2316 Clarendon Road
Brooklyn, NY 11226BBL 3-05189-0007Map
Owner of record: 2316 Clarendon Rd LLC
2316 Clarendon Road is an elevator apartment building built in 2022 in Brooklyn, 11226. It has 15 residential units across 6.5 floors. The owner of record is 2316 Clarendon Rd LLC. HPD has recorded 8 housing violations here, most recently on June 16, 2025. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 8
- DOB violations
- 1
- ECB violations
- 28
- HPD complaints
- 6
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Sep 11, 2015
Closed — Violation closed - BHazardous
Properly repair the broken or defective paving front yard
Sep 11, 2015
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Sep 11, 2015
Closed — Violation closed - BHazardous
Properly repair the broken or defective paving rear yard
Sep 11, 2015
Closed — Violation closed - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material. yard
Sep 11, 2015
Closed — Violation closed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures where illegal and properly seal pipe connections cellar through out
Sep 24, 2008
Closed — Violation closed - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible gas range at cellar
Sep 24, 2008
Closed — Violation closed
DOB building violations · 1
- Construction other optional
C-construction other optional
Feb 10, 2006
Dob violation - dismissed
ECB violations · 28
- Class - 1
Bc3314.1 unsafe supported scf note:ato my insp proposed 6stynb observed supported scf@exp1&4 w/following v conditions:1)netting not enclosedopen areas 2)missing toeboards,midrails&toprails 3)missing safety pins
Apr 25, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to perform proper concrete washout water procedures.at time ofinspection of 7 story nb active concrete pouring operations at exp#1 concrete pump upon request to show location of a washout box for concre
Dec 23, 2021 · Penalty $2,500
Resolve - Class - 2
Bc 3307.7 failure to provide and maintain jobsite fence at time of inspection of 7 story nb,active jobsite observed missing jobsite fence atexp#3 and exp#4 rearyard.this condition create hazard for public wonde
Dec 23, 2021
Resolve - Class - 2
Construction superintendent failed to perform duties as per code.at time of inspection of 7 story nb active jobsite and after full inspection and review all the logs observed that construction superintendent fa
Dec 23, 2021 · Penalty $2,500
Resolve - Class - 2
Bc 3314.4 supported pipe scaffold installed not as per code.at time ofinspection of 7 story nb,active jobsite observed supported pipe scaffold installed at exp#1,2,3 not as per code.supported pipe scaffold miss
Dec 23, 2021
Resolve - Class - 2
Storage on sidewalk shed at time of inspection of 7 story nb,active jobsite observed sidewalk shed with materials stored on top of it at exp#1 no indicate of sws drawings for any storage on sws no materials sha
Dec 23, 2021 · Penalty $1,250
Resolve - Class - 1
Bc 3308.5 vertical safety netting system.at time of inspection of 7 story nb,active jobsite observed on 5th and 6th floor inadequate vertical safety netting around all exposures.vertical netting was missing zer
Dec 23, 2021 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments(ssp).at time of inspection of 7 story nb,active jobsite observed concrete pump on roadway at exp#1 and workers performing conc
Dec 23, 2021 · Penalty $2,500
Resolve - Class - 1
Bc 3309.10 protection of roofs.at time of inspection of 7 story nb,active jobsite observed inadequate roof protection for adjacent property at exp#4.obseved that apart of adjacent parapet was not protected and
Dec 23, 2021 · Penalty $2,500
Resolve - Class - 2
At time of inspection, on exposure 4 from 1st to 4th floor, ci installed is r-10 as opposed to en-001.00 that requires ci r-11.4, install insulation and/or r value that meet requirements; install insulation and
Sep 2, 2021
Resolve
Show 18 more ↓
- Class - 2
Failure to maintain adequate housekeeping at the time of inspection ofa 6 story nb observed amounts of debris scattered at supported scaffold exposure#2 sidewalk shed platform and big pile of concrete pile on 4
Aug 27, 2021
Resolve - Class - 1
Failure to maintain safety measures-guardrails.at the time of inspection of a proposed 6 story nb,active site observed guardrail system on 2,3 & 4th floor not maintain properly guardrail as a cable system appea
Aug 27, 2021 · Penalty $2,500
Resolve - Class - 2
Bc 3308.5 failure to maintain adequate vertical netting.at the time ofinspection of 6 story nb,observed inadequate vertical netting at the following locations:2nd fl exp#1 & 2 3rd fl exp#1 & 2 4th floor all aro
Aug 27, 2021
Resolve - Class - 2
Pedestrian protection does not code.specification.note:at time of my inspection of a 6 story building at 2nd story stage.no work in progress.i,observed no lights,under the sidewalk,shed fixtures present but not
Jun 24, 2021 · Penalty $2,400
Resolve - Class - 2
Pedestrian protection does not meet code specification note at time ofmy inspeciton of a 6 story building under construction at 2nd stage nowork in progress.i observed at 4:15am that they eights under the shed
Jun 15, 2021 · Penalty $625
Resolve - Class - 2
Jobsite fene not constructed or maintained pursuant to subsection at the time of my inspection of a 6 story new building observed construction fence at exp #1 ,2, and 4 not maintained or constructed as per code
May 19, 2021 · Penalty $500
Resolve - Class - 2
Project information panel/sidewalk parapet panel at the time of my inspection of 6 story new building observed sidewlak shed at exp #1 missing parapet information panel for project as required by code comply wi
May 19, 2021 · Penalty $625
Resolve - Class - 2
Bc3307.4-warnings signs,personnel and barriers at the time of my inspection of 6 story new building observed jobsite is closed and no active work observed equipment stored on street next to the sidewalk
May 19, 2021 · Penalty $625
Resolve - Class - 2
Work doesn't conform to const docs &/or approved amendments(soe out ofsequence)@time of insp of active site i observed footings&foundation work being done when i asked competent person to show me work being don
Mar 5, 2021
Resolve - Class - 1
Bc3301.13.1 contrary to plans-egress @time of insp of active site,i observed steel blocking 1st way of egress&port of sand(bathrm) blocking 2nd way of egress.ingress&egress must be maintained at all times.port
Mar 5, 2021 · Penalty $625
Resolve - Class - 1
Failure to notify dept prior to earthwork.@time of my insp on active jobsite@foundation/excavation stage.observed that upon request the excavation# constrator provided wasn't good when it was revised on system(
Feb 23, 2021
Resolve - Class - 1
Bc3301.1.1 failure to provide/maintain adequate means of egress duringexcavation&earthwork.@time of my insp on active nbjobsite@foundation/excavation stage.observed that contractor engaged to earthwork failed t
Feb 23, 2021 · Penalty $625
Resolve - Class - 2
Dcos to be kept onsite.@time of my insp on active nbjobsite@foundation/excavation stage.observed contrator engaged to earthwork upon requestdidn't have onsite docs such as monitoring reports,site safety plans,p
Feb 23, 2021
Resolve - Class - 1
Work contrary to const docs(soe&ssp)@time of my insp on active jobsite@foundation/excavation stage.observed that site field condition diff from what it shows on const docs drawings(50e&ssp).for instance,45degre
Feb 23, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to provide required notification prior to the commencement of demolition. at time of inspection at a demolition monitoring construction site,i observed the demolition work was completed. upon reviewing
Aug 10, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/commissioners order to file a certificate of cor- rection w/dob. noted: no certificate of correction has been filed for nov34508124k issued 2/10/06. rmdy: file certificate of correction.
Aug 17, 2013 · Penalty $800
Resolve - Non-hazardous
Dwelling illegally converted from 2 family to 4 families. partitions erected in attic and basement to create separate rooms (3 each) full 3 pc bathrooms and kitchens with operable gas stoves (1 of each on each)
Feb 10, 2006 · Penalty $2,500
Resolve - Hazardous
Failure to provide required means of egress for every flr or space where required. attic arranged for occupancy with partitions erected to create separate rooms (3) full 3 pc bathroom and kitchen with operable
Feb 10, 2006 · Penalty $2,500
Resolve
Complaints
- Water leak
Slow leak
Sep 14, 2024 · Apt 4B
Close - Door/window
Door
Sep 14, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
Oct 21, 2016 · Apt 2NDFL
Close - Heat/hot water
Apartment only
Nov 2, 2014 · Apt 2
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2014 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Aug 28, 2014 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2022
- Floors
- 6.5
- Residential units
- 15
- Building area
- 13,525 ft²
- Lot area
- 4,000 ft²
- Zoning
- R6A
- Community board
- 314
- Council district
- 45
- Block / lot
- 5189 / 7
- Assessed value
- $1,370,250
- Landmark / historic district
- No
HPD registration #391546, last renewed Jul 22, 2025.
Questions about 2316 Clarendon Road
Who owns 2316 Clarendon Road?
The owner of record in NYC Department of City Planning PLUTO data is 2316 Clarendon Rd LLC.
Does 2316 Clarendon Road have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 2316 Clarendon Road rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 80% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2316 Clarendon Road built?
City records list 2022 as the year it was built.
How many apartments are in 2316 Clarendon Road?
It has 15 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.