912 Hart Street
Brooklyn, NY 11237BBL 3-03237-0014Map
Owner of record: 464 Pulaski Street LLC
912 Hart Street is a walk-up apartment building built in 1931 in Brooklyn, 11237. It has 4 residential units across 2 floors. The owner of record is 464 Pulaski Street LLC. HPD has recorded 110 housing violations here, most recently on May 29, 2025.
- HPD violations
- 110
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 55
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 110
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at building front entrance door
May 29, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 4th room from east located at apt 1r, 1st story, 1st apartment from west at north
May 29, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at door in the entrance located at apt 1r, 1st story, 1st apartment from west at north
May 29, 2025 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at door in the entrance located at apt 1l, 1st story, 1st apartment from east at south
May 29, 2025 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats at front yard
Oct 16, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective glass panel at building front entrance door at public hall
Sep 18, 2024
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts at building front at public hall
Sep 18, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of houldhold items at public hall, 1st story
Sep 11, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the excessive garbage bags consisting of construction materials at building front
Sep 11, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective glass pane at building front entrance door at public hall, 1st story
Sep 11, 2024
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at vesitbule at public hall, 1st story
Sep 11, 2024
Closed — Violation dismissed - BHazardous
Replace with new the missing replace missing heavy duty lock set at buiilding front entrance, at vestibule door at public hall, 1st story
Sep 11, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule door at public hall, 1st story
Sep 11, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective at the ceiling and west wall at public hall, 2nd story
Aug 20, 2024
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and south walls in the bathroom located at apt 1r, 1st story, 2nd apartment from north at east
Aug 20, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 2nd apartment from north at east
Aug 20, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq.ft at ceiling, north and south walls. in the bathroom located at apt 1r, 1st story, 2nd apartment from north at east
Aug 20, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 2nd apartment from north at east
Aug 20, 2024 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall at public hall, 1st story
Aug 20, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and north wall at public hall, 1st story
Aug 20, 2024
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Aug 20, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, west wall at public hall, 2nd story
Aug 20, 2024
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak at ceiling at public hall, 2nd story
Aug 20, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the building entrance door , 1st story
Aug 20, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1r, 1st story, 2nd apartment from north at east
Aug 20, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 2nd apartment from north at east
Aug 20, 2024 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jul 31, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 31, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 31, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 31, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 31, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 31, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 31, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jul 31, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Jul 3, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jul 3, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door knob at vestibule door , 1st story
Jul 3, 2024
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing rope tied in a knot at vestibule door , 1st story
Jul 3, 2024
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jul 3, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 29, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 29, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door at public hall , 1st story
May 29, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
May 29, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
May 29, 2024
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Safety
Window guard broken/missing
May 1, 2026 · Apt 2R
Close - Unsanitary condition
Pests
Aug 16, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Aug 16, 2024 · Apt 1R
Close - Door/window
Door
Aug 16, 2024 · Apt 1R
Close - Unsanitary condition
Mold
Aug 16, 2024 · Apt 1L
Close - Outside building
Roof door/hatch
Aug 16, 2024 · Apt PH
Close - Unsanitary condition
Garbage/recycling storage
May 6, 2024 · Apt BLDG
Close - Outside building
Roof door/hatch
May 15, 2023 · Apt PH
Close - Unsanitary condition
Pests
May 15, 2023 · Apt 2L
Close - Unsanitary condition
Pests
May 15, 2023 · Apt 2L
Close
Show 40 more ↓
- Safety
Window guard broken/missing
May 15, 2023 · Apt 2L
Close - Paint/plaster
Ceiling
May 15, 2023 · Apt 2L
Close - Plumbing
Water supply
May 15, 2023 · Apt 2L
Close - Safety
Carbon monoxide detector
May 15, 2023 · Apt 2L
Close - Unsanitary condition
Mold
May 15, 2023 · Apt 1L
Close - Safety
Window guard broken/missing
May 15, 2023 · Apt 1L
Close - Safety
Smoke detector
May 15, 2023 · Apt 1L
Close - Safety
Carbon monoxide detector
May 15, 2023 · Apt 1L
Close - Door/window
Door
May 15, 2023 · Apt 1L
Close - Plumbing
Water supply
May 15, 2023 · Apt 1L
Close - Unsanitary condition
Pests
May 15, 2023 · Apt 1L
Close - Unsanitary condition
Pests
May 15, 2023 · Apt 1L
Close - Safety
Smoke detector
May 15, 2023 · Apt 2L
Close - Unsanitary condition
Garbage/recycling storage
Apr 14, 2022 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 15, 2022 · Apt BLDG
Close - Safety
Carbon monoxide detector
Feb 1, 2022 · Apt PVT
Close - Safety
Smoke detector
Feb 1, 2022 · Apt PVT
Close - Safety
Window guard broken/missing
Sep 7, 2021 · Apt 3L
Close - Unsanitary condition
Mold
Sep 3, 2021 · Apt 3L
Close - Unsanitary condition
Pests
Sep 3, 2021 · Apt 3L
Close - Unsanitary condition
Pests
Sep 3, 2021 · Apt 3L
Close - Door/window
Window frame
Nov 29, 2017 · Apt 1R
Close - Unsanitary condition
Pests
Nov 29, 2017 · Apt 1R
Close - Water leak
Heavy flow
Nov 29, 2017 · Apt 1R
Close - Door/window
Window frame
Nov 29, 2017 · Apt 1R
Close - Unsanitary condition
Pests
Nov 29, 2017 · Apt 1R
Close - Appliance
Refrigerator
Nov 29, 2017 · Apt 1R
Close - Flooring/stairs
Floor
Nov 29, 2017 · Apt 1R
Close - Door/window
Door
Nov 29, 2017 · Apt 1R
Close - Paint/plaster
Wall
Jun 18, 2016 · Apt 1
Close - Paint/plaster
Wall
Apr 26, 2016 · Apt 1STFL
Close - Plumbing
Bathtub/shower
Apr 26, 2016 · Apt 1STFL
Close - Flooring/stairs
Floor
Apr 26, 2016 · Apt 1STFL
Close - Door/window
Window frame
Apr 26, 2016 · Apt 1STFL
Close - General
Cabinet
Apr 26, 2016 · Apt 1STFL
Close - Unsanitary condition
Mold
Apr 26, 2016 · Apt 1STFL
Close - Heat/hot water
Entire building
Apr 1, 2015 · Apt 1L
Close - Heat/hot water
Entire building
Apr 1, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 1, 2015 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 15, 2015 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C3)
- Year built
- 1931
- Floors
- 2
- Residential units
- 4
- Building area
- 3,000 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3237 / 14
- Assessed value
- $382,500
- Landmark / historic district
- No
HPD registration #319196, last renewed Jul 11, 2025.
Questions about 912 Hart Street
Who owns 912 Hart Street?
The owner of record in NYC Department of City Planning PLUTO data is 464 Pulaski Street LLC.
Does 912 Hart Street have violations?
Yes. NYC HPD has recorded 110 housing violations at this property.
Is 912 Hart Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 912 Hart Street built?
City records list 1931 as the year it was built.
How many apartments are in 912 Hart Street?
It has 4 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.