930 Hart Street
Brooklyn, NY 11237BBL 3-03237-0020Map
Owner of record: 840 Hart Street LLC
930 Hart Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 840 Hart Street LLC. HPD has recorded 182 housing violations here, most recently on October 1, 2025. 3 of the 50 most recent violations are still open. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 182
- DOB violations
- 5
- ECB violations
- 7
- HPD complaints
- 236
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 182
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door
Oct 1, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt l1, 1st story, 1st apartment from north at east
Oct 1, 2025 · Apt L1
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt l1, 1st story, 1st apartment from north at east
Oct 1, 2025 · Apt L1
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt l1, 1st story, 1st apartment from north at east
Oct 1, 2025 · Apt L1
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt l1, 1st story, 1st apartment from north at east
Oct 1, 2025 · Apt L1
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door , 1st story
Aug 16, 2025
Open — False certification - BHazardous
Properly repair or replace the broken or defective caulking around bathtub in the bathroom located at apt l1, 1st story, 1st apartment from north at east
Aug 16, 2025 · Apt L1
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and south wall in the bathroom located at apt l1, 1st story, 1st apartment from north at east
Aug 16, 2025 · Apt L1
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt l1, 1st story, 1st apartment from north at east
Aug 16, 2025 · Apt L1
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and south wall in the bathroom located at apt l1, 1st story, 1st apartment from north at east
Aug 16, 2025 · Apt L1
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Properly secure the loose wood base cabinet door at west wall in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south
Nov 3, 2024 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective countertop at west wall in the kitchen located at apt 1r, 1st story, 2nd apartment from east at south
Nov 3, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Nov 3, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hotwater exceeds the maximum temperature of 130 degrees in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Oct 16, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hotwater exceeds the maximum temperature of 130 degrees in the entire apartment located at apt 1r, 1st story, 2nd apartment from east at south
Oct 16, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing glass pane at vestibule door at public hall, 1st story
Oct 16, 2024
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the mold at grout between tiles at west in the bathroom located at apt 1r, 1st story, 2nd apartment from east at south
Oct 16, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats at front and rear yard
Oct 16, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at basement entrance at public hall, 1st story
Oct 10, 2024
Closed — Violation dismissed - BHazardous
Replace with new the missing glass pane at vestibule door at public hall, 1st story
Oct 10, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
Oct 10, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective missing balluster (total 1) 2nd from bottom to top at public hall, 1st story
Oct 10, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Oct 10, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective sink base cabinet door in the kitchen located at apt 1r, 1st story
Sep 11, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story
Sep 11, 2024 · Apt 1R
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story
Sep 11, 2024 · Apt 1R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1r, 1st story
Sep 11, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story
Sep 11, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at sink waste line in the kitchen located at apt 1r, 1st story
Sep 11, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1r, 1st story
Sep 11, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Aug 31, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Aug 31, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at roof bulkhead at public hall stairs, 3rd story
Aug 31, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at south wall and ceiling at roof bulkhead at public hall stairs, 3rd story
Aug 31, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Aug 31, 2024 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Aug 31, 2024 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective frame in the entrance located at apt 2l, 2nd story, 1st apartment from north at east
Aug 31, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 2l, 2nd story, 1st apartment from north at east
Aug 31, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Aug 31, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wire at ceiling in the private hallway located at apt 2l, 2nd story, 1st apartment from north at east
Aug 31, 2024 · Apt 2L
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 31, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door
Aug 31, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Aug 31, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at roof bulkhead door at public hall stairs, 3rd story
Aug 31, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall and ceiling at roof bulkhead at public hall stairs, 3rd story
Aug 31, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2024 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Aug 28, 2024 · Apt 1R
Closed — Violation dismissed
DOB building violations · 5
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - active
ECB violations · 7
- Class - 1
Unlawful acts. failure to comply with commissioner's order to obtain permits for summons # 39018113p issued 2/22/2020., comply with commissioner's order
Apr 24, 2026 · Penalty $25,000
Active - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#39018113p issued on 02/22/20 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without permit.at t
Mar 9, 2022 · Penalty $3,125
Active - Class - 1
Failure to comply w/commissioner's order contained in summons/v39018113p issued2/22/20 &to file c/c pursuant to28-201.1&1rcny102-01.comply w/commissioner's order &/or file c/c.
Sep 1, 2021 · Penalty $2,500
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#39018113p issued on 02/22/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. work w/o permit at apt#1l & cellar level.
Jun 17, 2021 · Penalty $3,125
Active - Class - 1
Failure to comply w/the comm's order contained in summons/vio#39018113p issued on 02/22/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's orde
Apr 28, 2021
Resolve - Class - 1
Failure to comply w/ commissioner's order contained in summons/violation#39018113p issued 2/22/20 & to file certificate of correction pursuant to 28-201.1&1rcny102-01 for work w/o permit:note no record of permi
Dec 30, 2020 · Penalty $1,250
Active - Class - 1
Work without a permit. observed illegal construction and domo activities in progress in apt 1l and cellar, removed all partitions walls, that included unsafe, & unauthorized electrical, & plumbing works, diggin
Feb 22, 2020 · Penalty $400
Active
Complaints
- Unsanitary condition
Mold
Aug 5, 2025 · Apt L1
Close - Plumbing
Bathtub/shower
Aug 5, 2025 · Apt L1
Close - Heat/hot water
Apartment only
Dec 7, 2024 · Apt 1R
Close - Water leak
Damp spot
Aug 26, 2024 · Apt 2L
Close - Door/window
Door
Aug 26, 2024 · Apt BLDG
Close - Safety
Smoke detector
Aug 26, 2024 · Apt 1R
Close - Safety
Carbon monoxide detector
Aug 26, 2024 · Apt 1R
Close - Safety
Window guard broken/missing
Aug 26, 2024 · Apt 1R
Close - Plumbing
Toilet
Aug 26, 2024 · Apt 1R
Close - Plumbing
Basin/sink
Aug 26, 2024 · Apt 1R
Close
Show 40 more ↓
- Paint/plaster
Wall
Aug 26, 2024 · Apt 1R
Close - Paint/plaster
Ceiling
Aug 26, 2024 · Apt 1R
Close - Plumbing
Basin/sink
Aug 26, 2024 · Apt 1R
Close - Plumbing
Basin/sink
Aug 26, 2024 · Apt 1R
Close - Flooring/stairs
Floor
Aug 26, 2024 · Apt 1R
Close - Paint/plaster
Ceiling
Aug 26, 2024 · Apt 1R
Close - Paint/plaster
Wall
Aug 26, 2024 · Apt 1R
Close - Unsanitary condition
Mold
Aug 26, 2024 · Apt 1L
Close - Safety
Smoke detector
Aug 26, 2024 · Apt 1L
Close - Safety
Carbon monoxide detector
Aug 26, 2024 · Apt 1L
Close - Paint/plaster
Wall
Aug 26, 2024 · Apt 2L
Close - Unsanitary condition
Pests
Aug 26, 2024 · Apt 2L
Close - Unsanitary condition
Pests
Aug 26, 2024 · Apt 2L
Close - Door/window
Door
Aug 26, 2024 · Apt 2L
Close - Safety
Smoke detector
Aug 26, 2024 · Apt 2L
Close - Safety
Carbon monoxide detector
Aug 26, 2024 · Apt 2L
Close - Flooring/stairs
Floor
Aug 26, 2024 · Apt 2L
Close - Unsanitary condition
Pests
Aug 26, 2024 · Apt 1R
Close - Electric
Wiring
Aug 26, 2024 · Apt 2L
Close - Electric
Wiring
Aug 26, 2024 · Apt 2L
Close - Safety
Fire escape
Aug 26, 2024 · Apt BLDG
Close - Door/window
Door
Aug 26, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 26, 2024 · Apt BLDG
Close - Water leak
Damp spot
Aug 26, 2024 · Apt BLDG
Close - Flooring/stairs
Stairs
Aug 26, 2024 · Apt BLDG
Close - Flooring/stairs
Floor
Aug 26, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 26, 2024 · Apt 2L
Close - Safety
Fire escape
Aug 26, 2024 · Apt BLDG
Close - Flooring/stairs
Floor
Aug 26, 2024 · Apt BLDG
Close - Paint/plaster
Wall
Aug 26, 2024 · Apt BLDG
Close - Flooring/stairs
Floor
Aug 26, 2024 · Apt BLDG
Close - Paint/plaster
Ceiling
Aug 26, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 26, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 26, 2024 · Apt 1R
Close - Heat/hot water
Entire building
Jun 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 25, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Jul 18, 2022 · Apt 1R
Close - Door/window
Door
Jul 11, 2022 · Apt 3L
Close - Safety
Smoke detector
Jul 11, 2022 · Apt 3L
Close - Safety
Carbon monoxide detector
Jul 11, 2022 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,100 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3237 / 20
- Assessed value
- $631,350
- Landmark / historic district
- No
HPD registration #355266, last renewed Jul 14, 2025.
Questions about 930 Hart Street
Who owns 930 Hart Street?
The owner of record in NYC Department of City Planning PLUTO data is 840 Hart Street LLC.
Does 930 Hart Street have violations?
Yes. NYC HPD has recorded 182 housing violations at this property.
Is 930 Hart Street rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 33% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 930 Hart Street built?
City records list 1931 as the year it was built.
How many apartments are in 930 Hart Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.