72-24 Kissena Boulevard
Queens, NY 11367BBL 4-06803-0002Map
Owner of record: Kew Gardens Hills, LLC
72-24 Kissena Boulevard is a walk-up apartment building built in 1950 in Queens, 11367. It has 119 residential units across 3 floors. The owner of record is Kew Gardens Hills, LLC. HPD has recorded 915 housing violations here, most recently on October 7, 2026. 49 of the 50 most recent violations are still open. City tax records listed 119 rent-stabilized apartments here in 2024.
- HPD violations
- 915
- DOB violations
- 104
- ECB violations
- 30
- HPD complaints
- 1,642
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 915
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch , 1st story
Oct 7, 2026
Open — Violation open - BHazardous
Properly repair or replace the broken or defective building entrance door latch assembly , 1st story
Oct 7, 2026
Open — Violation open - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from west at north wall in the foyer located at apt 1d, 1st story, 2nd apartment from east at south
Oct 4, 2026 · Apt 1D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at east, the kitchen , the private hallway located at apt 1d, 1st story, 2nd apartment from east at south
Oct 4, 2026 · Apt 1D
Open — Nov sent out - ANon-hazardous
Refit wall cabinet door in the kitchen located at apt 1d, 1st story, 2nd apartment from east at south
Oct 4, 2026 · Apt 1D
Open — Nov sent out - BHazardous
Repair the broken or defective connection at drain pipe at sink in the kitchen located at apt 1d, 1st story, 2nd apartment from east at south
Oct 4, 2026 · Apt 1D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the foyer located at apt 1d, 1st story, 2nd apartment from east at south
Oct 4, 2026 · Apt 1D
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from west at north wall in the foyer located at apt 1d, 1st story, 2nd apartment from east at south
Oct 4, 2026 · Apt 1D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Oct 4, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Oct 4, 2026 · Apt 1E
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a , 3rd story, 1st apartment from south at west
Sep 30, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a , 3rd story, 1st apartment from south at west
Sep 30, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective bell buzzer from building front to receiver panel at south wall , 3rd story
Sep 30, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north located at apt 3c, 3rd story, 1st apartment from north at east
Sep 30, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the private hallway located at apt 3c, 3rd story, 1st apartment from north at east
Sep 30, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 3c, 3rd story, 1st apartment from north at east
Sep 30, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east
Sep 30, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east and south walls in the kitchenette located at apt 3c, 3rd story, 1st apartment from north at east
Sep 30, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Sep 30, 2026 · Apt 3C
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective bell buzzer from building front to receiver panel at north wall in the entrance located at apt 3c, 3rd story, 1st apartment from north at east
Sep 30, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 4th room from north at west located at apt 1a, 1st story, 1st apartment from south at west
Sep 18, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Sep 18, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Sep 18, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Sep 18, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Sep 18, 2026 · Apt 1A
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the bathroom , the kitchen , the 1st room from north, the 4th room from north at west, the foyer located at apt 1a, 1st story, 1st apartment from south at west
Sep 18, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Sep 18, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 3e, 3rd story, 2nd apartment from north at east
Sep 10, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling , south and west walls in the foyer located at apt 3e, 3rd story, 2nd apartment from north at east
Sep 10, 2026 · Apt 3E
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling at cellar
Sep 4, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 1st apartment from north at east
Aug 26, 2026 · Apt 1G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at north wall in the foyer located at apt 1g, 1st story, 1st apartment from north at east
Aug 26, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from north located at apt 3e, 3rd story, 1st apartment from north at east
Aug 25, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 3e, 3rd story, 1st apartment from north at east
Aug 25, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 3e, 3rd story, 1st apartment from north at east
Aug 25, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall around window sill in the 3rd room from north located at apt 1e, 1st story, 1st apartment from west at north
Aug 18, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 2nd room from north at west located at apt 1e, 1st story, 1st apartment from west at north
Aug 18, 2026 · Apt 1E
Open — Invalid certification - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 3rd room from north located at apt 1e, 1st story, 1st apartment from west at north
Aug 18, 2026 · Apt 1E
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 1st apartment from west at north
Aug 18, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective hardwood floor in the private hallway located at apt 1e, 1st story, 1st apartment from west at north
Aug 18, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq feet around top of window in the 3rd room from north located at apt 1e, 1st story, 1st apartment from west at north
Aug 18, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 3e, 3rd story, 1st apartment from south at west
Aug 10, 2026 · Apt 3E
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective light fixture at the ceiling in the foyer located at apt 3e, 3rd story, 1st apartment from south at west
Aug 10, 2026 · Apt 3E
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the foyer located at apt 3e, 3rd story, 1st apartment from south at west
Aug 10, 2026 · Apt 3E
Open — Violation will be reinspected - CImmediately hazardous
Repair the roof so that it will not leak over the ceiling ceiling in the foyer located at apt 3e, 3rd story, 1st apartment from south at west
Aug 10, 2026 · Apt 3E
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 1st apartment from east at south
Aug 7, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Aug 7, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Aug 7, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Aug 7, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Aug 7, 2026 · Apt 2B
Open — Nov sent out
DOB building violations · 104
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active
Show 40 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 5, 2022
Dob violation - dismissed - Plumbing none
Commissioners request for immediate corrective action i observed in apartment 3c new gas lines valve behind stove and in cellar in gas meter room new gas piping going to apartments. observed condition(s) does not comply with section 28-105.1of the b101 and presents an imminent risk to public safety. correct the situation within 48 hours
Oct 7, 2021
Dob violation - active - Construction other optional
Boro commissioner has ordered work stopped for job # 421636279 due to applicant of record filing privileges suspended with the department of buildings
Jan 18, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
ECB violations · 30
- Class - 1
Work without a permit i observed in apartment 3c located on third floor new gas piping and gas valve behind stove. also in cellar in gas meter room installed new gas lines going to apartments (except apartment
Oct 7, 2021
Resolve - Class - 1
Gas being supplied to building without inspection and certification by dob i observed on the third floor in apartment 3c gas supplying stove without dob certification, file for required permits and have necessa
Oct 7, 2021
Resolve - Class - 1
Failure to maintain building in code complaint manner i observed on the third floor in apartment 3c having an open-end gas future on line behind stove, repair and/replace
Oct 7, 2021 · Penalty $1,250
Active - Class - 1
Failure to have new or altered plumbing system tested i observed in apartment 3c located on third floor new gas piping and gas valve behind stove. also in cellar in gas meter room installed new gas lines going
Oct 7, 2021
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #39011584j issued on 10/22/2019,and to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2).an acceptible cert
Dec 2, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #39011585l issued on 10/22/2019,and to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2).an acceptible cert
Dec 2, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #39011618z issued on 10/22/2019,and to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2).an acceptible cert
Dec 2, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation #39011617r issued on 10/22/2019,and to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2).an acceptible cert
Dec 2, 2020 · Penalty $1,250
Resolve - Class - 2
B 254 found utica gas fired boiler not registered, register the boiler and submit a certificate of correction
Oct 22, 2019 · Penalty $625
Active - Class - 2
B 254-36 found lockinvar gas fired boiler not registered, register the boiler and submit a certificate of correction
Oct 22, 2019 · Penalty $625
Active
Show 20 more ↓
- Class - 2
B 254-36 found utica gas fired boiler not registered, register the boiler and submit a certificate of correction
Oct 22, 2019 · Penalty $625
Active - Class - 2
B 254 found lockinvar gas fired boiler not registered, register the boiler and submit a certificate of corection
Oct 22, 2019 · Penalty $625
Active - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#32096446m issued on 3/30/18,and to file a certificate of correctionpursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Jan 15, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#32096447y issued on 3/30/18,and to file a certificate of correctionpursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Jan 15, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#32096448x issued on 3/30/18,and to file a certificate of correctionpursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Jan 15, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#32096449h issued on 3/30/18,and to file a certificate of correctionpursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Jan 15, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#32096444z issued on 3/30/18,and to file a certificate of correctionpursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Jan 15, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#32096445k issued on 3/30/18,and to file a certificate of correctionpursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Jan 15, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply w/ commissioner's order contained in summons/violation#32096443r issued on 3/30/18,and to file a certificate of correctionpursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable certificate
Jan 15, 2019 · Penalty $625
Resolve - Class - 2
36,3a,6a,4a b254-36 found lochinvar gas fired boiler not registered.register the boiler. correct all violating conditions and submit a certificate of correction.
Mar 30, 2018 · Penalty $625
Resolve - Class - 2
36,31,41. b254-36 found lochinvar gas fired boiler not registered register the boiler correct all violating conditions and sumbit a certificate of correction.
Mar 30, 2018 · Penalty $625
Resolve - Class - 2
36,4a,6a,34b,44c,15 b254-36 found uticas gas fired boiler not registered. register boiler, correct all violating conditions and submit a certificate of correction.
Mar 30, 2018 · Penalty $625
Resolve - Class - 2
36,3a,4a. b254-36 found lochimar gas fired boiler not registered. register the boiler. correct all violating conditions. submit a certificate of correction.
Mar 30, 2018 · Penalty $625
Resolve - Class - 2
36,4a,6a,15,50a. b254-36 found utica gas fired boiler not registered. 50a-covers missing off controls. register the boiler. correct all violating conditions and submit a certificate of correction.
Mar 30, 2018 · Penalty $625
Resolve - Class - 2
36,4a,15,21a,44c,50a,50b. b254-36-found utica gas fired boiler not registered 50a-no storage in boiler room; b-covers missing off controlsregister the boiler, correct all violating conditions and submit a cer
Mar 30, 2018 · Penalty $625
Resolve - Class - 2
36,4a,50a. b254-36 found lochinvar gas fired boiler not registered 50a-covers missing off controls. register the boiler, correct all violating conditions and submit a certificate of correction.
Mar 30, 2018 · Penalty $625
Resolve - Class - 2
B254,15,50a,50b,50c,50d,50e. 50a-rating for modular boilers/missing total)each boiler is 300,000 need rating plate for total of1,200,000) 50b-seal all holes in blr room;50c-cannot block fresh air; 50d-dischar
May 14, 2013 · Penalty $250
Resolve - Class - 2
B254,15,34a,50a,50b,50c,50d,50e,50f,50g. 50a-rating plate for modularboilers missing (total) (each boiler is 300,000 need rating plate for total 1,200,000; 50b-rotted leaking pipe on boiler #1 and 2; 50c-relie
May 14, 2013 · Penalty $250
Resolve - Non-hazardous
Observed & photos taken dryer vents emitting odor to apt. above also no sprinklers at dryers should be front & back. remedy:have licensed plumber or sprinkler contractor install sprinklers for safety & relocate
Apr 28, 2007 · Penalty $1,200
Active - Non-hazardous
Work without permit. work noted: built boiler room approx. 10'x20'x10'high (1/2 in ground) with cement blocks walls at rear of bldg. remedy:obtain a permit.
Nov 9, 2000
Resolve
Complaints
- Paint/plaster
Ceiling
Oct 4, 2026 · Apt 1E
Open - Water leak
Heavy flow
Oct 4, 2026 · Apt 1E
Open - General
Bell/buzzer/intercom
Oct 2, 2026 · Apt 3C
Open - General
Cabinet
Sep 30, 2026 · Apt 1D
Close - Door/window
Door frame
Sep 30, 2026 · Apt 1D
Close - Paint/plaster
Wall
Sep 30, 2026 · Apt 1D
Close - Appliance
Refrigerator
Sep 30, 2026 · Apt 1E
Open - Unsanitary condition
Pests
Sep 30, 2026 · Apt 1E
Open - Water leak
Damp spot
Sep 30, 2026 · Apt 1D
Close - Plumbing
Basin/sink
Sep 30, 2026 · Apt 1D
Close
Show 40 more ↓
- Door/window
Door
Sep 29, 2026 · Apt 3D
Open - Paint/plaster
Door/frame
Sep 29, 2026 · Apt 3D
Open - Water leak
Damp spot
Sep 29, 2026 · Apt 3D
Open - Safety
Smoke detector
Sep 29, 2026 · Apt 3D
Open - Unsanitary condition
Pests
Sep 29, 2026 · Apt 3D
Open - Unsanitary condition
Pests
Sep 29, 2026 · Apt 3D
Open - Unsanitary condition
Pests
Sep 29, 2026 · Apt 3D
Open - Flooring/stairs
Floor
Sep 29, 2026 · Apt 3D
Open - Unsanitary condition
Mold
Sep 29, 2026 · Apt 3D
Open - Door/window
Door
Sep 25, 2026 · Apt 1H
Close - Appliance
Refrigerator
Sep 25, 2026 · Apt 1H
Close - Unsanitary condition
Pests
Sep 25, 2026 · Apt 1H
Close - Electric
Lighting
Sep 25, 2026 · Apt 1H
Close - General
Bell/buzzer/intercom
Sep 19, 2026 · Apt 3A
Close - Paint/plaster
Ceiling
Sep 14, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 1A
Close - Appliance
Refrigerator
Sep 9, 2026 · Apt 1H
Close - Electric
Lighting
Sep 9, 2026 · Apt 1H
Close - Unsanitary condition
Pests
Sep 9, 2026 · Apt 1H
Close - General
Bell/buzzer/intercom
Sep 5, 2026 · Apt 3C
Close - Flooring/stairs
Floor
Sep 2, 2026 · Apt 1B
Open - Unsanitary condition
Pests
Aug 31, 2026 · Apt 1H
Close - Electric
Lighting
Aug 31, 2026 · Apt 1H
Close - Appliance
Refrigerator
Aug 31, 2026 · Apt 1H
Close - Water leak
Slow leak
Aug 18, 2026 · Apt 2E
Close - Appliance
Refrigerator
Aug 18, 2026 · Apt 2E
Close - Paint/plaster
Wall
Aug 18, 2026 · Apt 2E
Close - Plumbing
Toilet
Aug 18, 2026 · Apt 2E
Close - Safety
Smoke detector
Aug 18, 2026 · Apt 2E
Close - Paint/plaster
Ceiling
Aug 18, 2026 · Apt 2E
Close - General
Cabinet
Aug 18, 2026 · Apt 2E
Close - Paint/plaster
Radiator
Aug 18, 2026 · Apt 2E
Close - General
Bell/buzzer/intercom
Aug 18, 2026 · Apt 2E
Close - General
Cabinet
Aug 18, 2026 · Apt 2E
Close - Flooring/stairs
Floor
Aug 18, 2026 · Apt 2E
Close - Safety
Carbon monoxide detector
Aug 18, 2026 · Apt 2E
Close - Paint/plaster
Wall
Aug 18, 2026 · Apt 2E
Close - Plumbing
Water supply
Aug 18, 2026 · Apt 1D
Close - Unsanitary condition
Pests
Aug 18, 2026 · Apt APT3C
Close - Unsanitary condition
Pests
Aug 18, 2026 · Apt 2E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C9)
- Year built
- 1950
- Floors
- 3
- Residential units
- 119
- Building area
- 97,320 ft²
- Lot area
- 106,500 ft²
- Zoning
- R4
- Community board
- 408
- Council district
- 24
- Block / lot
- 6803 / 2
- Assessed value
- $4,680,900
- Landmark / historic district
- No
HPD registration #409616, last renewed Oct 8, 2025.
Questions about 72-24 Kissena Boulevard
Who owns 72-24 Kissena Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Kew Gardens Hills, LLC.
Does 72-24 Kissena Boulevard have violations?
Yes. NYC HPD has recorded 915 housing violations at this property.
Is 72-24 Kissena Boulevard rent stabilized?
NYC Department of Finance tax bills listed 119 rent-stabilized units here in 2024 (about 100% of its 119 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 72-24 Kissena Boulevard built?
City records list 1950 as the year it was built.
How many apartments are in 72-24 Kissena Boulevard?
It has 119 residential units and 120 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.