roofy

420 Bleecker Street

Brooklyn, NY 11237BBL 3-03312-0014Map

Owner of record: 420 Bleecker Equities LLC

420 Bleecker Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 420 Bleecker Equities LLC. HPD has recorded 49 housing violations here, most recently on August 11, 2026. 4 of the 49 most recent violations are still open.

HPD violations
49
DOB violations
7
ECB violations
2
HPD complaints
101

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 11, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 49

  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Aug 11, 2026 · Apt 1R

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Aug 11, 2026 · Apt 1R

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Jun 28, 2026 · Apt 1R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 3l, 3rd story, 1st apartment from north at east

    Jun 25, 2025 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east

    Jun 25, 2025 · Apt 3L

    Closed — Violation dismissed
  • C

    Repair the roof so that it will not leak over the ceiling in the kitchen located at apt 3l, 3rd story, 1st apartment from north at east

    Jun 25, 2025 · Apt 3L

    Open — Nov sent out
  • C

    Repair the roof so that it will not leak over the ceiling in the 4th room from east located at apt 3l, 3rd story, 1st apartment from north at east

    Jun 25, 2025 · Apt 3L

    Open — Nov sent out
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2025 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2025 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2025 · Apt 3L

    Closed — Violation dismissed
Show 39 more ↓
  • B

    Remove all encumbrances consisting of bikes at public hall, 2nd story

    Jan 27, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at entrance door at public hall, 1st story

    Jan 27, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch set at building entrance door at public hall, 1st story

    Jan 27, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of key operated lock at door to fire escape window in the 6th room from north located at apt 3l, 3rd story, 1st apartment from east at south

    Jan 14, 2025 · Apt 3L

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective frame at public hall, 1st story

    Aug 20, 2024

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 8, 2023 · Apt 3L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north

    Sep 8, 2023 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Jul 29, 2023 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchen located at apt 2l, 2nd story, 1st apartment from west at north

    Jul 29, 2023 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective bell buzzer intercom system at south wall in the foyer located at apt 2l, 2nd story, 1st apartment from west at north

    Jul 29, 2023 · Apt 2L

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 23, 2022

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from east located at apt 3r, 3rd story, 2nd apartment from north at east

    Sep 22, 2021 · Apt 3R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx 3 square feet at east wall in the 1st room from east located at apt 3r, 3rd story, 2nd apartment from north at east

    Sep 22, 2021 · Apt 3R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 3r, 3rd story, 2nd apartment from north at east

    Sep 22, 2021 · Apt 3R

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... approx 4 sq ft at ceiling and east wall in the 1st room from east located at apt 3r, 1st story, 1st apartment from west at north

    Sep 22, 2021 · Apt 3R

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... approx 3 square feet at east wall in the 1st room from east located at apt 3r, 3rd story, 2nd apartment from north at east original violation 14569967 issued 22-sep-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 22, 2021 · Apt 3R

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approx 4 sq ft at ceiling and east wall in the 1st room from east located at apt 3r, 1st story, 1st apartment from west at north original violation 14574568 issued 22-sep-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 22, 2021 · Apt 3R

    Closed — Violation dismissed
  • C

    Repair the roof so that it will not leak at the ceiling in the 4th room from east located at apt 3r, 3rd story, 2nd apartment from north at east

    Jun 25, 2021 · Apt 3R

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 3r, 3rd story, 2nd apartment from north at east

    Jun 25, 2021 · Apt 3R

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of bicycles, shopping carts, and household articles at public hall, 3rd story

    Jun 25, 2021

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of bicycles and shopping carts at public hall, 2nd story

    Jun 25, 2021

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from north located at apt 3r, 3rd story, 1st apartment from south at west

    Apr 5, 2021 · Apt 3R

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Mar 31, 2021

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of bicycle at public hall, 2nd story

    Mar 31, 2021

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of bicyle and househlod items at public hall, 3rd story

    Mar 31, 2021

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of lockable slide bolt at bulkhead door capable of being padlock to roof

    Mar 31, 2021

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 3r, 3rd story, 2nd apartment from north at east

    Sep 16, 2020 · Apt 3R

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Sep 16, 2020

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 16, 2020

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Sep 16, 2020

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 16, 2020

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 16, 2020

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 16, 2020

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard

    Jul 16, 2020

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 7, 2015

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Mar 10, 2015

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of gas range at public hall, 3rd story

    Jan 13, 2015

    Closed — Violation dismissed
  • C

    Replace with new the missing baluster ballustrade at public hall, 2nd story

    Jan 13, 2015

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures for cooking , at kitchen, 3rd story, apartment

    Oct 1, 2010 · Apt 3L

    Closed — Violation dismissed

DOB building violations · 7

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Construction other optional

    Stop all work immediately make site safe, only contact borough comm. o ffice at 718 802-3685

    May 10, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 13, 2016

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed

ECB violations · 2

  • Class - 1

    Failure to comply w/the comm's order contained in nov #35176961x issued on 04/15/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. for installing staircases etc w/o a permit. remedy: comply wit

    Jul 12, 2016

    Resolve
  • Class - 1

    Work w/o a permit. observed city records (hpd #210795) indicate the bldg as 3 sty,6 class'a'apts,"o"at the basement. alteration was performed to the bldg such as 1 staircases were built from 2 1st fl apts into

    Apr 15, 2016 · Penalty $1,600

    Resolve

Complaints

  • Door/window

    Door frame

    Sep 21, 2026 · Apt 3L

    Close
  • General

    Bell/buzzer/intercom

    Sep 21, 2026 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Jun 22, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Jun 12, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Jun 12, 2026 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Jun 12, 2026 · Apt 1R

    Close
  • Water leak

    Slow leak

    Jul 15, 2025 · Apt 3L

    Close
  • Water leak

    Heavy flow

    Jun 22, 2025 · Apt 3L

    Close
  • Water leak

    Damp spot

    Jun 22, 2025 · Apt 3L

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jan 23, 2025 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 10, 2025 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 5, 2025 · Apt 3L

    Close
  • Electric

    Wiring

    Jul 8, 2024 · Apt 1R

    Close
  • Plumbing

    Basin/sink

    Jul 8, 2024 · Apt 1R

    Close
  • Water leak

    Damp spot

    Jun 24, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Mold

    Jun 24, 2024 · Apt 1R

    Close
  • Water leak

    Slow leak

    Jun 24, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 22, 2023 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2023 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Aug 22, 2023 · Apt 3L

    Close
  • Unsanitary condition

    Pests

    Aug 9, 2023 · Apt 2L

    Close
  • Water leak

    Damp spot

    Aug 9, 2023 · Apt 2L

    Close
  • Flooring/stairs

    Stairs

    Aug 9, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Aug 9, 2023 · Apt 2L

    Close
  • Flooring/stairs

    Stairs

    Jul 29, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 28, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 27, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 26, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 25, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 24, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 23, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 22, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 21, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 18, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 16, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 15, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 14, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 9, 2023 · Apt 2L

    Close
  • Unsanitary condition

    Pests

    Jul 9, 2023 · Apt 2L

    Close
  • General

    Bell/buzzer/intercom

    Jul 3, 2023 · Apt 3L

    Close
  • General

    Bell/buzzer/intercom

    Jul 3, 2023 · Apt 2L

    Close
  • Water leak

    Damp spot

    Jun 11, 2023 · Apt 2L

    Close
  • General

    Janitor/super

    May 25, 2023 · Apt 2L

    Close
  • Water leak

    Damp spot

    May 24, 2023 · Apt 2L

    Close
  • Door/window

    Door

    Jul 5, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2022 · Apt 2R

    Close
  • General

    Cooking gas

    Mar 13, 2022 · Apt 2R

    Close
  • Unsanitary condition

    Mold

    Sep 19, 2021 · Apt 3R

    Close
  • Water leak

    Slow leak

    Sep 1, 2021 · Apt 3R

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
5,670 ft²
Lot area
2,700 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3312 / 14
Assessed value
$702,000
Landmark / historic district
No

HPD registration #355505, last renewed Aug 26, 2025.

Questions about 420 Bleecker Street

Who owns 420 Bleecker Street?

The owner of record in NYC Department of City Planning PLUTO data is 420 Bleecker Equities LLC.

Does 420 Bleecker Street have violations?

Yes. NYC HPD has recorded 49 housing violations at this property.

Is 420 Bleecker Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 420 Bleecker Street built?

City records list 1931 as the year it was built.

How many apartments are in 420 Bleecker Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.