924 Hart Street
Brooklyn, NY 11237BBL 3-03237-0018Map
Owner of record: 924 Hart St HDFC
924 Hart Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 6 residential units across 3 floors. The owner of record is 924 Hart St HDFC. HPD has recorded 30 housing violations here, most recently on May 4, 2026.
- HPD violations
- 30
- DOB violations
- 11
- ECB violations
- 0
- HPD complaints
- 17
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 30
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the 1st room from north located at apt 2l, 2nd story, 1st apartment from east at south
Feb 3, 2026 · Apt 2L
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Feb 3, 2026 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1l, 1st story, 1st apartment from east at south
Oct 10, 2025 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door
Oct 10, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures
Aug 2, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Jul 30, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 2l , 2nd story, 1st apartment from east at south
Sep 26, 2023 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective bulkhead door at public hall, 3rd story
Sep 26, 2023
Closed — Violation closed
Show 20 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. at boiler room
Sep 26, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 9, 2021
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors ... in the entrance located at apt 2l , 2nd story, 1st apartment from east at south
Jul 25, 2019 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Jul 25, 2019
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 3rd story
Jul 25, 2019
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2018 · Apt 1L
Closed — Violation closed - BHazardous
Properly repair the broken or defective spring balances at the west upper sash window in the 1st room from north located at apt 1l, 1st story, 1st apartment from west at north
Feb 13, 2018 · Apt 1L
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 3rd story
Jul 20, 2017
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant at ceiling at public hall, 3rd story
Jul 20, 2017
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 3rd story
Jul 20, 2017
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 20, 2017
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 20, 2017
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors at bulkhead door to roof
Jul 22, 2014
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of a double-cylinder, key-operated lock on door at bulkhead to roof at public hall
Jul 22, 2014
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes television cable running across gooseneck ladder at roof at fire escape at east
Jul 22, 2014
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following ...100 watts minimum required
Sep 16, 2010
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following .. a minimum 100 watts of incandescent lighting required..
Sep 9, 2010
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retarded ceiling 3 sty public hall
Sep 6, 1998
Closed — Violation closed - BHazardous
Properly repair the broken or defective intercom system 1 sty east apt 1l to 1 sty vestibule public hall located at apt 1l
Sep 6, 1998 · Apt 1L
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts incandescent.
Feb 5, 1991
Closed — Violation dismissed
DOB building violations · 11
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt 1R
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt 2R
Close - Heat/hot water
Entire building
Aug 1, 2025 · Apt 1R
Close - Heat/hot water
Entire building
Oct 9, 2023 · Apt 1L
Close - Heat/hot water
Entire building
Mar 24, 2023 · Apt 1R
Close - Heat/hot water
Entire building
Mar 24, 2023 · Apt 1L
Close - Heat/hot water
Entire building
Mar 23, 2023 · Apt 2R
Close - Heat/hot water
Entire building
Mar 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2023 · Apt 1R
Close
Show 7 more ↓
- Heat/hot water
Entire building
Mar 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2023 · Apt 3L
Close - Heat/hot water
Entire building
Mar 20, 2023 · Apt 2L
Close - Heat/hot water
Entire building
Mar 20, 2023 · Apt 1L
Close - General
Mold
Jan 26, 2005 · Apt 3L
Close - General
Windows
Jan 26, 2005 · Apt 3L
Close - General
Mold
Apr 6, 2004 · Apt 3-L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 5,100 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3237 / 18
- Assessed value
- $459,450
- Landmark / historic district
- No
HPD registration #321111, last renewed Sep 22, 2025.
Questions about 924 Hart Street
Who owns 924 Hart Street?
The owner of record in NYC Department of City Planning PLUTO data is 924 Hart St HDFC.
Does 924 Hart Street have violations?
Yes. NYC HPD has recorded 30 housing violations at this property.
Is 924 Hart Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 924 Hart Street built?
City records list 1931 as the year it was built.
How many apartments are in 924 Hart Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.