roofy

41-27 23 Street

Queens, NY 11101BBL 4-00413-0012Map

Owner of record: Pinn Day Day LLC

41-27 23 Street is a mixed residential and retail building built in 1931 in Queens, 11101. It has 6 residential units across 3 floors. The owner of record is Pinn Day Day LLC. HPD has recorded 78 housing violations here, most recently on March 2, 2022. 2 of the 50 most recent violations are still open.

HPD violations
78
DOB violations
20
ECB violations
17
HPD complaints
90

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Mar 2, 2022

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 78

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Mar 2, 2022

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of lockable hasp with eye and key operated lock at the door to room with fire escape in the 4th room from east located at apt 2l, 2nd story, 1st apartment from west at north

    Nov 18, 2016 · Apt 2L

    Closed — Violation dismissed
  • C

    Remove the illegal fastening a key operated door knob lock at door obstructing egress to the fire escape in the 4th room from east located at apt 2l, 2nd story, 1st apartment from west at north

    Sep 6, 2016 · Apt 2L

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 19, 2015

    Closed — Violation closed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Apr 19, 2015

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story

    Apr 19, 2015

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 19, 2015

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story

    Apr 19, 2015

    Closed — Violation closed
  • B

    Replace with new the missing hand rail at stairs of front entrance to building

    Feb 11, 2015

    Closed — Violation closed
  • B

    Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2l, 2nd story, apartment at north

    Feb 11, 2015 · Apt 2L

    Closed — Violation closed
Show 40 more ↓
  • C

    Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 2l, 2nd story

    Feb 11, 2015 · Apt 2L

    Closed — Violation closed
  • B

    Provide an adequate supply of gas to the fixtures gas range in the kitchen located at apt 2l, 2nd story, apartment at north

    Dec 4, 2014 · Apt 2L

    Closed — Violation closed
  • B

    Properly repair the broken or defective inoperative bell/buzzer/intercom system from building entrance to, in the entire apartment located at apt 2l, 2nd story, apartment at north

    Dec 4, 2014 · Apt 2L

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department walls and ceiling at stair bulkhead at public hall, 3rd story

    Dec 6, 2010

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective walls and ceiling at stair bulkhead at public hall, 3rd story

    Dec 6, 2010

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east

    Dec 6, 2010 · Apt 2L

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story

    Mar 17, 2010

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls ceiling and trim in the entire apartment located at apt 2l, 2nd story

    Mar 17, 2010 · Apt 2L

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective plaster at west wall in the 1st room from north at west located at apt 2l, 2nd story

    Mar 17, 2010 · Apt 2L

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective plaster at ceiling and walls in the kitchen located at apt 2l, 2nd story

    Mar 17, 2010 · Apt 2L

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over kitchen located at apt 3r, 3rd story, 2nd apartment from north at east

    May 14, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceiling 3rd sty public hall

    May 14, 2008

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over 3rd sty public hall

    May 14, 2008

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    May 14, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    May 14, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    May 14, 2008 · Apt 3R

    Closed — Violation closed
  • C

    Remove the illegal fastening key operated double cylinder locking mechanism at front door entrance in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    May 14, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    May 14, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3r, 3rd story, 2nd apartment from north at east

    May 14, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over in the 3rd room from east located at apt 3r, 3rd story, 2nd apartment from north at east

    May 14, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Properly repair the broken or defective electrical outlet south wall located at apt 3r, 3rd story, 2nd apartment from north at east

    May 14, 2008 · Apt 3R

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... at walls and ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east

    Mar 23, 2008 · Apt 2L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east

    Mar 23, 2008 · Apt 2L

    Closed — Violation closed
  • C

    Replace with new the missing baluster at stair at public hall, 2nd story

    Dec 9, 2005

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the entire cellar

    Dec 9, 2005

    Closed — Violation closed
  • B

    Provide adequate lighting boiler room at cellar

    Dec 9, 2005

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department .. ceiling, east wall in the private hallway located at apt 3l, 3rd story, 1st apartment from north at east

    May 3, 2005 · Apt 3L

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2l, 2nd story

    May 3, 2005 · Apt 2L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east located at apt 3r, 3rd story, apartment at east

    Sep 4, 2003 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the kitchen located at apt 3r, 3rd story, apartment at east

    Sep 4, 2003 · Apt 3R

    Closed — Violation closed
  • C

    Remove the illegal fastening double cylinder key operated lock at door in the entrance located at apt 3r, 3rd story, apartment at east

    Sep 4, 2003 · Apt 3R

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets bathtub in the bathroom located at apt 3l, 3rd story, apartment at east

    Sep 4, 2003 · Apt 3L

    Closed — Violation closed
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at cellar south , b-room

    Apr 8, 2003

    Open — Not complied with
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at cellar north , b-room

    Apr 8, 2003

    Open — Not complied with
  • C

    M/d law abate the nuisance consisting of loose and disconnected chimney breaching at boiler at cellar rear

    Apr 8, 2003 · Apt 2-L

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of rain leader not sewer connected at rear yard

    Apr 8, 2003

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system boiler room locked at at cellar

    Nov 7, 2002

    Closed — Violation closed
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2l, 2nd story

    Aug 6, 2002 · Apt 2L

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of mold and mildew at ceiling in the bathroom located at apt 1l, 1st story, apartment at east

    Jun 25, 2002 · Apt 1L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the bathroom located at apt 1r, 1st story, apartment at east

    Jun 25, 2002 · Apt 1R

    Closed — Violation closed

DOB building violations · 20

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
Show 10 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 7, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 28, 1993

    Dob violation - dismissed
  • Construction other optional

    Al

    Dec 6, 1988

    Dob violation - dismissed

ECB violations · 17

  • Class - 1

    3309.10;inadequate roof protection installed.at time of inspection observed inadeuqate roof protetcion installed an property in conjunction with new building permit #421091936 the contsruction of a 9 story buil

    Mar 4, 2019 · Penalty $2,500

    Resolve
  • Hazardous

    Failure to maintain building defect noted: at cellar level rear exit hallway ceiling missing sheet rock approx: 10'-0 x 12'-0, and partiallyothers places (stairs ceiling from 1st flr to cellar) also observed 1

    Apr 22, 2008 · Penalty $800

    Resolve
  • Hazardous

    Failure to provide/maintain adequate egress and safe passageway to street on 6(fam) building m.d. #413764 noted: at rear, egress from fire escapes only enclosed rear yard with no access to street. "bilco" cella

    Apr 22, 2008 · Penalty $480

    Resolve
  • Non-hazardous

    Failure to maintain exterior bldg wall hazardous @ time of inspection @ exposure 3 the entire wall has deteriorated. stucco veneer has begunto fall of the brick exterior wall. remedy: maintain exterior bldg

    Mar 21, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    Exit passage or corridor: required width decreased by obstruction. @ time of inspection @ exposure 3 fire escape has been obstructed by a 4 inch pvc pipe used as a gutter. remedy: remove obstruction.

    Mar 21, 2008

    Resolve
  • Hazardous

    Occupancy is contary to that allowed by the certificate of occupancy or bldg dept records cellar use changed from storage and ordinary use to two apartments.partitions erected with kitchen and bathroom facilit

    Apr 8, 2003 · Penalty $2,500

    Resolve
  • Hazardous

    Occupancy is contrary to that allowed by the certificate of occupancy or building dept records cellar use changed from storage and ordinary use to apts with partitions erected with kitchen and bathroom faciliti

    Aug 22, 2001 · Penalty $2,500

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by the dept of buildings records:dept of building records indicated that residence is legally approved for occupancy as a 6 family dwelling, residence now altered for occupanc

    Jul 21, 2000 · Penalty $16,000

    Resolve
  • Hazardous

    Occupancy is contrary to that allowed by c of o or building departmentrecords. basement cellar changed from storage and ordinary use into two class "a" apartments. partitions erected with kitchen and bathroom

    Oct 4, 1999 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to maintain: defect: fire escape at rear of building is loose and deterioring. extending to all three floors plus roof. remedy: secure fire escape to exterior wall,repair and paint.

    Aug 28, 1998 · Penalty $180

    Resolve
Show 7 more ↓
  • Hazardous

    Failure to maintain defect is: fire escape at rear of premises in danger of collapse, fire escape attached to south/wall of premises. remedy; make safe immediately, obtain permits maintain.

    Aug 13, 1998 · Penalty $800

    Resolve
  • Non-hazardous

    Work without a permit. constructed a class a apt in cellar with full kitchen and bath bedroom with 2 beds 1 bed livingroom.

    May 6, 1998 · Penalty $2,500

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by building dept records indicate c-2 walk up 6 family to illegal 8 family at the time of inspection.

    May 6, 1998 · Penalty $2,500

    Resolve
  • Hazardous

    Exit door totoal obstruction. cellar level to 1st floor stairwell stairs blocked by construction debris exit door chained and padlocked.

    May 6, 1998 · Penalty $480

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by the c of o or bldg dept records.cellar changed from storage & ordinary use to 2 apts. partitions erected and kitchen & bath facilities have been installed.

    Oct 23, 1997

    Resolve
  • Hazardous

    Occupancy contrary to that allowed by the certificate of occupancy or building department records. cellar changed from storage & ordinary. use to two (2) apartments partitions erected and kitchen & bath facili

    Apr 11, 1997 · Penalty $1,000

    Resolve
  • Unknown

    Work without a permit work noted: fire damage 3 floors rear of house many floor beams burned out . remedy: stop work until approvals and permits are received from dept. of bldg.

    Jan 18, 1989 · Penalty $250

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Nov 7, 2022 · Apt 1L

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2016 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Nov 20, 2016 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2016 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Nov 12, 2016 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Nov 29, 2015 · Apt 2L

    Close
  • Appliance

    Electric/gas range

    Mar 9, 2015 · Apt 2L

    Close
  • Flooring/stairs

    Stairs

    Feb 10, 2015 · Apt 2L

    Close
  • Appliance

    Electric/gas range

    Feb 10, 2015 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Feb 10, 2015 · Apt 2L

    Close
Show 40 more ↓
  • Flooring/stairs

    Stairs

    Feb 7, 2015 · Apt 2L

    Close
  • General

    Cooking gas

    Feb 7, 2015 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Feb 7, 2015 · Apt 2L

    Close
  • General

    Cooking gas

    Feb 3, 2015 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2015 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2014 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Dec 1, 2014 · Apt 2L

    Close
  • Plumbing

    Water supply

    Dec 1, 2014 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Dec 1, 2014 · Apt 2L

    Close
  • Appliance

    Electric/gas range

    Nov 29, 2014 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Nov 29, 2014 · Apt 2L

    Close
  • Heating

    Heat related

    Mar 3, 2013 · Apt 2L

    Close
  • Appliance

    Refrigerator

    Jul 21, 2011 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Apr 1, 2010 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Apr 1, 2010 · Apt 2L

    Close
  • Plumbing

    Water-leaks

    Apr 1, 2010 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Apr 1, 2010 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    Apr 1, 2010 · Apt 2L

    Close
  • Heating

    Heat related

    Mar 12, 2010 · Apt 2L

    Close
  • Heating

    Heat related

    Feb 25, 2010 · Apt 2L

    Close
  • Heating

    Heat related

    Feb 15, 2010 · Apt 2L

    Close
  • General

    Locks

    Feb 10, 2010 · Apt 2L

    Close
  • Electric

    Lighting

    Feb 10, 2010 · Apt 2L

    Close
  • Heating

    Heat related

    Feb 10, 2010 · Apt 2L

    Close
  • Heating

    Heat related

    Oct 12, 2009 · Apt 2L

    Close
  • Heating

    Heat related

    Feb 21, 2009 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Feb 21, 2009 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    Feb 21, 2009 · Apt 2L

    Close
  • Plumbing

    Water-leaks

    Feb 21, 2009 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    Feb 21, 2009 · Apt 2L

    Close
  • Plumbing

    Water-leaks

    Feb 21, 2009 · Apt 2L

    Close
  • Heating

    Heat related

    Feb 7, 2009 · Apt 2L

    Close
  • Heating

    Heat related

    Jan 18, 2009 · Apt 2L

    Close
  • Heating

    Heat related

    Jan 11, 2009 · Apt 2L

    Close
  • Heating

    Heat related

    Dec 27, 2008 · Apt 2L

    Close
  • Heating

    Heat related

    Dec 11, 2008 · Apt 2L

    Close
  • Heating

    Heat related

    Dec 9, 2008 · Apt 2L

    Close
  • Plumbing

    Water-leaks

    May 1, 2008 · Apt 3R

    Close
  • Plumbing

    Water-leaks

    May 1, 2008 · Apt 3R

    Close
  • Heating

    Heat related

    Apr 21, 2008 · Apt 2L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Mixed residential and retail building (S5)
Year built
1931
Floors
3
Residential units
6
Building area
7,000 ft²
Lot area
3,125 ft²
Zoning
M1-5/R7-3
Community board
401
Council district
26
Block / lot
413 / 12
Assessed value
$600,750
Landmark / historic district
No

HPD registration #413764, last renewed Oct 22, 2025.

Questions about 41-27 23 Street

Who owns 41-27 23 Street?

The owner of record in NYC Department of City Planning PLUTO data is Pinn Day Day LLC.

Does 41-27 23 Street have violations?

Yes. NYC HPD has recorded 78 housing violations at this property.

Is 41-27 23 Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 41-27 23 Street built?

City records list 1931 as the year it was built.

How many apartments are in 41-27 23 Street?

It has 6 residential units and 7 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.