418 Bleecker Street
Brooklyn, NY 11237BBL 3-03312-0012Map
Owner of record: 418 Bleecker Street
418 Bleecker Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 418 Bleecker Street. HPD has recorded 19 housing violations here, most recently on May 23, 2024. 11 of the 19 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 19
- DOB violations
- 4
- ECB violations
- 4
- HPD complaints
- 10
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 19
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at building entrance, building front. latch defective.
May 23, 2024
Open — Nov certified late - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
May 23, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 23, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
May 23, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box notice missing at public hall, 1st story
May 23, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 23, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 23, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 7, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 16, 2018
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Nov sent out
Show 9 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Invalid certification - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 1;no stops , no one way screw located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of key operated lock at door leading to room with fire escape window in the 1st room from east located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Invalid certification - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the 1st room from east located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from south at west wall, 1st dumb waiter from east at south wall in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from north at east wall in the 5th room from east located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Certification postponment denied - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 6th room from east located at apt 3l, 3rd story, 1st apartment from north at east
Dec 21, 2013 · Apt 3L
Open — Nov sent out
DOB building violations · 4
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 4
- Class - 1
Failure to comply w/commissioner's vacate order #92/10 issued 3.9.10, apt 2r, 3l. apt 2r occupied at time of visit. remedy: comply w/commissioner's vacate order.
Mar 13, 2010 · Penalty $2,400
Active - Class - 1
Occupancy contrary to that allowed by the dob records or c/o. dob mdr #333322 indicates premises to be a (6) family dwelling. now premises converted to be a (6) family and (6) sros at apt 2r (3) sros at apt 3l
Mar 9, 2010 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit. work noted: at apt 3l & 2r, full height partitions erected creating additional bedroom partitions erected subdividing allrooms. remedy: restore to prior legal condition.
Mar 9, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to provide required means of egress at apt 2r & 3l partitions erected blocking required egress & egress to fire escape. remedy: provide required egress.
Mar 9, 2010 · Penalty $1,600
Resolve
Complaints
- Water leak
Heavy flow
Nov 7, 2023 · Apt 2R
Close - Electric
Power outage
Jul 3, 2015 · Apt 3R
Close - General
Locks
Dec 19, 2013 · Apt BLDG
Close - General
Doors
Dec 19, 2013 · Apt BLDG
Close - General
Stairs
Dec 19, 2013 · Apt BLDG
Close - General
Stairs
Dec 19, 2013 · Apt BLDG
Close - Nonconst
Vermin
Dec 12, 2013 · Apt 3L
Close - Nonconst
Vermin
May 29, 2008 · Apt 3L
Close - Heating
Heat related
Dec 4, 2007 · Apt 2R
Close - Electric
Electric-supply
Mar 18, 2006 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,670 ft²
- Lot area
- 2,700 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3312 / 12
- Assessed value
- $702,000
- Landmark / historic district
- No
HPD registration #333322, last renewed Jul 29, 2026.
Questions about 418 Bleecker Street
Who owns 418 Bleecker Street?
The owner of record in NYC Department of City Planning PLUTO data is 418 Bleecker Street.
Does 418 Bleecker Street have violations?
Yes. NYC HPD has recorded 19 housing violations at this property.
Is 418 Bleecker Street rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 67% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 418 Bleecker Street built?
City records list 1931 as the year it was built.
How many apartments are in 418 Bleecker Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.