apt 3F
Close - Unsanitary condition
Sewage
Jul 30, 2026 · Apt 3F
Close - General
Janitor/super
Jul 29, 2026 · Apt 3F
Close - Plumbing
Water supply
Jul 29, 2026 · Apt 3F
Close - Unsanitary condition
Garbage/recycling storage
Jul 28, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 28, 2026 · Apt BLDG
Close - Safety
Fire escape
Jul 28, 2026 · Apt BLDG
Close - Unsanitary condition
Sewage
Jul 28, 2026 · Apt 3F
Close - Unsanitary condition
Sewage
Jul 26, 2026 · Apt 3F
Close - Unsanitary condition
Pests
Jul 26, 2026 · Apt 1H
Close - Safety
Carbon monoxide detector
Jul 26, 2026 · Apt 3D
Close - Plumbing
Toilet
Jul 26, 2026 · Apt 3F
Close - Unsanitary condition
Mold
Jul 26, 2026 · Apt 3F
Close - Plumbing
Toilet
Jul 26, 2026 · Apt 3F
Close - Appliance
Refrigerator
Jul 26, 2026 · Apt 1H
Close - Unsanitary condition
Sewage
Jul 26, 2026 · Apt 3F
Close - Door/window
Door frame
Jul 26, 2026 · Apt 3D
Close - Safety
Smoke detector
Jul 26, 2026 · Apt 3D
Close - Door/window
Window frame
Jul 26, 2026 · Apt 3D
Close - Water leak
Slow leak
Jul 26, 2026 · Apt 3D
Close - Door/window
Door
Jul 26, 2026 · Apt 3D
Close - Unsanitary condition
Pests
Jul 26, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Jul 26, 2026 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C9)
- Year built
- 1950
- Floors
- 3
- Residential units
- 120
- Building area
- 97,320 ft²
- Lot area
- 99,500 ft²
- Zoning
- R4
- Community board
- 408
- Council district
- 24
- Block / lot
- 6807 / 2
- Assessed value
- $4,682,700
- Landmark / historic district
- No
HPD registration #409615, last renewed Oct 8, 2025.
Questions about 73-07 153 Street
Who owns 73-07 153 Street?
The owner of record in NYC Department of City Planning PLUTO data is Kew Gardens Hills, LLC.
Does 73-07 153 Street have violations?
Yes. NYC HPD has recorded 1,022 housing violations at this property.
Is 73-07 153 Street rent stabilized?
NYC Department of Finance tax bills listed 115 rent-stabilized units here in 2024 (about 96% of its 120 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 73-07 153 Street built?
City records list 1950 as the year it was built.
How many apartments are in 73-07 153 Street?
It has 120 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.