58 Argyle Road
Brooklyn, NY 11218BBL 3-05073-0029Map
Owner of record: Argyle Realty Associates
58 Argyle Road is a walk-up apartment building built in 1915 in Brooklyn, 11218. It has 16 residential units across 4 floors. The owner of record is Argyle Realty Associates. HPD has recorded 213 housing violations here, most recently on May 4, 2026. 18 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 213
- DOB violations
- 14
- ECB violations
- 15
- HPD complaints
- 153
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 213
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective outlet at north wall in the 2nd room from east located at apt 4c, 3rd story, 1st apartment from north at east
Jun 24, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective outlet at west wall in the 2nd room from east located at apt 4c, 3rd story, 1st apartment from north at east
Jun 24, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wooden base cabinet at north in the kitchen located at apt 4c, 3rd story, 1st apartment from north at east
Jun 24, 2025 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock assembly at bldg front entrance
May 9, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 4b, 2nd story, 1st apartment from north at east
May 9, 2025 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the bathroom located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the bathroom located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the kitchen , the 1st room from east at south, the foyer located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Open — Not complied with
Show 40 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood door at entrance in the 1st room from east at south located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at 1st window upper sash from north at east in the 1st room from east at south located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north and south wall in the foyer located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east and west wall in the private hallway located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the kitchen located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east , west and south wall in the 2nd room from east at south located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west and south wall in the 1st room from east at south located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at window upper sash at west wall in the 2nd room from east at south located at apt 4c, 3rd story, 1st apartment from north at east
May 7, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood base cabinet at north wall in the kitchen located at apt 4c, 3rd story, 1st apartment from north at east
May 4, 2025 · Apt 4C
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective entrance door in the 1st room from east at south located at apt 4c, 3rd story, 1st apartment from north at east
May 4, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window stuck at upper sash in the 4th room from east located at apt 4c, 3rd story, 1st apartment from north at east
May 4, 2025 · Apt 4C
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north and east walls in the private hallway located at apt 4c, 3rd story, 1st apartment from north at east
May 4, 2025 · Apt 4C
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective at door frame in the 2nd room from east at south located at apt 4c, 3rd story, 1st apartment from north at east
May 4, 2025 · Apt 4C
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... 1 sq. ft. at the ceiling in the 2nd room from east at south located at apt 4b, 8th story, 1st apartment from north at east original violation 16448255 issued 21-nov-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Nov 21, 2023 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 4; in the entire apartment located at apt 4b, 2nd story, 1st apartment from north at east
Nov 21, 2023 · Apt 4B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 1 sq. ft. at the ceiling in the 2nd room from east at south located at apt 4b, 8th story, 1st apartment from north at east
Nov 21, 2023 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective the wood at floor in the foyer located at apt 4b, 2nd story, 1st apartment from north at east
Nov 21, 2023 · Apt 4B
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective the wood at floor in the 4th room from east located at apt 4b, 2nd story, 1st apartment from north at east
Nov 21, 2023 · Apt 4B
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of head board at fire escape window creating a hazard in the 1st room from east at south located at apt 4b, 2nd story, 1st apartment from north at east
Nov 21, 2023 · Apt 4B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the 1st room from north, the 1st room from east at south, the 4th room from east, the bathroom located at apt 4b, 8th story, 1st apartment from north at east
Nov 21, 2023 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1c, 3rd story, 2nd apartment from north at east
Jun 5, 2023 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 3rd story, 2nd apartment from north at east
Jun 5, 2023 · Apt 1C
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 1st room from north at east located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from south at west wall in the 1st room from north at west located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 2nd room from north at west located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Open — Defect letter issued - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from north at east wall in the 1st room from north at east located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at west located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate air conditioner bracket installed and screwed at window for egress in the 2nd room from north at west located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair the broken or defective base cabinet underneath sink, at south wall, in the bathroom located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective uneven wood floor in the private hallway located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the foyer located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the kitchenette located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from west at north wall in the bathroom located at apt 2a, 1st story, 1st apartment from south at west
Apr 6, 2023 · Apt 2A
Open — Defect letter issued
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
Work w/o permit. noted: 18 windows in basement and 2 in boiler room have been sealed with masonary. remedy: obtain permit
Jul 3, 2001
Vw-violation work without permit - active - Construction other optional
Work w/o permit. noted: approx 18 windows in basement and2 in boiler r oom ghave been sealed with masonary. remedy: obtain permits
Jul 2, 2001
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 15
- Class - 2
Work w/o a variance permit contrary to 28-105.12.5.note:work alt 2 facade/lintel repair on going at time of insp (work being performed by deep construction corp).(narinder singh id #1307284)(contractor on job a
Jun 14, 2014 · Penalty $4,000
Resolve - Non-hazardous
Work without a permit. work nted:18 windows in basement and 2 windows in boiler room have been sealed with masonary remedy: obtain permit
Jul 3, 2001 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit. work noted: approx. 18 windows in basement and 2 windows in boiler room have been sealed with masonaryl remedy: obtain a permit if feasible or restore to prior legal condition.
Jul 2, 2001 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit: 18 windows in basement and 2 windows in boiler room have been sealed with masonry. (no new jobs as per computes). re-medy: obtain a permit if feasible or restore to prior legal condition.
Jun 1, 1999 · Penalty $500
Resolve - Non-hazardous
Work without a permit apa 18 windows in basement and 2 windows in the boiler room have been w/o with masonary. remedy obtain a permit if feasible on reslove to prior legal condition.
Feb 2, 1998 · Penalty $2,500
Resolve - Unknown
Failure to maintian glass in windows in that there is cracked glass ina window in the courtyard area at the first floor. remedy:make necessary repairs to the satisfaction fo this department.
Jan 17, 1991 · Penalty $115
Resolve - Unknown
Failure to maintain interior in that water leaks at various locations of basement ceiling have damaged wood joists and flooring of first floor. remedy:make necesary repairs to the satisfaction of this departmen
Jan 17, 1991 · Penalty $575
Resolve - Unknown
Failure to maintain the fire separation at the ceiling in various locations of the basement in that the firerating is missing,exposing the unprotecte wood framing. remedy:make necessary repairs to the satisfact
Jan 17, 1991 · Penalty $115
Resolve - Non-hazardous
Work without a permit in that apx.18 windows in the basement and 2 windows in the boiler room have been closed up with masonary remedy:obtian necessary permits if feasible or restore to prior legal condition.
Jan 17, 1991 · Penalty $285
Resolve - Non-hazardous
Work without a permit in that 2 raised openings at roof have been closed up and roofed over, one at the southeast corner and one at the southeast corner. remedy:obtain necessary permits if feasible or restore p
Jan 17, 1991
Resolve
Show 5 more ↓
- Unknown
Failure to provide a fiveproof enclosure for a boiler room door in that the section over the boiler room door is completely open to the adjoining basement area. remedy:make necessary repairs to the satisfaction
Jan 17, 1991 · Penalty $460
Resolve - Unknown
Failure to provide a handrail in the stairwell between the 4th floor and the roof in that the handrail is loose. remdey:make necessary repairs to the satisfaction of this department.
Jan 17, 1991 · Penalty $55
Resolve - Unknown
Failure to provide protective screening under a skylight in a public staiwell. remedy:provide protective screening.
Jan 17, 1991 · Penalty $115
Resolve - Unknown
Failure to provide a masonry chimney with an appropiate capping in that the cap stone is broken and seperating,located at the staiwell bulkhead. remedy:make necessary repirs to the satisfaction of this departme
Jan 17, 1991 · Penalty $55
Resolve - Unknown
Failure to maintian exterior in that there is a vertical crack in the masonry walol at the north side of the building,in the courtyard,extending through the first and second floors. remedy:make necessary repair
Jan 17, 1991 · Penalty $140
Resolve
Complaints
- Appliance
Electric/gas range
Jul 29, 2025 · Apt 4C
Close - Appliance
Electric/gas range
Jul 29, 2025 · Apt 4C
Close - Flooring/stairs
Floor
Mar 12, 2025 · Apt 4C
Close - Door/window
Window frame
Mar 12, 2025 · Apt 4C
Close - Door/window
Door
Mar 12, 2025 · Apt 4C
Close - General
Cabinet
Mar 12, 2025 · Apt 4C
Close - Plumbing
Bathtub/shower
Mar 12, 2025 · Apt 4C
Close - Water leak
Heavy flow
Mar 12, 2025 · Apt 4C
Close - Electric
Lighting
Mar 12, 2025 · Apt 4C
Close - Door/window
Door frame
Mar 12, 2025 · Apt 4C
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Mar 12, 2025 · Apt 4C
Close - Unsanitary condition
Mold
Nov 13, 2023 · Apt 4B
Close - Paint/plaster
Ceiling
Nov 13, 2023 · Apt 4B
Close - Water leak
Slow leak
Nov 13, 2023 · Apt 4B
Close - Electric
Lighting
Nov 13, 2023 · Apt 4B
Close - Flooring/stairs
Floor
May 24, 2023 · Apt 1C
Close - Paint/plaster
Ceiling
Apr 18, 2023 · Apt 1C
Close - Plumbing
Basin/sink
Apr 18, 2023 · Apt 1C
Close - Paint/plaster
Wall
Apr 18, 2023 · Apt 1C
Close - Unsanitary condition
Pests
Apr 18, 2023 · Apt 1C
Close - Unsanitary condition
Pests
Apr 18, 2023 · Apt 1C
Close - Door/window
Door frame
Apr 18, 2023 · Apt 1C
Close - Plumbing
Basin/sink
Apr 18, 2023 · Apt 1C
Close - Plumbing
Toilet
Apr 18, 2023 · Apt 1C
Close - Unsanitary condition
Mold
Mar 20, 2023 · Apt 2A
Close - Door/window
Window frame
Mar 20, 2023 · Apt 2A
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt 2A
Close - Unsanitary condition
Mold
Feb 3, 2023 · Apt 2A
Close - Appliance
Refrigerator
Feb 3, 2023 · Apt 2A
Close - Door/window
Window frame
Feb 3, 2023 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 3, 2023 · Apt 2A
Close - Plumbing
Basin/sink
Aug 31, 2022 · Apt 1C
Close - Plumbing
Toilet
Aug 31, 2022 · Apt 1C
Close - Door/window
Door
Jul 25, 2022 · Apt 1C
Close - Electric
Lighting
Jun 15, 2022 · Apt 1C
Close - Door/window
Door frame
Jun 15, 2022 · Apt 1C
Close - Unsanitary condition
Pests
Jun 15, 2022 · Apt 1C
Close - Safety
Window guard broken/missing
Jun 15, 2022 · Apt 1C
Close - Plumbing
Toilet
Jun 15, 2022 · Apt 1C
Close - Electric
No lighting
May 17, 2022 · Apt B4
Close - Appliance
Refrigerator
Oct 26, 2021 · Apt 1C
Close - Door/window
Door
Jul 2, 2021 · Apt 1C
Close - Door/window
Window frame
Nov 27, 2019 · Apt 1C
Close - Door/window
Window pane
Nov 27, 2019 · Apt 1C
Close - Plumbing
Water supply
Jul 17, 2019 · Apt 1B
Close - Water leak
Slow leak
May 8, 2019 · Apt 1B
Close - Electric
No lighting
May 8, 2019 · Apt 1B
Close - Water leak
Heavy flow
May 7, 2019 · Apt B1
Close - Unsanitary condition
Pests
Jan 28, 2019 · Apt 3C
Close - General
Bell/buzzer/intercom
Jan 28, 2019 · Apt 3C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1915
- Floors
- 4
- Residential units
- 16
- Building area
- 15,684 ft²
- Lot area
- 5,300 ft²
- Zoning
- R6A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5073 / 29
- Assessed value
- $438,750
- Landmark / historic district
- No
HPD registration #346538, last renewed Jan 20, 2026.
Questions about 58 Argyle Road
Who owns 58 Argyle Road?
The owner of record in NYC Department of City Planning PLUTO data is Argyle Realty Associates.
Does 58 Argyle Road have violations?
Yes. NYC HPD has recorded 213 housing violations at this property.
Is 58 Argyle Road rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 58 Argyle Road built?
City records list 1915 as the year it was built.
How many apartments are in 58 Argyle Road?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.