99-32 66 Road
Queens, NY 11374BBL 4-02118-7501Map
Owner of record: Unavailable Owner
99-32 66 Road is a condominium built in 1952 in Queens, 11374. It has 483 residential units across 12 floors. The owner of record is Unavailable Owner. HPD has recorded 637 housing violations here, most recently on April 29, 2026. 44 of the 50 most recent violations are still open. City tax records listed 50 rent-stabilized apartments here in 2024.
- HPD violations
- 637
- DOB violations
- 77
- ECB violations
- 28
- HPD complaints
- 1,433
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 637
- BHazardous
Refit doors in the bathroom located at apt 7d, 7th story, 1st apartment from west at north
Apr 29, 2026 · Apt 7D
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at bathtub in the bathroom located at apt 7d, 7th story, 1st apartment from west at north
Apr 29, 2026 · Apt 7D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 7d, 7th story, 1st apartment from west at north
Apr 29, 2026 · Apt 7D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 7d, 7th story, 1st apartment from west at north
Apr 29, 2026 · Apt 7D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets sink base in the bathroom located at apt 7d, 7th story, 1st apartment from west at north
Apr 29, 2026 · Apt 7D
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet . in the bathroom located at apt 7d, 7th story, 1st apartment from west at north
Apr 29, 2026 · Apt 7D
Open — Nov sent out - BHazardous
Replace the broken or defective sink basin in the bathroom located at apt 7d, 7th story, 1st apartment from west at north
Apr 29, 2026 · Apt 7D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lock assembly in the entrance located at apt 7d, 7th story, 1st apartment from west at north
Apr 29, 2026 · Apt 7D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balanced of lower sash window at north wall in the 1st room from north located at apt 7d, 7th story, 1st apartment from west at north
Apr 29, 2026 · Apt 7D
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at through-out at building front yard
Apr 22, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9l, 9th story, 1st apartment from south at west
Apr 15, 2026 · Apt 9L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance door at compactor closet at public hall, 7th story
Feb 25, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at fire stairs door at public hall, 5th story, section ''g-p''
Jan 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire stairs door at public hall, 5th story, section ''g-p''
Jan 16, 2026
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective ceramic tiles at south wall in the bathroom located at apt 5g, 5th story, 4th apartment from north at east , section ''g-p''
Jan 16, 2026 · Apt 5G
Open — Nov sent out - ANon-hazardous
Repair leaky water closet flush pipe connection ... in the bathroom located at apt 5g, 5th story, 4th apartment from north at east , section ''g-p''
Jan 16, 2026 · Apt 5G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5g, 5th story, 4th apartment from north at east , section ''g-p''
Jan 16, 2026 · Apt 5G
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair or replace the broken or defective electric fixtures at ceiling in the kitchen located at apt 5g, 5th story, 4th apartment from north at east , section ''g-p''
Jan 16, 2026 · Apt 5G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 5g, 5th story, 4th apartment from north at east , section ''g-p''
Jan 16, 2026 · Apt 5G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood tread 5th to 11th from bottom up in the private hallway located at apt 5g, 5th story, 4th apartment from north at east , section ''g-p''
Jan 16, 2026 · Apt 5G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9l, 9th story, 1st apartment from west at north , section ''g-p''
Dec 4, 2025 · Apt 9L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9l, 9th story, 1st apartment from west at north , section ''g-p''
Dec 4, 2025 · Apt 9L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood riser 6th, 8th, 9th and 13th tread from bottom at stairs to upper level in the private hallway located at apt 5g, 5th story, 4th apartment from north at east , section ''g-p''
Dec 3, 2025 · Apt 5G
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchen located at apt 5g, 5th story, 4th apartment from north at east , section ''g-p''
Dec 3, 2025 · Apt 5G
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of broken glass mirror at south wall at basement entrance story
Nov 29, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to compactor room (labeled as lobby) at basement
Nov 22, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at west fire stair exit (labeled as b) at basement
Nov 22, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame fire stair exit at east (labeled as a) at basement
Nov 22, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 11l, 11th story, 1st apartment from west at north , section ''g-p''
Nov 22, 2025 · Apt 11L
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9l, 9th story, 1st apartment from west at north
Nov 4, 2025 · Apt 9L
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Nov 4, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 11l, 11th story, 1st apartment from west at north
Nov 4, 2025 · Apt 11L
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5g, 5th story, 4th apartment from west at north
Oct 29, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Properly secure the loose wood panel at risers on 6th, 7th, 8th and 11th treads from bottom of stairs between lower and upper levels in the private hallway located at apt 5g, 5th story, 4th apartment from west at north
Oct 29, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Replace with new the missing wood panel at risers on 1st, 2nd and 5th treads from bottom of stairs between lower and upper levels in the private hallway located at apt 5g, 5th story, 4th apartment from west at north
Oct 29, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west and north walls in the kitchen located at apt 5g, 5th story, 4th apartment from west at north
Oct 29, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 5g upper level, 5th story, 4th apartment from west at north
Oct 29, 2025 · Apt 5G
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at boiler room
Oct 20, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9l, 9th story, 1st apartment from west at north
Oct 20, 2025 · Apt 9L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash in the kitchen located at apt 5g, 5th story, 3rd apartment from east at south
Jun 11, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 5g, 5th story, 3rd apartment from east at south
Jun 11, 2025 · Apt 5G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5g, 5th story, 4th apartment from west at north
May 25, 2025 · Apt 5G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective ceramic tiles on floor in the kitchen located at apt 5g, 5th story, 4th apartment from west at north
May 25, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective broken marble on top of sink base cabinet in the kitchen located at apt 5g lower level, 5th story, 4th apartment from west at north
May 25, 2025 · Apt 5G
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 10, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5g, 5th story, 4th apartment from west at north
May 25, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5g, 5th story, 4th apartment from west at north
May 25, 2025 · Apt 5G
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet door at south wall at public hall, 5th story
May 25, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall at lower level in the 1st room from east located at apt 5g lower level, 5th story, 4th apartment from west at north
May 25, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 5g lower level, 5th story, 4th apartment from west at north
May 25, 2025 · Apt 5G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective from bottom, 3rd to 6th defective wood treads at staircase from lower to upper level in the private hallway located at apt 5g upper level, 5th story, 4th apartment from west at north
May 25, 2025 · Apt 5G
Open — Nov sent out
DOB building violations · 77
- Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 22, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2018
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 9, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 5, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 20, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2012
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 26, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 19, 2008
Dob violation - resolved
ECB violations · 28
- Class - 1
Car cease use class 1 door restrictor missing provide.
Aug 11, 2021 · Penalty $1,250
Resolve - Class - 2
Sec. 28-104.8.4.3 failure to post/provide tenant protection plan at the time of inspection. noted: premises is an occupied bldg w/ongoing work. the tenant protection plan was not posted as required & could not
May 24, 2018 · Penalty $625
Resolve - Class - 2
Sec. 28-104.8.4.3 failure to post/provide tenant protection plan at the time of inspection. noted: premises is an occupied bldg w/ongoing work. the tenant protection plan was not posted as required & could not
May 24, 2018 · Penalty $625
Resolve - Class - 2
Sec. 28-104.8.4.3 failure to post/provide tenant protection plan at the time of inspection. noted: premises is an occupied bldg w/ongoing work. the tenant protection by the contractor at the time of inspection.
May 24, 2018 · Penalty $625
Resolve - Class - 2
Bc3314.4.3 partial stop work order for suspended scaffold issued pursuant to 28-207.2 and posted at premises. installation reports. note: observed suspended scaffold in connection with outrigger beams being use
Sep 5, 2017
Resolve - Class - 2
Failure to provide approved/accepted plans at job site time of inspection work in progress under job #420467453 exp 6/27/12 note:at premisesgarage workers are engaged in installing temporary shoring for roof ga
May 24, 2012 · Penalty $250
Resolve - Class - 2
Licensed rigger failed to ensure scaffold workers met minimum requirements. no certificates of fitness available from scaffold workers. remedy: comply with code.
Jul 29, 2008
Resolve - Non-hazardous
83x10 83x10 restore to service so that a complete inspection can be done by this dept
May 13, 2008 · Penalty $350
Resolve - Hazardous
"stop all work".no designated forman at time of inspection.license rigger failed to ensure that the scaffold workers met minimum requirements.observed workers on scaffold w/o certificate of fitness.
Apr 18, 2008 · Penalty $1,200
Resolve - Hazardous
"stop all work".sidewalk shed w/out permit.sidewalk shed does not meet dob specifications.not using vandal proof light fixtures.failure to provide contractors signs.remedy:conform sidewalk shed to dob specifica
Apr 18, 2008 · Penalty $2,900
Resolve
Show 18 more ↓
- Non-hazardous
Failure to maintain roof of underground garage and failure to maintainunder ground garage roof parking area asphalt is broken and cracking walkways broken water ponding on roof underground garage numerous crac
May 20, 2005 · Penalty $2,500
Resolve - Non-hazardous
73x11-restore device to service so that a full inspection can be made by the dept.
Jul 6, 1999 · Penalty $2,500
Resolve - Non-hazardous
15i12,5i12,25l11,16h12,15m7,57o2,74o2,18a11,14i12. 15i-7 fl door closer broken seraping car. 5-skim on panel. 25-occasionally opens at high speed slams into stops. 16-lobby. 15m-no closer on lobby.
Jul 6, 1999 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain. defect is: cracks in roof of parking garage caus-ing leakage when it is raining. remedy: repair roof, make safe immedi-ately, maintain building.
Mar 16, 1999 · Penalty $800
Resolve - Non-hazardous
46b57o
Jan 23, 1998
Resolve - Non-hazardous
46b57o
Jan 23, 1998
Resolve - Non-hazardous
02l74i50y75am06m03i57o 02-alarm bell push button repair 74-smoke hole grating repair 75 a no five year test tag. 06 cap on car door missing, 03 roof emergency exit, damaged unsecure- repair 57-car top & pit cle
Jul 16, 1997
Resolve - Non-hazardous
50y03i75m03i57o74o 50 machine leaking, 03 return post damaged 75- five year test 03 emergency roof exit damaged, unsecure 57-clean car top & pit. 74-motor room dirty, oil, clean fluid, rags, parts not property
Jul 16, 1997
Resolve - Hazardous
While using a two point suspension scaffold no danger signs operation of a 2pt suspension scaffold in an unsafe manner. broken scaffold platform no side walk shed. (replaceng bricks) on 13 story building
Mar 19, 1997 · Penalty $7,000
Resolve - Non-hazardous
73x.restore elector to service so that a complete inspection car be made.
Jul 22, 1995
Resolve - Non-hazardous
Work without permits. work noted: replaced masonry parapet wall at entire perimeter of building at roof. replaced entire real wall of water tower at roof. remedy: stop all work except to make site safe-
Apr 24, 1995
Resolve - Non-hazardous
Failure to obtain a permit: sidewalk shed permit# 400443980-01 expir-ed 3-30-95. no renewal as of 4-24-95. remedy: obtain permits.
Apr 24, 1995
Resolve - Non-hazardous
Failure to provide contractors sign: sidewalk shedhas no contractors sign or department of buildings emergency sign. remedy: provide con-tractors & building department emergency signs.
Apr 24, 1995
Resolve - Non-hazardous
20l. 20 lobby.
Dec 2, 1994
Resolve - Non-hazardous
21l,54l
Apr 19, 1994
Resolve - Non-hazardous
02l,50l,57o.
Dec 17, 1993
Resolve - Non-hazardous
Work without a permit: work noted: studio apartment #7h combined with walk up apartment #7j by removing dividing wall creating one duplex apartment! note: stop all work remedy: obtain permit if feasible or re
Jul 16, 1993 · Penalty $350
Resolve - Non-hazardous
Work without a permit. work noted: closed interior existing door at m line apartment, also u,w,k,t,and n on all floors, lobby entrances changed without approval plan. remedy:stop all work obtain a permit.
Nov 5, 1992 · Penalty $350
Resolve
Complaints
- Heat/hot water
Entire building
Apr 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 22, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 28, 2026 · Apt 9L
Close - Unsanitary condition
Pests
Mar 28, 2026 · Apt 9L
Close - Heat/hot water
Apartment only
Mar 24, 2026 · Apt 9L
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt 7V
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 9L
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Feb 1, 2026 · Apt 5B
Close
Show 40 more ↓
- Flooring/stairs
Floor
Jan 28, 2026 · Apt 5G
Close - Paint/plaster
Wall
Jan 28, 2026 · Apt 5G
Close - Heat/hot water
Apartment only
Jan 15, 2026 · Apt 11L
Close - Door/window
Door
Jan 12, 2026 · Apt 7D
Close - Door/window
Door
Jan 12, 2026 · Apt 7D
Close - Door/window
Window frame
Jan 12, 2026 · Apt 7D
Close - Plumbing
Basin/sink
Jan 12, 2026 · Apt 7D
Close - Safety
Carbon monoxide detector
Jan 12, 2026 · Apt 7D
Close - Appliance
Refrigerator
Jan 12, 2026 · Apt 7D
Close - Plumbing
Bathtub/shower
Jan 12, 2026 · Apt 7D
Close - Electric
Outlet/switch
Jan 12, 2026 · Apt 7D
Close - Plumbing
Basin/sink
Jan 12, 2026 · Apt 7D
Close - Plumbing
Toilet
Jan 12, 2026 · Apt 7D
Close - Paint/plaster
Wall
Dec 30, 2025 · Apt 5G
Close - Paint/plaster
Wall
Dec 30, 2025 · Apt 5G
Close - Flooring/stairs
Floor
Dec 30, 2025 · Apt 5G
Close - Heat/hot water
Apartment only
Dec 12, 2025 · Apt 9L
Close - Unsanitary condition
Pests
Dec 6, 2025 · Apt 9L
Close - Unsanitary condition
Pests
Dec 6, 2025 · Apt 9L
Close - Heat/hot water
Apartment only
Dec 4, 2025 · Apt 11L
Close - Paint/plaster
Wall
Dec 3, 2025 · Apt 5G
Close - Flooring/stairs
Floor
Dec 3, 2025 · Apt 5G
Close - Heat/hot water
Apartment only
Dec 2, 2025 · Apt 9L
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 24, 2025 · Apt 9L
Close - Heat/hot water
Apartment only
Nov 24, 2025 · Apt 9L
Close - Heat/hot water
Entire building
Nov 24, 2025 · Apt 9L
Close - Heat/hot water
Entire building
Nov 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 19, 2025 · Apt 11L
Close - Heat/hot water
Apartment only
Nov 16, 2025 · Apt 9L
Close - Heat/hot water
Apartment only
Nov 16, 2025 · Apt 11L
Close - Heat/hot water
Apartment only
Nov 10, 2025 · Apt 11L
Close - General
Cabinet
Nov 10, 2025 · Apt 5G
Close - Heat/hot water
Apartment only
Nov 6, 2025 · Apt 9L
Close - Heat/hot water
Apartment only
Nov 6, 2025 · Apt 9L
Close - Heat/hot water
Apartment only
Nov 4, 2025 · Apt 9L
Close - Heat/hot water
Entire building
Nov 2, 2025 · Apt 9L
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt 9L
Close - Heat/hot water
Apartment only
Oct 29, 2025 · Apt 9L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 1952
- Floors
- 12
- Residential units
- 483
- Building area
- 481,406 ft²
- Lot area
- 109,360 ft²
- Zoning
- R7-1
- Community board
- 406
- Council district
- 29
- Block / lot
- 2118 / 7501
- Assessed value
- $17,989,200
- Landmark / historic district
- No
HPD registration #405575, last renewed Jul 14, 2026.
Questions about 99-32 66 Road
Who owns 99-32 66 Road?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 99-32 66 Road have violations?
Yes. NYC HPD has recorded 637 housing violations at this property.
Is 99-32 66 Road rent stabilized?
NYC Department of Finance tax bills listed 50 rent-stabilized units here in 2024 (about 10% of its 483 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 99-32 66 Road built?
City records list 1952 as the year it was built.
How many apartments are in 99-32 66 Road?
It has 483 residential units and 485 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.