44-41 Purves Street
Queens, NY 11101BBL 4-00267-0009Map
Owner of record: Purvis Holdings LLC
44-41 Purves Street is an elevator apartment building built in 2015 in Queens, 11101. It has 285 residential units across 26 floors. The owner of record is Purvis Holdings LLC. HPD has recorded 31 housing violations here, most recently on July 19, 2026. City tax records listed 285 rent-stabilized apartments here in 2024.
- HPD violations
- 31
- DOB violations
- 14
- ECB violations
- 42
- HPD complaints
- 50
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 31
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 902, 9th story, 8th apartment from south at west
Jul 19, 2026 · Apt 902
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 902, 9th story, 8th apartment from south at west
Jul 19, 2026 · Apt 902
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 4th room from north located at apt 1401, 14th story, 1st apartment from north at east
Jun 19, 2026 · Apt 1401
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete floor tiles in the foyer located at apt 1402, 14th story, 1st apartment from north at east
Aug 10, 2025 · Apt 1402
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor
Jun 25, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to laundry room at cellar at public hall, section at south
Jun 13, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame at door to utility rooms at cellar at public hall, section at south
Jun 13, 2024
Closed — Violation closed - BHazardous
Refit door and frame at door to utility rooms at cellar at public hall, section at south
Jun 13, 2024
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from north located at apt 2602, 26th story, 1st apartment from south at west
Nov 6, 2023 · Apt 2602
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 2602, 26th story, 1st apartment from south at west
Nov 6, 2023 · Apt 2602
Closed — Violation dismissed
Show 21 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective apartment door in the entrance located at apt 2602, 26th story, 1st apartment from south at west
Nov 6, 2023 · Apt 2602
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Nov 6, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the 2nd bedroom from east at north located at apt 1310, 13th story, 4th apartment from south at west
Sep 23, 2019 · Apt 1310
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at north wall 5sqft in the 2nd bedroom from east at north located at apt 1310, 13th story, 4th apartment from south at west
Sep 23, 2019 · Apt 1310
Closed — Violation closed - ANon-hazardous
Replace with new the missing floor molding at north and west wall in the 2nd bedroom from east at north located at apt 1310, 13th story, 4th apartment from south at west
Sep 23, 2019 · Apt 1310
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood tile floor in the 2nd bedroom from east at north located at apt 1310, 13th story, 4th apartment from south at west
Sep 23, 2019 · Apt 1310
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 23, 2019
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall 5sqft in the 2nd bedroom from east at north located at apt 1310, 13th story, 4th apartment from south at west original violation 13296831 issued 23-sep-19 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 23, 2019 · Apt 1310
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Sep 11, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 11, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 11, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Sep 11, 2018
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 11, 2018
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the nuisance consisting of mold ... east wall 6 sq.ft, and ceiling 8 sq.ft in the 3rd room from east located at apt 2603, 26th story, 1st apartment from east at south
Jun 29, 2018 · Apt 2603
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the 3rd room from east located at apt 2603, 26th story, 1st apartment from east at south
Jun 29, 2018 · Apt 2603
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden floor in the 3rd room from east located at apt 2603, 26th story, 1st apartment from east at south
Jun 29, 2018 · Apt 2603
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 1301, 13th story, 1st apartment from north at east
Mar 29, 2018 · Apt 1301
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 3rd room from east located at apt 1301, 13th story, 1st apartment from north at east
Mar 29, 2018 · Apt 1301
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. , 1st story
Oct 4, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Oct 4, 2017
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Oct 4, 2017
Closed — Violation dismissed
DOB building violations · 14
- Elevator elevatorrequired
E-elevator elevatorrequired
May 13, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 26, 2018
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed
Show 4 more ↓
- Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 29, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Jul 29, 2008
Dob violation - dismissed
ECB violations · 42
- Class - 3
Work does not conform to approved construction documents or amendmentsjob #421050551/a3/dwg. dated 11-5-14 noted 1)south curb cut is not 7' distance from hydrant & not located as show plan. 2)front trees planti
Mar 9, 2016
Resolve - Class - 3
Work does not conform to approved construction document or amendments.noted: job#4210505425 dwg dated 11/5/14 (1)south curb cut 5' from hydrant(plan show 7' from hydrant(2)curb cut location is not as show plan.
Mar 4, 2016
Resolve - Class - 2
Failure to safeguard all persons and property affected by construction operations.noted:observed active jobsite,site safety jobsite 25+ floors, inerior trades working throughout. spot check of osha 10 cards rev
Dec 22, 2015 · Penalty $1,200
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.note: observed active jobsite 25+ stories,interior () working throughout site. at flrs 25,24,23 the hallway lights wer enot on,wo
Dec 22, 2015 · Penalty $1,200
Resolve - Class - 2
Failure to post no smoking signs at constr site as per fire code. note: observed active site,interior tracks working throughout site. observed on various floors and staircases that there were no smoking signs
Dec 22, 2015
Resolve - Class - 2
3303.4.1 maintenance: slipping and tripping hazards. note:observed active jobsite,interior racks throughout site. at the 25th floor and 22 flr observed extension ch() crossing over and hallway and over act
Dec 22, 2015 · Penalty $400
Resolve - Class - 2
Failure to maintain:housekeeping. noted: observed active jobsite,25+ stories. interior trades throughout. at the roof observed scattered debris wood garbage on multiple floors there were debris on stairs,stair
Dec 22, 2015
Resolve - Class - 2
Failure to adequately supervise work at a construction site, as to maintain a safe site. note: observed active jobsite 25+ stories out of ground.i observed various safety issues 1-houskeeping; 2-inadequate
Dec 22, 2015 · Penalty $400
Resolve - Class - 1
Standpipe systems during construction alteration and demolition.noted:at time of inspection of 25story new building under construction has dry standpipe system under permit #420604956 with no pressure in stand
Nov 30, 2015 · Penalty $1,600
Resolve - Class - 1
Bc3314.8 guardrail and toeboard missing at time of inspection of supported pipe scaffold has scaffold with no guardrail a toeboard at expended apprx 5 frames high with work starting on edge of scaffold.also
Nov 30, 2015 · Penalty $1,600
Resolve
Show 32 more ↓
- Class - 1
28-110.1 osher 10. at time of inspection of 25 story new building under construction has one worker on supported pipe scaffold with no osha car presented creating a training hazard for himself and others for
Nov 30, 2015 · Penalty $1,200
Resolve - Class - 1
Bc3318.3 c/u-75l11,c/u-100m07,c/u-10011; 05h11,58h11,45a10,80#01,70o02,100j01. cease use-75l11-hoist car oil buffers not fully retracted; 100m07-provide the 2 missing bolts on the safety beam; 100r11-replace
Jul 27, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp const-no guardrails.@time of insp.@the above mentioned address i observed an active nb in progress.the main support post(on)guardrail system @the
Jul 17, 2015 · Penalty $1,200
Resolve - Class - 1
3318.5.1 c/u-26l10-outside hoist device #4v21975 escape hatch safety switch is damaged hoist still runs with hatch open: remedy:repair switch and call dob to rescind cease use orders (212) 393-2488.
Jul 17, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp const-no toeboards.@time of insp @the above mentioned address i observed an active nb in progress.the guardrail system on the 24th fl @elevator sh
Jul 17, 2015 · Penalty $1,000
Resolve - Class - 1
Bc3318.3 c/u-56h10; c/u-32h11...05m07,100h11. cease use (56h10 motor pinion and gear box worn, motor pinon is bottomed out on the rack;32h 11-top left bogy rollers are worn causing car to shirt to the right
Jul 17, 2015 · Penalty $1,600
Resolve - Class - 1
Missing fence/no fence. at time of my inspection observed-nb topped off-missing fence at entire length at exp#1 as required per code."stop all construction activity"full stop work order-issued pursuant to
Jun 15, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. at time of my inspection responding to incident #19756-a reshore jack fell from upper floor exp#3 hit a car parked on adj parking
Jun 15, 2015 · Penalty $2,400
Resolve - Class - 1
Sec. 3307.4 warning signs & barricade not provided. observed-nb toppedoff. materials piled on street at exp#1 was not barricaded to prevent public contact. remedy: provide barricades for materials stored on
Jun 15, 2015 · Penalty $400
Resolve - Class - 1
Sec. 3314.4.4 material stored on scaffold while work is not being done. observed-nb topped off approx 160'high 8 pipe scaffold erected at exp#3 construction materials left on scaffold platform. bricks loose
Jun 15, 2015 · Penalty $400
Resolve - Class - 2
Work/actual site condition doesn't conform to approved site safety plan,observed-approved site safety plan shows chainlink fence w/barricades on purves street. no barricades observed w/fence. remedy: conform to
Jun 15, 2015 · Penalty $1,200
Resolve - Class - 1
Work after hours w/o variance permit. contrary to 28-105.12.5 observednb under construction.apprx 12 workers on site working at apprx 7:30pmno after hours variance permit posted/obtained as required.stop all af
Mar 3, 2015 · Penalty $800
Resolve - Class - 1
Failure to safeguard all persons and proeprty affected by constructionoperation.observed nb under construction, apprx 12 workers working inside the bldg in the night at apprx 7:30pm workers cleaning/removing de
Mar 3, 2015 · Penalty $1,200
Resolve - Class - 1
Failure to notify promptly to dept of an incident on construction sitejob site super stated on apprx 11-13-14 at 4:30pm concrete debris fulloff bldg at exp3 onto car driving on ramp. driver reported to site
Dec 18, 2014 · Penalty $2,500
Resolve - Class - 2
Bc3301.2 holes not covered.noticed at time of inspection nb in progress.notice over 25 holes openings not covered throughout entire site. previous violation issued for holes ecb#35098694j rmdy:stop all work
Dec 16, 2014 · Penalty $1,000
Resolve - Class - 2
Failure to maintain housekeeping noticed at time of inspection nb in progress pouring 25th flr housekeeping throughout entire building not maintained daily.piles of debris piled as high as 4'on floors througho
Dec 16, 2014 · Penalty $1,000
Resolve - Class - 2
Bc3308.3 vertical netting not per code,damaged or inadequate.noticed at time of inspection nb inprogress pouring 25th flr noticed inadequatevertical netting on every flr thru out entire site holes,tears,not sec
Dec 16, 2014 · Penalty $400
Resolve - Class - 3
Cd 4333,cn 23/14 cuo 091814dkm01 operation of defective hoisting equiptment.i obersver paddle on(asppalt)under crane.i followed the paddle up to the deck & the deck was wet w/ hyd fluid.open cabinet & rd ring g
Sep 18, 2014 · Penalty $500
Resolve - Class - 1
3301.2 holes/openings not covered.at time of inspection observed n.b. under construction.holes and openings not covered at 9 & 10 & 11 & 12 &13 flrs. openings/holes approx 6" and bigger. approx 25 holes/opening
Aug 20, 2014 · Penalty $1,600
Resolve - Class - 1
Failure to maintain adequate housekeeping, at time of inspection observed active nb under construction.concrete debris on leading edge of bldg outside of vertical netting at 8th & 9th & 10th & 11th & 12th flr
Aug 20, 2014 · Penalty $2,400
Resolve - Class - 2
3313.1 combustible liquid - not stored properly.at time of inspection observed active n.b. under construction.gasoline can stored on pile ofdebris at 11th flr creating fire hazards.rmdy: comply w/nyc fire code.
Aug 20, 2014
Resolve - Class - 1
1906.6 reshores in proximity to facade within 10'; not secured.at timeof inspection observed active jobsite pouring concrete on 15th fl reshores are not secured at 11th and 12th fl throughout.causing hazards to
Aug 20, 2014 · Penalty $1,600
Resolve - Class - 1
Work w/o permit. @ time of insp. active job site bldg completed to 9 stories temporary standpipe installd to the 6th fl no permit obtain to install temporary standpipe dry system w/ alarm. alarm system is insta
Jun 30, 2014
Resolve - Class - 1
Swo 042914dkm01 inadequate safety measure operation of crane in unsafemanner.i witnessed hmo heliodoro hurtero lic 10010 unload a truck outside the pick zone.across the street.he sated he did not read the drawi
Apr 29, 2014 · Penalty $1,600
Resolve - Class - 2
942914dkm01 work does not conform to approved const.doc.cn022/14 i observed crane unloading truck from across the street from job site.const.barracades are in the wrong location.crane setup two close to bldg.ba
Apr 29, 2014
Resolve - Class - 1
042914dkm01 failure to safe guard all persons & property affected by const.oper.i witness crane cn022/14-cd3866 unload a truck across the street from job site.nov in the pick zone.a car or person could have dri
Apr 29, 2014 · Penalty $2,400
Resolve - Class - 2
3310.3 failure to comply w/ site safety program.@ time of insp active jobsite reshores installed 2nd fl form work decking inplace & reinforced steel rebars being assembled by lathers,not approved.site safety pl
Mar 31, 2014 · Penalty $400
Resolve - Class - 1
Failure to have site safety manager present as required on site activejobsite under app#420875734 for foundation work in progress.no site safety manager present during concrete pour of 1st fl slab.stop all work
Mar 31, 2014 · Penalty $1,200
Resolve - Class - 2
Work does not conform to approved const docs.site safety plans @ time of insp active jobsite a permanent fence occupying 1)lane closure is not installed as required.@ exp1.4' height removed jersey barriers inst
Mar 31, 2014 · Penalty $250
Resolve - Class - 2
Sec. 3310.6 failure to have designated ssm on indicated on pw2 presenton site at min of once every 2 weeks. examination of site safety log for dates 1-6-14 to 3-11-14 indicates that ssm#m001897 so designated on
Mar 12, 2014
Resolve - Class - 2
Job site fence not constructed pursuant to subsetion. note: at time of inspection i observed construction fence at exposure 3 and 4,built of chain link with a height of approx 6'height.fence should be built
Jan 23, 2014
Resolve - Hazardous
No jobsite fence-at time of inspection, active demolition site is in progress. partial structure of 2 story building at back down. exterior wall of rear side partialy down. no fence provided at back side of the
May 20, 2008 · Penalty $500
Resolve
Complaints
- Door/window
Door
Oct 5, 2026 · Apt BLDG
Close - Door/window
Door
Sep 8, 2026 · Apt BLDG
Close - Safety
Fire escape
Aug 12, 2026 · Apt BLDG
Close - Door/window
Door
Aug 12, 2026 · Apt BLDG
Close - Safety
Fire escape
Aug 12, 2026 · Apt BLDG
Close - Electric
Power outage
Jul 15, 2026 · Apt 902
Close - Electric
Power outage
Jul 15, 2026 · Apt 902
Close - Water leak
Slow leak
May 24, 2026 · Apt 1401
Close - Unsanitary condition
Mold
Apr 16, 2026 · Apt 707
Close - Door/window
Window frame
Apr 16, 2026 · Apt 707
Close
Show 40 more ↓
- Paint/plaster
Wall
Apr 16, 2026 · Apt 707
Close - General
Ventilation system
Apr 16, 2026 · Apt 707
Close - Safety
Smoke detector
Apr 16, 2026 · Apt 707
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt HALLS
Close - Flooring/stairs
Floor
May 15, 2025 · Apt 1402
Close - Water leak
Slow leak
Mar 6, 2025 · Apt 1002
Close - Unsanitary condition
Mold
Nov 21, 2024 · Apt GYM
Close - Unsanitary condition
Pests
Oct 2, 2024 · Apt 2303
Close - Water leak
Slow leak
Aug 12, 2024 · Apt 1401
Close - Heat/hot water
Apartment only
Jun 12, 2024 · Apt 2207
Close - Water leak
Heavy flow
Oct 30, 2023 · Apt 2602
Close - Plumbing
Bathtub/shower
Sep 24, 2023 · Apt 11D
Close - Heat/hot water
Apartment only
Jun 20, 2023 · Apt 706
Close - Appliance
Refrigerator
Apr 19, 2023 · Apt 915
Close - Unsanitary condition
Mold
Apr 19, 2023 · Apt 915
Close - Heat/hot water
Apartment only
Apr 9, 2023 · Apt 1105
Close - Water leak
Damp spot
Feb 26, 2021 · Apt 1602
Close - Appliance
Electric/gas range
Jan 27, 2021 · Apt 408
Close - Unsanitary condition
Mold
Aug 22, 2019 · Apt 1310
Close - Flooring/stairs
Floor
Aug 22, 2019 · Apt 1310
Close - Water leak
Slow leak
Aug 22, 2019 · Apt 1310
Close - Unsanitary condition
Garbage/recycling storage
Aug 2, 2019 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 1, 2018 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 1, 2018 · Apt 2603
Close - Water leak
Heavy flow
Jun 1, 2018 · Apt 2603
Close - Flooring/stairs
Floor
Jun 1, 2018 · Apt 2603
Close - Flooring/stairs
Floor
May 27, 2018 · Apt 2603
Close - Paint/plaster
Ceiling
May 27, 2018 · Apt 2603
Close - Water leak
Heavy flow
May 27, 2018 · Apt 2603
Close - Unsanitary condition
Mold
May 27, 2018 · Apt 2603
Close - Safety
Window guard broken/missing
Apr 27, 2018 · Apt 1101
Close - Paint/plaster
Wall
Mar 21, 2018 · Apt 1301
Close - Paint/plaster
Wall
Mar 21, 2018 · Apt 1301
Close - Flooring/stairs
Floor
Mar 21, 2018 · Apt 1301
Close - Water leak
Heavy flow
Mar 21, 2018 · Apt 1301
Close - Paint/plaster
Ceiling
Mar 21, 2018 · Apt 1301
Close - Water leak
Heavy flow
Mar 2, 2018 · Apt 1001
Close - Water leak
Heavy flow
Sep 27, 2017 · Apt 2308
Close - Electric
Wiring
Apr 28, 2017 · Apt 1101
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D8)
- Year built
- 2015
- Floors
- 26
- Residential units
- 285
- Building area
- 259,805 ft²
- Lot area
- 25,600 ft²
- Zoning
- M1-5/R9
- Community board
- 402
- Council district
- 26
- Block / lot
- 267 / 9
- Assessed value
- $31,310,550
- Landmark / historic district
- No
HPD registration #431837, last renewed Jul 28, 2026.
Questions about 44-41 Purves Street
Who owns 44-41 Purves Street?
The owner of record in NYC Department of City Planning PLUTO data is Purvis Holdings LLC.
Does 44-41 Purves Street have violations?
Yes. NYC HPD has recorded 31 housing violations at this property.
Is 44-41 Purves Street rent stabilized?
NYC Department of Finance tax bills listed 285 rent-stabilized units here in 2024 (about 100% of its 285 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 44-41 Purves Street built?
City records list 2015 as the year it was built.
How many apartments are in 44-41 Purves Street?
It has 285 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.