66 Argyle Road
Brooklyn, NY 11218BBL 3-05073-0032Map
Owner of record: One Liberty LLC
66 Argyle Road is a mixed residential and retail building built in 1931 in Brooklyn, 11218. It has 5 residential units across 2 floors. The owner of record is One Liberty LLC. HPD has recorded 142 housing violations here, most recently on August 21, 2026. 48 of the 50 most recent violations are still open.
- HPD violations
- 142
- DOB violations
- 2
- ECB violations
- 0
- HPD complaints
- 35
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 142
- ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Aug 21, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 21, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 21, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Aug 21, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 21, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Aug 21, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective broken wall cabinet at west wall in the kitchen located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Nov sent out
Show 40 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft observed at ceiling and all walls in the 3rd room from east located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sqft observed at ceiling and south/east/north walls in the 1st room from east located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sqft at ceiling and north wall in the private hallway located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective electric light fixtures at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective connection waste line under washbasin in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sqft observed at ceiling and all walls in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 1o sqft observed at south wall in the kitchen located at apt 1l, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Closed — Violation closed - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the kitchen located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling and south wall in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Aug 9, 2026 · Apt 1L
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage accumulation at north and south yard
Aug 26, 2024
Open — Nov sent out - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Aug 26, 2024
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4, 2nd story, 1st apartment from east at south
Aug 26, 2024 · Apt 4
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4, 2nd story, 1st apartment from east at south
Aug 26, 2024 · Apt 4
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective inoperative intercom system from building front entrance to wall panel at north wall at east 1 room in the entrance located at apt 4, 2nd story, 1st apartment from east at south
Aug 26, 2024 · Apt 4
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2024
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 8, 2021
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Dec 19, 2017
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 5, 2nd story, 1st apartment from south at west
Dec 19, 2017 · Apt 5
Open — Nov certified late - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5; wg to replace = 0; wg to repair = 0; located at apt 5, 2nd story, 1st apartment from south at west
Dec 19, 2017 · Apt 5
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 5, 2nd story, 1st apartment from south at west
Dec 19, 2017 · Apt 5
Open — Nov certified late - BHazardous
Abate the nuisance consisting of roaches located at apt 5, 2nd story, 1st apartment from south at west
Dec 19, 2017 · Apt 5
Open — Nov certified late - BHazardous
Properly repair the broken or defective base cabinet, broken inner surface in the kitchen located at apt 5, 2nd story, 1st apartment from south at west
Dec 19, 2017 · Apt 5
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Dec 19, 2017
Open — Nov sent out - CImmediately hazardous
Replace with new the broken or defective west one window pane at upper sash in the 3rd room from east at north located at apt 5, 2nd story, 1st apartment from south at west
Dec 19, 2017 · Apt 5
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Dec 19, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Dec 19, 2017
Open — Nov sent out
DOB building violations · 2
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Construction other optional
Work without a permit. noted: renovation of entire building (2nd fl) new partition throughout with sheetrock on walls & ceiling, new bath- rooms, & kitchens for 5 apts without approval due to application #300989287 denied/dissaproved. work approx 90% completed. remedy: stop all work. obtain permits if feasible or restore premises
Apr 26, 2001
Vw-violation work without permit - active
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Mold
Aug 18, 2026 · Apt 1L
Close - Paint/plaster
Wall
Aug 18, 2026 · Apt 1L
Close - Appliance
Electric/gas range
Aug 18, 2026 · Apt 1L
Close - General
Cabinet
Aug 18, 2026 · Apt 1L
Close - Water leak
Slow leak
Aug 18, 2026 · Apt 1L
Close - Appliance
Electric/gas range
Aug 8, 2026 · Apt 1L
Close - Electric
Power outage
Aug 8, 2026 · Apt 1L
Close - General
Bell/buzzer/intercom
Jul 30, 2024 · Apt 4
Close - General
Janitor/super
Jul 30, 2024 · Apt 4
Close - Unsanitary condition
Pests
Jul 30, 2024 · Apt 4
Close
Show 25 more ↓
- Unsanitary condition
Pests
Jul 30, 2024 · Apt 4
Close - Unsanitary condition
Garbage/recycling storage
Jul 30, 2024 · Apt 4
Close - Heat/hot water
Apartment only
Jan 7, 2018 · Apt 4
Close - Heat/hot water
Apartment only
Dec 18, 2017 · Apt 5
Close - Safety
Smoke detector
Dec 18, 2017 · Apt 5
Close - Door/window
Window pane
Dec 18, 2017 · Apt 5
Close - Paint/plaster
Wall
Dec 18, 2017 · Apt 5
Close - Plumbing
Radiator
Dec 18, 2017 · Apt 5
Close - Unsanitary condition
Mold
Dec 18, 2017 · Apt 5
Close - Heat/hot water
Apartment only
Oct 25, 2016 · Apt 4
Close - Unsanitary condition
Mold
Oct 25, 2016 · Apt 4
Close - Plumbing
Basin/sink
Oct 25, 2016 · Apt 4
Close - General
Bell/buzzer/intercom
Oct 25, 2016 · Apt 4
Close - Plumbing
Bathtub/shower
Oct 25, 2016 · Apt 4
Close - Unsanitary condition
Garbage/recycling storage
Oct 25, 2016 · Apt PH
Close - Heat/hot water
Apartment only
Feb 15, 2016 · Apt 4
Close - Heating
Heat related
Jan 2, 2014 · Apt 5
Close - Heating
Heat related
Dec 8, 2012 · Apt 4
Close - Heating
Heat related
Feb 12, 2012 · Apt 5
Close - Heating
Heat related
Feb 11, 2012 · Apt 5
Close - Heating
Heat related
Dec 10, 2010 · Apt 5
Close - Plumbing
Water-leaks
Nov 15, 2006 · Apt 1R
Close - Nonconst
Vermin
Nov 15, 2006 · Apt 1R
Close - General
Locks
Nov 15, 2006 · Apt 1R
Close - Paint/plaster
Ceiling
Nov 15, 2006 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S5)
- Year built
- 1931
- Floors
- 2
- Residential units
- 5
- Building area
- 4,106 ft²
- Lot area
- 3,208 ft²
- Zoning
- R6A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5073 / 32
- Assessed value
- $455,400
- Landmark / historic district
- No
HPD registration #302986, last renewed Jul 24, 2025.
Questions about 66 Argyle Road
Who owns 66 Argyle Road?
The owner of record in NYC Department of City Planning PLUTO data is One Liberty LLC.
Does 66 Argyle Road have violations?
Yes. NYC HPD has recorded 142 housing violations at this property.
Is 66 Argyle Road rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 66 Argyle Road built?
City records list 1931 as the year it was built.
How many apartments are in 66 Argyle Road?
It has 5 residential units and 6 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.