roofy

41-42 24 Street

Queens, NY 11101BBL 4-00413-0002Map

Owner of record: 24th Street Lic LLC

41-42 24 Street is an elevator apartment building built in 2013 in Queens, 11101. It has 421 residential units across 21 floors. The owner of record is 24th Street Lic LLC. HPD has recorded 11 housing violations here, most recently on February 3, 2026. City tax records listed 421 rent-stabilized apartments here in 2024.

HPD violations
11
DOB violations
33
ECB violations
44
HPD complaints
5

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Feb 3, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
421
About 100% of the building's 421 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 11

  • C

    Remove the illegal fastening double cylinder lock installed on vestibule door at public hall, 1st story

    Feb 3, 2026

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 17, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jun 4, 2020

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing from the wall at public hall, 1st story

    Jun 4, 2020

    Closed — Violation closed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at 1st story public hall and outside door of the boiler room at cellar

    Jun 4, 2020

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 4, 2020

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jun 4, 2020

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Jun 4, 2020

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Jun 4, 2020

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing from the wall at public hall, 1st story

    Jun 4, 2020

    Closed — Violation closed
Show 1 more ↓
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 6, 2019

    Closed — Violation dismissed

DOB building violations · 33

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 22, 2025

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 13, 2024

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
Show 23 more ↓
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 18, 2017

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2014 inspection/test

    Jun 10, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 13, 2014

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 4, 2013

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Oct 7, 2009

    Dob violation - active
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 27, 2009

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2008

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 11, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 29, 2007

    Vw*-violation - work w/o permit dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 2, 2007

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Oct 1, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2005

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Nov 19, 2004

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    4f392

    Jan 16, 2003

    Dob violation - resolved
  • Boiler boiler optional

    B-boiler boiler optional

    Aug 23, 1995

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 6, 1992

    Vp*-violation unserved ecb- dismissed

ECB violations · 44

  • Class - 2

    Failure to certify correction for violation for 35681368m, file a certificate of correction

    Jul 7, 2025 · Penalty $1,250

    Active
  • Class - 2

    No facade work at time of inspection. observed on 10th floor terrace where suspended scaffold is grounded, temporary weather protection significantly loose exposing areas of missing brick. referencing 2022 buil

    Dec 31, 2024

    Resolve
  • Class - 1

    Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#q0003023 by the august 1,2024 deadline.to date,the department has

    Oct 1, 2024 · Penalty $2,500

    Active
  • Class - 2

    Upon inspection of a non-active 20 story facade alt construction site i observed a sidewalk shed installed at exposures, 1,2&3 with no sidewalk shed parapet info panel provided at expos 3 contrary to bc 3301.9.

    Sep 17, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    Pedestrian protection (sidewalk shed) installed at exposures 1,2&3 contrary to codes 3307.6.6.4-no protection from displacement/high visibility markings at expos 3 gar. a 2 inch vertical beam used at expos 3. 3

    Sep 17, 2024 · Penalty $2,400

    Resolve
  • Class - 2

    3309.11 protection of trees. upon inspection of a non-active 20 story facade alt construction site i observed approx. 12 trees at exposures 1,2&3 with no tree protection provided to prevent construction damage.

    Sep 17, 2024 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 907.2.8 failure to provide the required class j fire alarm system for transient/use at apartment.rem:discontinue illegal occupancy.

    Sep 11, 2024 · Penalty $2,500

    Active
  • Class - 2

    Permanent dwelling used/converted for other than permanent residentialpurposes.dept of buildings records indicates premises to be legally approved as a class a multiple dwelling.noted at time of inspection apar

    Sep 11, 2024

    Resolve
  • Class - 1

    Non current carrying electrical conductive material is not grounded. sidewalk shed is metal and could be energezed. rmdy: comply with ec code.

    Dec 12, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Unsafe unsuitable unapproved electrical equipment devices appliances materials or wiring in use. romex cable used in sidewalk shed.rmdy: comply with ec code.

    Dec 12, 2015 · Penalty $800

    Resolve
Show 34 more ↓
  • Class - 1

    Failure to have site safety manager on present as required. note: active jobsite observed delivery operations at 23 street. i asked for sitesafety manager,super could not locate safety manager for 15 mins. supe

    Oct 20, 2015 · Penalty $1,200

    Resolve
  • Class - 2

    28-105.12.2 posting of unlawful sign info pictorial representation business or advertising message or protective structure governed by 3301.9.@time of insp observed advertising sign affix to the bulkhead @roof

    Aug 22, 2015 · Penalty $4,000

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.at time of inspection observed active jobsite.at the 1stflr level observed members of the public walking through an active con

    May 26, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    Use of supported scaffold w/o a scaffold user certificate: at time of inspection observed active jobsite at the 10th flr level observed worker apprx 10'high on a supported scaffold. no guardrails no hard hat an

    May 26, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    3301.1.2 failure to comply with nyc fire code general no fire guard.@ time of insp.observed entire,jobsite operation provided fire guard after i observed work,then @ the 10th fl observed another hot work operat

    May 26, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to immediately notify the dept of an accident/incident at construciton site. at approx 6:50am on 2/9/15 worker was checking pressurized bottle to see what was in bottle as opening bottle contents explo

    Feb 10, 2015 · Penalty $2,500

    Resolve
  • Class - 2

    Sec. 3303.11 maintain means of egress. noticed at time of inspection on 16th & 18th floor concrete & block blocking means of egress active working floors. remedy: maintain means of egress as per code.

    Feb 10, 2015 · Penalty $400

    Resolve
  • Class - 1

    Sec. 3301.1.2 failure to comply w/nyc fire code. no fire watch noticedwelder on 18th fl wending no fire watch in area or below welder. remedy: provide fire watch as per code.

    Feb 10, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3303.1.2 service lines & conduit causing tripping hazards. noticed at time of inspection electrical cords on floor blocking egress & hallways causing tripping hazards thru-out bldg. remedy: comply w/code.

    Feb 10, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain housekeeping. noticed at time of inspection nb in progress noticed housekeeping thru-out entire bldg not maintain to code debri piles & workers walking & working on top of garbage. previous

    Feb 10, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant manner. noticed at time of inspection on 16,17,18th floors temporary lighting not working stairs & floors (dark) w/workers working on floors. remedy: maintain bldg in

    Feb 10, 2015 · Penalty $1,000

    Resolve
  • Class - 1

    Bc33083 verticdal netting not per cod,notice at time of inspection 21sy nb in progress inadequate vertial neeting holes and tails and no secrete on floors 11,14,15,17,18,19,20

    Nov 25, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements notices at time of inspection 21 story nb in progress.housekeeping through out entire bldg inadequate. rmdy: maintain adequate housekeep

    Nov 25, 2014 · Penalty $2,400

    Resolve
  • Class - 2

    Sec. 3307.6.5.2 underside light. note: sidewalk shed have been erectedat exp #2 (queens plz north) under permit #420928483-01-eq-sh. at sws driveway section a light fixture not provide (25 feet section) that

    Oct 21, 2014 · Penalty $2,400

    Resolve
  • Class - 2

    Sidewalk shed information panel. note: sidewalk shed have been erectedat exp #2 (queens plz north) sidewalk shed information panel not provided. remedy: comply w/code.

    Oct 21, 2014

    Resolve
  • Class - 2

    Superintendent concrete safety manager fail to maintain proper log book of embeded safety strap @ job site.@ time of insp active job nb#420605651 bldg complete to 17 stories.safety strap log book was not presen

    Aug 14, 2014 · Penalty $600

    Resolve
  • Class - 2

    3301.2,holes,opening not cover & constitute a hazard for debris falling to fls below.@ time of insp observed openings 2in to 8in not coveredaround mechanical(ducts)& plumbing risers;8 to 2 fl various location.h

    Jun 19, 2014 · Penalty $1,200

    Resolve
  • Class - 1

    Failure to perform successful hydrostatic pressure test of standpipe system. at time of inspection observed active jobsite 10thfl of bldg being formed. no hydrostatic test for standpipe once bldg reached 75ft s

    May 15, 2014 · Penalty $2,400

    Resolve
  • Class - 2

    Bc3310.6 designated site safety manager. failure to have site safety manager expires 2 a minimum of two week as required. upon inspection of site safety log site safety manager on pw-2 have not been signing

    Mar 1, 2014

    Resolve
  • Class - 1

    Bc3309-10. no protection for roof and mechanical vents. note active job site observed 2nd floor completely poured and () form work system installed with plywood deck of third flr w/o any roof protection install

    Mar 1, 2014 · Penalty $1,600

    Resolve
  • Class - 2

    Work does not conform to approved documents at time of inspection observed active job site, reinforced concrete. approved site safety plan shows high sidewalk shed to be installed. currently only partial shed

    Feb 8, 2014

    Resolve
  • Class - 1

    Work does not conform to the approved construction documents and/or amendments. plans do not show actual dept of underpinning approach pits are not being used exp 4 (in the) rear. also footing depths are not

    Sep 5, 2013 · Penalty $1,000

    Resolve
  • Class - 2

    Work w/o a permit - work noted 8ft ht fence (plywood) erected at exposure 1,2,4 approx 200 lr-ft. remedy: obtain/post permit.

    May 7, 2013

    Resolve
  • Class - 2

    Jobsite fence not constructed pursuant to subsection 8'high const'n wood fence defective twisted,out of plumb & leaning w/missing plywood board along queens plaza north/23 st & plywood has fallen unto sidewalk

    May 15, 2012 · Penalty $4,000

    Resolve
  • Class - 2

    Work w/o a permit.expired permit.premises under pcjob alt-2 402547812.exp.12-31-07.note @ time of inspection found construction fence erected @ site.permit#402615675-01-eq-fn expired 12-31-07.remedy:renew permi

    Oct 7, 2009 · Penalty $400

    Resolve
  • Hazardous

    Failure to safeguard public and property affected by construction operations. no shoring installed to protect/support adjoining property's exterior cinder block wall (load bearing) there are numerous holes and

    Oct 17, 2007

    Resolve
  • Hazardous

    Failure to safeguard public and property affected by construction operations no shoring installed to protect/support adjoing property's exterior cinder block wall (load bearing) there are numerous holes and

    Oct 17, 2007 · Penalty $1,000

    Resolve
  • Hazardous

    No fdny permit as per 27-4011,27-4063, or 27-4070 of the fire code, & cylinders not in steel cage. at time of inspection noted 6 cylinders throughout floors of structure.oxygen & acetylene cylinders are not

    Aug 15, 2007

    Resolve
  • Non-hazardous

    40 50 1981 fulton natl bd 36749 50 reverse the valves on the boiler bottom blowdown line.

    May 25, 2005 · Penalty $180

    Resolve
  • Non-hazardous

    11a/50.1983 fulton nat'l bo 42944.11a) add a slow opening valve after the quick ball valve on the bottom blow down line. 50)seal the flue pipe to chimney.

    Apr 25, 2005 · Penalty $180

    Resolve
  • Non-hazardous

    32a 50a 50b 50c 50d 1977 fulton natl bd 34125 32a exposed wire on pump. 50a reverse the valves on the bottom blowdown line. 50b. repair the damaged causing on the bottom left and right hand holes 50c. holes in

    Apr 25, 2005 · Penalty $180

    Resolve
  • Non-hazardous

    18a/18b/48a/48b/49 - 49 musst install a discharge pipe on safety value.

    Jul 10, 2000

    Resolve
  • Non-hazardous

    49 - 49 feed water value to boiler missing a shut off handle.site glass shut off value missing a handle safety value needs a discharge.

    Jul 10, 2000

    Resolve
  • Non-hazardous

    18a/18b/48a/48b/49 - 49)handhole sleves corroded, low water control as leaking gasket safety value needs a discharge pipe.

    Jul 10, 2000

    Resolve

Complaints

  • Heat/hot water

    Entire building

    May 3, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Dec 16, 2022 · Apt PREFER

    Close
  • Plumbing

    Water supply

    Jun 1, 2020 · Apt 220

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2014 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D6)
Year built
2013
Floors
21
Residential units
421
Building area
395,000 ft²
Lot area
41,628 ft²
Zoning
M1-5/R9
Community board
401
Council district
26
Block / lot
413 / 2
Assessed value
$50,616,000
Landmark / historic district
No

HPD registration #431811, last renewed Sep 5, 2025.

Questions about 41-42 24 Street

Who owns 41-42 24 Street?

The owner of record in NYC Department of City Planning PLUTO data is 24th Street Lic LLC.

Does 41-42 24 Street have violations?

Yes. NYC HPD has recorded 11 housing violations at this property.

Is 41-42 24 Street rent stabilized?

NYC Department of Finance tax bills listed 421 rent-stabilized units here in 2024 (about 100% of its 421 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 41-42 24 Street built?

City records list 2013 as the year it was built.

How many apartments are in 41-42 24 Street?

It has 421 residential units and 425 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.