2484 Bedford Avenue
Brooklyn, NY 11226BBL 3-05167-0045Map
Owner of record: 2484 Bedford LLC
2484 Bedford Avenue is an elevator apartment building in Brooklyn, 11226. It has 25 residential units across 6 floors. The owner of record is 2484 Bedford LLC. HPD has recorded 5 housing violations here, most recently on September 2, 2025. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 5
- DOB violations
- 0
- ECB violations
- 16
- HPD complaints
- 3
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 5
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 6a, 5th story, 1st apartment from south at west
Sep 2, 2025 · Apt 6A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 21, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 16
- Class - 1
Failure to provide sidewalk shed where required.at time of inspection oberved 6 story building under construction supported scaffold at exp #1.review of ssp at site called for sidewalk shed at exp #1 more over
Sep 30, 2021
Resolve - Class - 2
Failure to institute safety equipment measures & temporary construction. at the time of inspection of 6 sty new bldg observed,at roof level construction work in progress that include stucco,styrofoam operation
Jul 28, 2021
Resolve - Class - 2
Pedestrian protection does not meet code specfications provide mirrorsat blind spots.note:at time of my inspection of a 6 story building copped off at roof construction work in progress.i observed that no mirro
Jul 26, 2021
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations. at the time of my inspection while responding to a complaint of falling debris from const operations into residence and business
Jul 1, 2021
Resolve - Class - 1
3308.5 vertical safety netting system.at the time of inspection i observed inadequate vertical safety netting system at all stories and all exposures.missing top rail at a height of 60 inches as required by cod
Jun 7, 2021
Resolve - Class - 2
Failure to maintain adequate housekeeping.at time of inspection of proposed 6 story nb construction activites in progress observed loose materials and equipment spread all over the site and walking up the roof
Jun 1, 2021
Resolve - Class - 1
Permit holder failed to ensure workers receive site safety orientationor refresher.note:at the time of my inspection of 6 story new bldg at preparation of form work of 6th fl slab.upon request for site safety
Apr 15, 2021
Resolve - Class - 1
3305.3.6.1.2 reshores in proximity to unenclosed perimeters.note at the time of my inspection of a 6 story building at preperation for form work of slab of the 6th floor and stripping operations at 4th floor,i
Apr 15, 2021 · Penalty $500
Resolve - Class - 1
3301.6 temporary construction-no design drawing.note at the time of myinspection of 6 story new building at preparation for form work of 6t floor slab and 4th floor stripping operations,i observed that there is
Apr 15, 2021
Resolve - Class - 1
Failure to comply w/manufacturer specifications. note: at the time of my inspection of 6 sty new bldg at preparation for formwork of 6th fl slab,i observed plastic barriers on streets at exp#1&2,upon making ins
Apr 15, 2021
Resolve
Show 6 more ↓
- Class - 1
Failure to obtain registered design professional(rdp)evaluation prior to using existing structure to support formwork loads. note: at time of inspection of a 6 sty bldg,i observed an active site w/concrete form
Mar 11, 2021
Resolve - Class - 1
Sec. 3307.4.7 work or storage zones. note: at the time of inspection iobserved active work in roadway at exp#1&2. 1)concrete operations 2)scffold operations. upon inspection i observed the area was not enclosed
Mar 9, 2021 · Penalty $625
Resolve - Class - 1
Permit holder failed to ensure workers receive site safety orientation. note: at the time of inspection of a 6 sty new bldg construction work in progress. upon request for records of site safety orientation for
Mar 9, 2021 · Penalty $5,000
Resolve - Class - 1
Sec. 3307.4.2 dangerous areas. note: at the time of inspection of a 6 sty new bldg construction,i observed active concrete operations at exp#2. i also observed outrigger from the concrete pump truck was on the
Mar 9, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction no toe board.note at time of inspection of an active job site with 21 workers of various trades.at foundation stage i observed t
Jan 28, 2021
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction no handrail.at time of inspection of an active jobsite with 21 workers of various trades,i observed that there were missing hand
Jan 28, 2021
Resolve
Complaints
- Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Door/window
Door
Aug 24, 2023 · Apt 6D
Close - Door/window
Window frame
Nov 19, 2022 · Apt 2E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- —
- Floors
- 6
- Residential units
- 25
- Building area
- 20,389 ft²
- Lot area
- 6,000 ft²
- Zoning
- R6A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5167 / 45
- Assessed value
- $2,066,400
- Landmark / historic district
- No
HPD registration #390108, last renewed Oct 7, 2025.
Questions about 2484 Bedford Avenue
Who owns 2484 Bedford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2484 Bedford LLC.
Does 2484 Bedford Avenue have violations?
Yes. NYC HPD has recorded 5 housing violations at this property.
Is 2484 Bedford Avenue rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 32% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
How many apartments are in 2484 Bedford Avenue?
It has 25 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.