4430 Purves Street
Queens, NY 11101BBL 4-00268-0001Map
Owner of record: Purves Street Owners LLC
4430 Purves Street is an elevator apartment building built in 2015 in Queens, 11101. It has 272 residential units across 33 floors. The owner of record is Purves Street Owners LLC. HPD has recorded 8 housing violations here, most recently on November 20, 2024. 1 of the 8 most recent violations are still open. City tax records listed 270 rent-stabilized apartments here in 2024.
- HPD violations
- 8
- DOB violations
- 30
- ECB violations
- 66
- HPD complaints
- 71
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at west 1 door to fire stairs labeled ''b'' at public hall, 35th story
Nov 20, 2024
Closed — Violation closed - BHazardous
Refit door and frame at west 1 door to fire stairs labeled ''b'' at public hall, 35th story
Nov 20, 2024
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 27, 2023
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Sep 27, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 27, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 27, 2023
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Apr 24, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 24, 2018
Closed — Violation closed
DOB building violations · 30
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 2021
Dob violation - resolved - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed
Show 20 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 7, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 11, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 27, 2016
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 1, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Mar 9, 2016
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Mar 26, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 9, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 7, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 28, 1993
Dob violation - dismissed
ECB violations · 66
- Class - 1
Class 1 (rts):failure to maintain building in code compliant manner passenger elevator equipment as per bc3001.2 & 27-987. upon inspection, the only device in this section of the building is found to be out of
Sep 23, 2026 · Penalty $1,250
Active - Class - 2
Secure loose car station panels in car. repair phone in car. adjust leveling on top floor. clean rust from machine in motor room.
Jun 27, 2023 · Penalty $625
Resolve - Class - 2
Brake tag expired.
Jun 29, 2020 · Penalty $625
Resolve - Class - 1
Failure to have site safety manager when required. at time of inspection an active jobsite of a 33 story building. doing further research onbis alerted me that jobsite still under a site safety program. when i
Apr 16, 2018 · Penalty $5,000
Resolve - Class - 1
Insurance expired (workers comp and liability). at time of inspection on an active jobsite of a 33 story building while doing research on bis alerted me that workers compensation had expired on 03-29-18 and lia
Apr 16, 2018 · Penalty $5,000
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/vioilation#35257394x issued on 07/07/17 and file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for c of c mock up apt has
Aug 18, 2017 · Penalty $800
Resolve - Class - 2
Occupancy contrary to that allowed by the c of o or dob records. observation: @ 10th flr of bldg a mock up apt has been created for viewing. no temporary c of o issued for any flr in bldg. see construction obje
Jul 7, 2017 · Penalty $600
Resolve - Class - 3
03m07,09m07. 03m07-provide finished cab walls as per drawings; 09m07-provide finished cab flooring as per drawing.
May 26, 2017 · Penalty $100
Resolve - Class - 1
No design drawing.a time of inspection of 33 story bldg at roof level,observed that there were temp platforms in use over water tower. area one platform was constructed of wood and the other was aluminum upon
Apr 22, 2017 · Penalty $500
Resolve - Class - 1
Bc 1011. exit signs. at the time of inspection, observed no exit signs throughout the entire building creating a possible panic for person(s) during emergency evacuation situation. remedy: comply with code.
Mar 2, 2017 · Penalty $800
Resolve
Show 40 more ↓
- Class - 1
3301.2. holes/penetration. at the time of inspection, observed penetration at 27th floor riser electrical closet (with no doors) approx 2'x 4' openings to the floor below at a depth of 10' creating a hazardous
Mar 2, 2017 · Penalty $1,600
Resolve - Class - 2
Failure to obtain certificate of approval/ certificate of operation/ cd. sec stop work order 092816ml01. while conducting an audit of tower crane cd# 4726 i discovered the cd expired on 9/27/16. crane is requir
Sep 28, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.noted:while responding to incident of hammer coming off building under construction the following was observed. small hand hammer
Sep 27, 2016
Resolve - Class - 2
3308.3 vertical safety netting not per code damaged or inadequate. at time of inspection the following was observed,verticle net dislodged from cable guardrail system at 31 floor ex 1, creating a hazard to publ
Sep 27, 2016
Resolve - Class - 1
Failure to maintain housekeeping per section requirements.at time of inspection,observed 33 story proposed new building in process of stripping framework has looose debris on floors 32 & 33 consisting of debri
Sep 27, 2016 · Penalty $2,400
Resolve - Class - 1
3308.5vertical safety netting not maintained at time of inspection.observed active job site.vetical safety netting system is found to be inadequate on floors 25,32through35 in various locations.the netting is
Sep 14, 2016 · Penalty $1,600
Resolve - Class - 1
3308.2 horizontal safety netting not as per code.@time of inspection responding to a complaint observed bldg erected to 31st flr.while working @shear wall on concrete platform @31st flr a bolt(approx 4"x2-3lbs)
Aug 1, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard persons&property.while working on a concrete platform,approx.4"long bolt fell from 30th flr onto the street creating hazardous condition.the failure to secure loose&falling debris,materials
Aug 1, 2016 · Penalty $5,000
Resolve - Class - 1
No guardrails-noted inadequate guardrails @time of inspection observedguardrail system w.cable &(ckesly)clamps(reverved)¬ adequately fastened to cable guardrail system.dead end of wike roye has saddle w.tant
Jul 25, 2016 · Penalty $1,200
Resolve - Class - 2
3303.7.2 fire extinguishers shall be provided in accordance w.new yorkcity five code.note:@active construction site of 33stry new bldg w.cast in place concrete i witness on 18stry fire extinguisher not fully ch
Jul 25, 2016
Resolve - Class - 1
No toeboardds @time of inspection of 33stry new bldg under construction has no toeboards for interior staircase guardrail system @many locations below 128flr approx creating a hazardous condition for onsite wor
Jul 25, 2016 · Penalty $1,000
Resolve - Class - 1
Failure to safeguard all persons&property affected by construction operations.noted:@active construction site of 33stry new bldg w.cast in place concrete has according to witness had a wooden 2x4(fall)from site
Jul 25, 2016 · Penalty $5,000
Resolve - Class - 2
Job site fence not constructed pursuant to subsection.@time of inspection of active construction site of 33stry new bldg w.cast in place in process,has erected 8ft high construction fence under permit #42065219
Jul 25, 2016
Resolve - Class - 1
Failure to safeguard all persons,public & property affected by construction operations. at time of inspection,active job site. stripping operations in progress on the 29th fl. workers were stripping form work
Jun 28, 2016 · Penalty $10,000
Resolve - Class - 1
Sec. 3308.3 vertical safety netting-inadequate. at time of inspection observed,active job site. the vertical safety netting provided on the 29th fl is found to be inadequate & is sagging down putting workers &
Jun 28, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to maintain adequate housekeeping. at time of inspection observed,active job site. housekeeping has not been maintained on floors 23to 29 along the perimeter edge at side of the vertical safety netting
Jun 28, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard. at time of inspection,responding to co#4655557 of ssm reporting plywood falling off top of stripping operations 28 floor. fsm witness 4x8 plywood fall auto 15 fl setback from concrete oper
Jun 9, 2016 · Penalty $10,000
Resolve - Class - 1
Failure to provide standard guardrail system @ constr site. as noted: @ time of insp on an active constr site observed, @ working flr 27, exp#2 & 3, safety guardrails vertical required post spaced more than 8ft
May 26, 2016 · Penalty $1,200
Resolve - Class - 1
Sec: bc3308.1. failure to provide & maintain vertical safety netting. as noted: @ time of insp on an active constr site observed vertical netting w/ openings larger than 1 inch, w/ no netting, not extending to
May 26, 2016 · Penalty $400
Resolve - Class - 1
Failure of the concrete safety manager to perform required duties. as noted: @ time of insp on an active constr site. noticed concrete blowout, @ column#21 between 26 & 27 flr, due to formwork failure. per 1rcn
May 26, 2016 · Penalty $1,600
Resolve - Class - 1
Sec: bc3301.2. failure to cover holes & institute/maintain safety equipment measure ot temporary construction. as noted: @ time of insp on an active constr site observed (1) @ working deck perimeter platform (2
May 26, 2016 · Penalty $400
Resolve - Class - 1
Failure to safeguard all person & property affected by construction operation. as noted: @ time of insp on an active constr site noticed a concrete blowout a column#21 formwork bwteen flrs 26 & 27(concrete form
May 26, 2016 · Penalty $5,000
Resolve - Class - 1
Storage of materials during constr as noted: @ time of insp @ an active constru site observed (1) @ working deck (flr27) tube steel posts, equipment, tools, spray can, & debri kept w/in 2ft of the edge of form:
May 26, 2016 · Penalty $2,400
Resolve - Class - 1
Sec: bc1906.6.1.3. wedges. as noted: @ time of insp on an active constr site observed wedges being used w/in 10ft of the edge of the bldg slab. wedges in used to support 4x4 wood reshored @ flr 24,25,26. accord
May 26, 2016 · Penalty $1,600
Resolve - Class - 1
Sec: bc3301.7. failure to provide pe approved design drawings. as noted: @ time of insp on an active constr site observed: (1) worker tying of rebar coming of an unpoor shear wall located @ exp#2, working flr 2
May 26, 2016 · Penalty $1,600
Resolve - Class - 1
1906.6 restores not secure. at time of inspection, new bldg under construction w/concrete cast in place in process at 18 flr has l() restores at floors 16 and 15 within 10' of leveling edge not secured.rmdy:
Mar 31, 2016 · Penalty $1,600
Resolve - Class - 1
Wedges. at time of inspection of 33 story proposed new bldg w/concreteoperations has wooden reshores with wedges within 10' of leading edge creating a hazard for public below.rmdy: replace wedges w/metal reshor
Mar 31, 2016 · Penalty $1,600
Resolve - Class - 1
Bc3308.3 vertical safety netting not per code,damaged or inadequate.noted @ time of inspection the following was observed.vertical netting pulling away from (quaverail)cable @ various fls.forming 18 fl.creating
Mar 31, 2016 · Penalty $400
Resolve - Class - 1
Bc3301.5 performed audit inspection on tower crane cd#4726, cn#367/15at time of inspection i observed the cable on the main hoisting drum not wrapping evenly. the wrapping on the drum had spacing and gaps,and
Mar 14, 2016 · Penalty $1,600
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. noted at time of inspection of 33 story new building w/concrete operations in progress.approved pe plan for safe ()straps not
Jan 25, 2016 · Penalty $250
Resolve - Class - 1
28-201.1 failure to comply w/an order of the commissioner regarding concrete embedded safety straps dated on june 13, 2008. noted at time of inspection no record of installation for concrete embedded safety
Jan 25, 2016
Resolve - Class - 1
Bc3308.2 horizontal netting not per code, damaged or inadequate. at time of inspection, the follow was observed at active jobsite with concrete operation at 9th flr. the horizontal nets in the up position
Jan 25, 2016 · Penalty $1,600
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.noted: at time of inspection the following was observed. 33story new bldgunder construction has concrete operations at () floor, working deck
Jan 25, 2016
Resolve - Class - 2
3301.7 design required be chapter 33.note:@time of insp observed active jobsite.erecting 5th fl in progress from the 2nd to 5th fl there areladders on elevator shaft platforms.the design on site for shaft platf
Dec 17, 2015
Resolve - Class - 2
Failure to safeguard all persons & property affected by const ops note:active jobsite,5th fl erecting below.@the 3rd fl there was no temp lighting in place.all fls should be (lift) up to avoild possible hazards
Dec 17, 2015 · Penalty $1,200
Resolve - Class - 1
Failure to safeguard all persons & property affected by const ops.note:observed active jobsite,erecting 5th fl level.@exp#3 observed (sets back) walkway that travels from tower a to area b.workers walking from
Dec 17, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to maintain:toeboards.note:active jobsite,5th fl (being) erected,workera workings throughout jobsite.@the 4th fl which has been stripped does not have toeboards installed @exp#1 & 2& 3& 4 causing a haza
Dec 17, 2015 · Penalty $1,000
Resolve - Class - 2
Bc28-104.7 submittal of construction documents. as noted: at time of inspection on an active construction site observed on cellar level; column 16; 6'-6"from bottom of column (going up vertically) entire cro
Nov 25, 2015 · Penalty $400
Resolve - Class - 1
3307.6.2 areas to be protected: no overhead protection for workers inegress of site. note: observed action jobsite,workers erecting forms, concrete work,housekeeping. i observed site entance at exp#1,where wor
Nov 7, 2015 · Penalty $1,200
Resolve - Class - 1
Failure to maintain guardrails. note: observed active site erected up to the 3rd level. at exp#4 at 2nd flr level observed, inadequate guardrails system in place. observed rebar upright apprx 40"high w/orange n
Nov 7, 2015 · Penalty $1,200
Resolve
Complaints
- Appliance
Electric/gas range
Apr 13, 2025 · Apt 16B
Close - General
Cooking gas
Apr 7, 2025 · Apt 16B
Close - General
Cooking gas
Jan 19, 2025 · Apt 21B
Close - Heat/hot water
Apartment only
Jan 16, 2025 · Apt 8C
Close - Heat/hot water
Apartment only
Jan 12, 2025 · Apt 9F
Close - Heat/hot water
Entire building
Jan 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 19, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Apr 1, 2024 · Apt 17E
Close - Plumbing
Toilet
Apr 1, 2024 · Apt 17E
Close - Appliance
Refrigerator
Oct 11, 2023 · Apt 3E
Close - Unsanitary condition
Sewage
Sep 24, 2023 · Apt 17B
Close - Unsanitary condition
Sewage
Oct 10, 2022 · Apt APT3J
Close - General
Cooking gas
Aug 26, 2019 · Apt 3D
Close - Safety
Window guard broken/missing
Aug 5, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 5, 2019 · Apt BLDG
Close - Electric
No lighting
Aug 5, 2019 · Apt BLDG
Close - General
Signage missing
Aug 5, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 26, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 26, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 25, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 25, 2019 · Apt 16M
Close - Heat/hot water
Entire building
Jul 24, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 24, 2019 · Apt BLDG
Close - General
Cooking gas
Jul 24, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 24, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 23, 2019 · Apt BLDG
Close - General
Cooking gas
Jul 23, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 23, 2019 · Apt BLDG
Close - General
Cooking gas
Jul 23, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 23, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 23, 2019 · Apt 10C
Close - General
Cooking gas
Jul 23, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 23, 2019 · Apt BLDG
Close - Plumbing
Water supply
Jul 23, 2019 · Apt 3A
Close - Appliance
Electric/gas range
Jul 23, 2019 · Apt 3A
Close - General
Cooking gas
Jul 22, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 22, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 22, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 22, 2019 · Apt BLDG
Close - General
Cooking gas
Jul 22, 2019 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2015
- Floors
- 33
- Residential units
- 272
- Building area
- 275,731 ft²
- Lot area
- 27,249 ft²
- Zoning
- M1-5/R9
- Community board
- 402
- Council district
- 26
- Block / lot
- 268 / 1
- Assessed value
- $34,088,850
- Landmark / historic district
- No
HPD registration #432410, last renewed Apr 21, 2026.
Questions about 4430 Purves Street
Who owns 4430 Purves Street?
The owner of record in NYC Department of City Planning PLUTO data is Purves Street Owners LLC.
Does 4430 Purves Street have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 4430 Purves Street rent stabilized?
NYC Department of Finance tax bills listed 270 rent-stabilized units here in 2024 (about 99% of its 272 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 4430 Purves Street built?
City records list 2015 as the year it was built.
How many apartments are in 4430 Purves Street?
It has 272 residential units and 273 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.