99-19 66 Avenue
Queens, NY 11374BBL 4-02117-0001Map
Owner of record: 99-58 66th Ave LLC
99-19 66 Avenue is an elevator apartment building built in 1939 in Queens, 11374. It has 310 residential units across 6 floors. The owner of record is 99-58 66th Ave LLC. HPD has recorded 511 housing violations here, most recently on October 13, 2026. 48 of the 50 most recent violations are still open. City tax records listed 295 rent-stabilized apartments here in 2024.
- HPD violations
- 511
- DOB violations
- 143
- ECB violations
- 55
- HPD complaints
- 837
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 511
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 6f, 6th story, 1st apartment from north at east
Oct 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 6f, 6th story, 1st apartment from north at east
Oct 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak the ceiling in the private hallway located at apt 6f, 6th story, 1st apartment from north at east
Oct 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color te ceiling in the private hallway located at apt 6f, 6th story, 1st apartment from north at east
Oct 13, 2026 · Apt 6F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from north at east wall door in the 2nd room from east at north located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the foyer located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall, 1st window frame from north at east wall in the 3rd room from east at south located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from east at south wall in the 2nd room from east at south located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Certification postponment granted - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at north located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the 3rd room from east at south located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the in the 2nd room from east at south located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door frame in the 2nd room from east at north located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from north at east wall in the foyer located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective defective hinges in the entrance located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - BHazardous
Repair the broken or defective connection at wasteline in the bathroom located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 5 in the entire apartment located at apt 4d, 4th story, 1st apartment from south at west
Aug 22, 2026 · Apt 4D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6f, 6th story, 2nd apartment from north at east
Aug 20, 2026 · Apt 6F
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the 3rd room from east, the kitchen , the 1st room from east at south, the 1st room from east at north located at apt 6f, 6th story, 2nd apartment from north at east
Aug 20, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at in the entrance located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the 3rd room from east located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 3rd room from east located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood base sink cabinet at north wall in the kitchen located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and east wall in the 3rd room from east located at apt 2d, 2nd story, 1st apartment from west at north
Aug 11, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window frame sill at east wall in the 2nd room from north located at apt 3f, 3rd story, 1st apartment from east at south
Jun 1, 2026 · Apt 3F
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at center located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at center located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from east at center located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective inner glass pane, upper sash at 1st window from south at west wall. in the 2nd room from east at north located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls, ceiling and trim in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at center, the 2nd bathroom , the 1st bathroom , the 1st room from east at south, the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 1a, 1st story, 1st apartment from east at south
May 29, 2026 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at public hall, 3rd story, section ''99-19''
May 28, 2026
Open — Nov sent out - BHazardous
Abate the nuisance consisting of pests. evidence of moths in the entire apartment located at apt 3f, 3rd story, 2nd apartment from east at south , section ''99-19''
May 28, 2026 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
May 21, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
May 21, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
May 21, 2026 · Apt 5B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 5b, 5th story, 1st apartment from south at west
May 21, 2026 · Apt 5B
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak ceiling in the bathroom located at apt 5b, 5th story, 1st apartment from south at west
May 21, 2026 · Apt 5B
Open — Nov sent out
DOB building violations · 143
- Construction other optional
Noted at 1 story parking garage, horizontal cracks & step cracks on exp#1 & 4 exterior masonry walls. at interior spalling & missing large sections of concrete at ceiling slab underside, exposing wire mesh. cracked & missing concrete along horizontal beams & vertical columns, exposing steel & rebar. vertical cracks in masonry wall by spot #6&9.
Jun 12, 2025
Dob violation - active - Construction other optional
Ewo observed cracked loose concrete & inadequate shoring protetion casing an immediate hazard.remedy:to retain a nys rdp to direct/superv the immediate installation of safty meas at insert area be safegaurd & protect shoring.work to be undr f/t superv of nys rdp to provide daily reports to [email protected]
May 22, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2018
Dob violation - resolved
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 8, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Jan 18, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 18, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 18, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 18, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 18, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 18, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 18, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 18, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 18, 2017
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Aug 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 11, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 26, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 25, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 6, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2012
Dob violation - resolved
ECB violations · 55
- Class - 1
Temporary shoring installed in garage under application # q01223339-i1-gc is in state of disrepair. northern corner of garage section of temp. shoring. five screw columns have become displaced and fell out from
Jul 2, 2025 · Penalty $2,500
Resolve - Class - 1
Parking garage in disrepair. step cracks at corner of exp#1&4 and at garage main entrance. horizontal cracks along exp#1 window lintels. at interior spalling & missing sections of concrete at ceiling slab expos
Jun 12, 2025 · Penalty $5,000
Active - Class - 1
Failure to safeguard-parking structure. notes: at the time of inspection on an active parking structure consisting of 1 level p. s. where the qpsi had filed an unsafe-ps-q0004328. observed:-cracked and loose an
May 22, 2025 · Penalty $25,000
Active - Class - 1
Failure to maintain building in a code compliant manner. at time of inspection observed vertical and step cracks on masonry facade of garage. at interior of garage observed cracks, chipped paint, horizontal and
Apr 22, 2025 · Penalty $2,500
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0004328 by the august 1, 2024 deadline. to date, the department
Oct 1, 2024 · Penalty $2,500
Active - Class - 2
Bc3314.3.2 design drawings for c-hook. drawing are to be on site at time of inspection. note: at time of inspection i observed suspended scaffold on c-hook installed on exp3 with no design drawings for c-hoo
Oct 30, 2018 · Penalty $625
Resolve - Class - 2
Bc 3314.3.2 design drawings for c-hook. drawings are to be on site attime of inspection. note: at time of inspection i observed suspended scaffold on c-hook in use on exp1 with no design drawing for c-hook
Oct 30, 2018 · Penalty $625
Resolve - Class - 2
No storage on shed. pedestrian proteciton does not meet code specifications. storage not allowed unless permit state designated area. note: at time of inspection i observed shed in place on exp1 with storage at
Oct 30, 2018
Resolve - Class - 2
Shed githt to facade. pedestrian protection does not meet code specifications. platform need to be gith to facade. note: at time of inspec tion i observed shed in place on exp1 with the installed netting to pr
Oct 30, 2018
Resolve - Class - 1
Work without a permit.observed 4 workers on make shift platform and c hook suspended scaffold,removing old lentals and bricks and installing new lentals and bricks on a 6 sty building upon request for permit no
Oct 10, 2018 · Penalty $1,600
Resolve
Show 40 more ↓
- Class - 2
Responsibilty for safety at active construction site observed 4 workers 2 on suspended c hook scaffold and 2 make shift platform sitting on top of fire escape top rail no guard rails in place 2 workers were als
Oct 10, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to safeguard public property.4 workers doing facade perimeter work, 2 on ac hook suspended scaffold and 2 on a make shift platform on top of fire escape railing workers were replacing bricks and lentals
Oct 10, 2018 · Penalty $10,000
Resolve - Class - 2
Removal of safety measure such as sidewalk sheds w/o dept approval. at the time of inspection building facade was still designated as un safe. the amended facade report. received on 04-18-2018 had not been
Apr 24, 2018 · Penalty $625
Resolve - Class - 2
6a,34b,50a-b. (50)water pipe leaking over burner. (50a)#1 condensate pump leaking. (50b)mixing valve is leaking.
Mar 6, 2018 · Penalty $500
Resolve - Class - 2
Pedestrian protection does not meet code specification.note:observed sidewalk shed vertival members(parapet wall)are place at less than 18"away from the face of the curblinekthat does not meet code specificatio
Jan 23, 2018 · Penalty $800
Resolve - Class - 1
Failure to take provide safety measure such as sidewalk sheds,fence,etc where require to protect and secure public safety from documented "unsafe"facade as per 1rcny-103-04.facade technical report file "unsafe"
Jul 27, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to provide safety measures or inadequate safety measure such as sidewalk sheds fence,etc.where required to protect and secure publicsafety from documented"unsafe"facade as per 1rcny 103-04.facade techni
Jul 27, 2017 · Penalty $2,400
Resolve - Class - 1
Failure to provide safety measure such as sidewalk sheds,netting,etc.where require to-protect and secure public safety from documented "unsafe"facade as per 1rcny-103-04.facade technical report file "unsafe by
Jul 27, 2017 · Penalty $2,400
Resolve - Class - 2
16e1,67x10,70o2,71x11. (16e)hoist door on the 6th flr rubbing to interlock. (67x)phone is not operative. (70o)clean pit. (71x)replace pit light.
Jul 25, 2017
Resolve - Class - 1
Failure to provide safety measure such as sidewalks sheds,fence,etc where reqd to protect and secure public safety from documented"unsafe'facade as per 1rcny-103.04 facade.technical report file "unsafe" by pe/r
Jul 25, 2017 · Penalty $2,400
Resolve - Class - 1
02x10,5l10 02x10: phone inoperative. 05l10: door zone restrictor inoperative. 70002: dirty pit
Oct 14, 2016 · Penalty $1,000
Resolve - Class - 1
16b10 pulling 4th flr hoistway door cause elevator stop in flight.respfiled a certificate of correction on july 25,2013 for nov #38227624l.upon inspection found that the condition which respondent described as
Aug 19, 2013
Resolve - Class - 2
16b10 - pulling 4th floor hoistway door cause elevator stop in flight.
Aug 19, 2013 · Penalty $250
Resolve - Class - 2
16b10 pulling 4th flr hoistway door cause elevator stop in flight.respfiled a certificate of correction on july 25,2013 for nov #38227624l.upon inspection found that the condition which respondent described as
Aug 19, 2013
Resolve - Class - 1
16b10 pulling 4th flr hoistway door cause elevator stop in flight.respfiled a certificate of correction on july 25,2013 for nov #38227624l.upon inspection found that the condition which respondent described as
Aug 19, 2013
Resolve - Class - 2
40i11,40q03,70o02. 40i11-repair broken glass in motor room window; 40q03-missing cover for electrical (ac) junction box.
Jun 19, 2013
Resolve - Class - 2
67x10,70o02,16b10. 67x10-emergency phone inoperative; 16b10-pulling 4th floor hoistway door cause elevator stop in flight.
Jun 19, 2013
Resolve - Class - 2
02x10,67m07,42n11,100b07,29q03,24x10. 02x10-alarm bell inoperative; 67m07-provide emergency phone; 42n11-bypassed fused on the controller;100b07-21'toe guard; 29q03-provide door operator cover; 24x10-5th flr
Jun 19, 2013
Resolve - Class - 2
67x10,21b01,60x10,70o02. 67x- repair emergency phone. 21b- pulling 3rd,4th & 5th flr door cause elevator stops in flight.
Feb 27, 2013
Resolve - Class - 2
02x10,03m07,03-m-07.capacity plate.
Sep 19, 2012
Resolve - Class - 2
46x10,100x10. 46x- governor overspeed switch cease use. 100x- rope gripper jumped cease use.
Apr 19, 2012 · Penalty $250
Resolve - Class - 2
08v01,03x10,72m07,26d06.(03x10)in car emergency communication.(72m07)provide pit stop switch as per appendix k chap k3.
Mar 27, 2012
Resolve - Class - 2
98bb05,99m07,69m07,70o02.
Oct 29, 2010
Resolve - Class - 2
98bb05,99m07,29q03,05i11,70o02. 29q3- provide door operator cover. 05i11- replace damaged vision panel glass.
Oct 29, 2010
Resolve - Class - 2
99bb05. 99bb05- category one expired 6/10.
Jul 21, 2010 · Penalty $250
Resolve - Class - 2
10m11.08v1.10 rear
Jul 31, 2009
Resolve - Non-hazardous
08v01,55y13,59q03,85m05,39m07,25d06,38x10,38q03,51m07,10h11,16h10,71x10,12q03,64q03. 39-m cover's missing. 38-x. lite 38-q lite. 51-m anti spin device. 16-h bsmt door pivot. 71-x lite repair guard.
Sep 27, 2007
Resolve - Non-hazardous
39q03,51m07,51o02,84m07,38x10,38q03,71m07,64q03,51m07,67o02,68o02,65l10.39q-light.51m-cable guards.84m-fire extinguisher.38x-light.38q-light.71m-light & guard.51m-anti spin device cwt.65l-switch taped in run po
Sep 19, 2007 · Penalty $350
Resolve - Hazardous
34a
May 16, 2006
Resolve - Non-hazardous
34a
Nov 17, 2004
Resolve - Non-hazardous
B4a bq9 36 bq9. no boiler work permit accually issued and (not on site) work was in progress at time of arrival. 50% of boiler done.
Aug 27, 2004 · Penalty $850
Resolve - Non-hazardous
B4a bq9 36 bq9. no boiler work permit accually issued and (not on site) work was in progress at time of arrival. 75% of boiler done.
Aug 27, 2004 · Penalty $850
Resolve - Non-hazardous
75u,08v,35m,35d. perform and file 5 year test, no metal container withcover for oily rags, smoke hole grating in motor room.
Jan 11, 1999
Resolve - Non-hazardous
75u,46o,50o,50y,74m,74d. perform and file 5 year test, no metal container in motor room with cover for oily and greast rags, secure smoke grating in motor room.
Jan 11, 1999
Resolve - Non-hazardous
75u,50y,73o,46o,74m. perform and file 5 year test, no metal container in motor room with cover for oily and greasy rags
Jan 8, 1999
Resolve - Non-hazardous
50f,73# 73 perform 5year test.file elv3 form.properly test devic.
Oct 6, 1994
Resolve - Non-hazardous
14l,21l,74h. 74 car flooring
Apr 19, 1994
Resolve - Non-hazardous
14l,21l,35p
Jan 14, 1994 · Penalty $100
Resolve - Non-hazardous
08v,03l,21x. 03l under car light. 21x 6th floor indicator.
Dec 13, 1993
Resolve - Non-hazardous
18l, 18. 2nd, 4th, 5th, and 6th floor.
Jun 26, 1992
Resolve
Complaints
- Water leak
Heavy flow
Oct 6, 2026 · Apt 6F
Close - Paint/plaster
Ceiling
Oct 6, 2026 · Apt 6F
Close - Paint/plaster
Wall
Oct 6, 2026 · Apt 6F
Close - Water leak
Damp spot
Oct 1, 2026 · Apt APT1F
Open - Water leak
Slow leak
Oct 1, 2026 · Apt APT1F
Open - Water leak
Slow leak
Aug 28, 2026 · Apt SUITE1
Open - General
Cabinet
Aug 14, 2026 · Apt 4D
Close - Water leak
Slow leak
Aug 14, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Aug 14, 2026 · Apt 4D
Close - Flooring/stairs
Floor
Aug 14, 2026 · Apt 4D
Close
Show 40 more ↓
- Paint/plaster
Wall
Aug 14, 2026 · Apt 4D
Close - Unsanitary condition
Pests
Aug 14, 2026 · Apt 4D
Close - Plumbing
Basin/sink
Aug 14, 2026 · Apt 4D
Close - Paint/plaster
Wall
Aug 12, 2026 · Apt 6F
Close - Flooring/stairs
Floor
Aug 12, 2026 · Apt 6F
Close - General
Cabinet
Aug 12, 2026 · Apt 6F
Close - Paint/plaster
Wall
Aug 12, 2026 · Apt 6F
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 6F
Close - Unsanitary condition
Mold
Aug 12, 2026 · Apt 6F
Close - Appliance
Electric/gas range
Aug 12, 2026 · Apt 6F
Close - Unsanitary condition
Pests
Aug 12, 2026 · Apt 6F
Close - Appliance
Refrigerator
Aug 12, 2026 · Apt 6F
Close - Paint/plaster
Wall
Aug 5, 2026 · Apt 2D
Close - Unsanitary condition
Pests
Aug 5, 2026 · Apt 2D
Close - Paint/plaster
Ceiling
Aug 5, 2026 · Apt 2D
Close - Unsanitary condition
Pests
Jul 16, 2026 · Apt 1E
Close - Paint/plaster
Window/frame
May 26, 2026 · Apt 3F
Close - Paint/plaster
Ceiling
May 26, 2026 · Apt 1A
Close - Unsanitary condition
Mold
May 26, 2026 · Apt 1A
Close - Unsanitary condition
Pests
May 18, 2026 · Apt 3F
Close - Unsanitary condition
Pests
May 18, 2026 · Apt 3F
Close - Heat/hot water
Entire building
Apr 26, 2026 · Apt 3C
Close - Water leak
Slow leak
Apr 21, 2026 · Apt 5D
Close - Unsanitary condition
Mold
Apr 21, 2026 · Apt 5D
Close - Paint/plaster
Wall
Apr 21, 2026 · Apt 5D
Close - Heat/hot water
Entire building
Apr 19, 2026 · Apt BLDG
Close - Door/window
Door frame
Apr 7, 2026 · Apt 3F
Close - Unsanitary condition
Mold
Apr 7, 2026 · Apt 3F
Close - Paint/plaster
Wall
Apr 7, 2026 · Apt 3F
Close - Unsanitary condition
Garbage/recycling storage
Apr 2, 2026 · Apt BLDG
Close - Electric
Outlet/switch
Mar 29, 2026 · Apt 2G
Close - Heat/hot water
Entire building
Mar 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Mar 19, 2026 · Apt 6B
Close - Paint/plaster
Ceiling
Mar 19, 2026 · Apt 6B
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 13, 2026 · Apt 3C
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1939
- Floors
- 6
- Residential units
- 310
- Building area
- 338,016 ft²
- Lot area
- 151,776 ft²
- Zoning
- R7-1
- Community board
- 406
- Council district
- 29
- Block / lot
- 2117 / 1
- Assessed value
- $10,980,000
- Landmark / historic district
- No
HPD registration #405626, last renewed Sep 3, 2025.
Questions about 99-19 66 Avenue
Who owns 99-19 66 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 99-58 66th Ave LLC.
Does 99-19 66 Avenue have violations?
Yes. NYC HPD has recorded 511 housing violations at this property.
Is 99-19 66 Avenue rent stabilized?
NYC Department of Finance tax bills listed 295 rent-stabilized units here in 2024 (about 95% of its 310 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 99-19 66 Avenue built?
City records list 1939 as the year it was built.
How many apartments are in 99-19 66 Avenue?
It has 310 residential units and 312 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.