1183 Fulton Street
Brooklyn, NY 11216BBL 3-02000-0045Map
Owner of record: Spencer Pl. Realty LLC
1183 Fulton Street is a walk-up apartment building built in 1910 in Brooklyn, 11216. It has 14 residential units across 6 floors. The owner of record is Spencer Pl. Realty LLC. HPD has recorded 185 housing violations here, most recently on December 6, 2025. 1 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2024.
- HPD violations
- 185
- DOB violations
- 23
- ECB violations
- 33
- HPD complaints
- 294
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 185
- BHazardous
Replace with new the missing shower faucet handle at west in the 4th bathroom from east located at apt 6b, 6th story, 1st apartment from west at north
Dec 6, 2025 · Apt 6B
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 2nd story balcony at fire escape stack at building front
Aug 21, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Aug 21, 2024 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Aug 21, 2024 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of kick down door stop permanently installed at building entrance door
Aug 21, 2024
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Aug 21, 2024 · Apt 3R
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Aug 21, 2024 · Apt 3R
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 10, 2024
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 10, 2023
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 2nd room from north at east located at apt 5a, 5th story, 2nd apartment from west at north
May 10, 2023 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at the ceiling and north wall at public hall stairs, 6th story
May 10, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling and north wall at public hall stairs, 6th story
May 10, 2023
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at the ceiling at public hall stairs, 6th story
May 10, 2023
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from west at north
May 10, 2023 · Apt 5A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 5a, 5th story, 2nd apartment from west at north
May 10, 2023 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 2nd room from north at east located at apt 5a, 5th story, 2nd apartment from west at north
May 10, 2023 · Apt 5A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall at the intermediate landing at public hall stairs, 3rd story
May 7, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling above the intermediate landing at public hall stairs, 3rd story
May 7, 2023
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at east located at apt 5a, 5th story, 2nd apartment from west at north
May 7, 2023 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling. in the 2nd room from north at east located at apt 5a, 5th story, 2nd apartment from west at north
May 7, 2023 · Apt 5A
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 22, 2023
Closed — Violation dismissed - BHazardous
Fire escape defective. fill in holes in wall around brackets and/or rails at 6th story balcony at west at fire escape
Jan 3, 2023
Closed — Violation closed - BHazardous
Fire escape defective. fill in holes in wall around brackets and/or rails at 5th story balcony at west at fire escape
Jan 3, 2023
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots all stories, west stack at building front
Mar 18, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Aug 2, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Aug 2, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain glaze for bathtub in the bathroom located at apt 4l, 4th story, 1st apartment from south at west
Aug 2, 2021 · Apt 4L
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at front entrance located at apt 4l, 4th story, 1st apartment from south at west
Aug 2, 2021 · Apt 4L
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4l, 4th story, 1st apartment from south at west
Aug 2, 2021 · Apt 4L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartment located at apt 4l, 4th story, 1st apartment from south at west
Aug 2, 2021 · Apt 4L
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Aug 2, 2021
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors leading to cellar at public hall, 1st story
Aug 2, 2021
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors at bulkhead to roof
Aug 2, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings at all stories at public hall
Aug 2, 2021
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at front entrance located at apt 2l, 2nd story, 1st apartment from south at west
Aug 2, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom from north located at apt 2l, 2nd story, 1st apartment from south at west
Aug 2, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom from north located at apt 2l, 2nd story, 1st apartment from south at west
Aug 2, 2021 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors leading to rear yard , 1st story
Aug 2, 2021
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... 6 square feet ceiling, 4 square feet west wall in the bathroom from north located at apt 2l, 2nd story, 1st apartment from south at west
Aug 2, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building rear yard
Aug 2, 2021
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at the ceiling (2 sq ft) in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west original violation 14399194 issued 18-jun-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jun 18, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of metal bed frames and other house hold items at public hall, 1st story
Jun 18, 2021
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood tread, 16th from the bottom up at public hall stairs, 1st story
Jun 18, 2021
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Jun 18, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jun 18, 2021 · Apt 2L
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jun 18, 2021 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jun 18, 2021 · Apt 2L
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at the ceiling (2 sq ft) in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west
Jun 18, 2021 · Apt 2L
Closed — Violation closed
DOB building violations · 23
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 26, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 11, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 11, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 8, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed
Show 13 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 28, 1994
Vh*-violation hazardous dismissed - Construction other optional
C-construction other optional
Oct 27, 1988
Dob violation - dismissed
ECB violations · 33
- Class - 1
Unlawful acts.failure to comply with an order of the commissioner respondent failed to correct the condition(s) cited in the nov#351352053. sated first floor duplex stair to cellar (apprx 10 risers)installed w/
Dec 31, 2015
Resolve - Class - 1
Filed a certificate of correction or other related materials containing material false statement(s) respondent filed a certificae of correc tion on 8-26-15 for nov#35135205j. upon inspection, found that the con
Dec 31, 2015
Resolve - Class - 2
Failure to comply w/commissioner's order to file a certificate of correction w/the dob. respondent failed to comply w/the commissioner's order to correct the violating condition(s) and file a certificate of cor
Dec 31, 2015
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: first flr duplex stair to cellar (apprx 10 risers) installed w/o handrail. rmdy: install handrail.
Jun 5, 2015
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments for job #320521100 dated 11-21-12 noted: at cellar mechanical room with 7 water heater shown on plan-found no mechanical room
Jun 5, 2015
Resolve - Class - 2
Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35090506r issued on 7/10/14 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Feb 4, 2015 · Penalty $400
Resolve - Class - 2
Failure to comply w/the comm's order to file a cert of correction w/the dob for notice of vio#35086295y issued on 09/13/2014.pursuant to 28-204.4 & 1rcny 102-01.rem:file a cert of correction.
Jan 9, 2015
Resolve - Class - 2
Failure to comply w/ the commissioner's order to file a certificate ofcorrection w/ the dept. of bldg for notice of vio. # 35090506r issued on 07/10/14 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a certif
Nov 25, 2014 · Penalty $800
Resolve - Class - 1
Work w/o a permit.inspection time:12:01 pm. @ time of insp.i observed installation of new sprinkler service water main in cellar.new sprinkler was also installed on floors 5+6 fl.apt.& egress(aear).@ this time
Nov 17, 2014 · Penalty $800
Resolve - Class - 2
Failure to provide approved accepted plans at job site at time of inspection. noted: ongoing construction operations under job permit #320588510 alt 1 w/8 workers at site w/o a set of approved plans. work compl
Nov 12, 2014 · Penalty $250
Resolve
Show 23 more ↓
- Class - 1
Failure to safeguard all persons & property affected by construction operations: failure to comply w/tenants protection plan. noted at time of inspection observed at all floors dust & debris on the public hallw
Nov 12, 2014 · Penalty $2,400
Resolve - Class - 1
Work w/o permit. ongoing construction operations at job site & observed at time of inspection at 4pm installation of new plumbing lines at cellar 6th & 5th floors for kitchens,bathrooms & (gat) hot water tanks
Nov 12, 2014 · Penalty $800
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no guard rails. note: no guard rails or other protection observed over several openings on both the 5th & 6th floors. also, n
Sep 13, 2014 · Penalty $2,400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no handrails observed between the 5th & 6th floors stairway. remedy: provide handrails on stairwell.
Sep 13, 2014 · Penalty $1,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirement. noted: construction debris & materials strewn all over the 5th & 6th floors. remedy: maintain adequate housekeeping.
Sep 13, 2014 · Penalty $800
Resolve - Class - 2
Occupancy contrary to that allowed by c of o & dept of bldgs records 1story class"a"apt duplexed into cellar,partitions erected creating useof rooms for sleeping & living full bathroom @ cellar level w/ water c
Aug 26, 2014 · Penalty $1,200
Resolve - Class - 2
Fail to comply w/commissioner order to file a c of c w/the dob.violation issued 6/4/2014 for work w/o permit for dryers & wash machines in cellar ecb #35066578x.@ time of my insp cellar laundry area is in the s
Jul 30, 2014 · Penalty $800
Resolve - Class - 1
Unlawfully continued work while on notice of a swo. full swo 35096096k, 070714er03sp02 issued 7/7/14 for inadequate housekeeping. observed @time of insp 2-male workers doing brick work contrary to swo.comply w/
Jul 10, 2014 · Penalty $4,800
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. noted: at & around sidewalk shed,pipe scaffold & fire escape is excessive construction debris throughout. make safe & free from any obstructio
Jul 7, 2014 · Penalty $2,400
Resolve - Class - 1
Sec. 28-104.8.4 tenant protection plan noted: existing multiple dwelling partially occupied. work ongoing contractor erecting a 2 story vertical extension to create a 6 story bldg when complete. no tpp for
Jul 7, 2014 · Penalty $1,600
Resolve - Class - 1
Work w/o a permit.installation of new gas dryers & new washing machines in cellar.no permits or records for work performed.rem:obtain permit.
Jun 4, 2014 · Penalty $1,600
Resolve - Class - 1
Work w/o a permit.installation of illegal by passed gas meter in cellar.bypassed gas meter is for the commercial space only.owner has installed new gas piping & fitting to illegally supply gas from commercial s
Jun 4, 2014 · Penalty $1,600
Resolve - Class - 2
Fail to provide electrical continuity for metal raceways enclosures, cable armor. remedy: provide effective electrical continuity.
Jun 4, 2014 · Penalty $600
Resolve - Class - 1
Fail to institute/maintain safety equip measures/temp const no gaurd rails.note:permit #320588510 obtain for 2 story verticle addition to existing 4 story bldg.note:@ 6 story stair opening & @ roof skylight ope
Jun 4, 2014
Resolve - Class - 2
Ec 590.8 amendment. pvc use for lighting raceway in sidewalk shed. such lighting shall be installed in a metal raceway approved for outdoor use. remedy: comply with ec code.
Jun 4, 2014
Resolve - Class - 1
903.2.10.6 misc vio.failure to provide system of automatic sprinklers where required.@ time of insp i observed(2)gas fired dryers in cellar.no sprinklers in cellar.rem:provide automatic sprinnklers.
Jun 4, 2014 · Penalty $1,000
Resolve - Class - 1
Ec 250.4. non current carrying electrical conductive material is not grounded. sidewalk shed is metal & could be energized. remedy: comply with ec code.
Jun 4, 2014 · Penalty $1,600
Resolve - Class - 2
Fail to maintain adequate housekeeping per section requirements.note:an accumulation of const scrap material scattered @ verious location @ 5th & 6 fls addition creating a tripping hazard @ const site.pieces of
Jun 4, 2014 · Penalty $800
Resolve - Class - 2
Failure to provide approved/accepted plans at job site. at time of inspection. note: at time of inspection at cellar level metal studs for partition walls erected, new plumbing and electrical lines installed
Jul 8, 2013 · Penalty $500
Resolve - Class - 2
Occupancy contrary to that allowed by c/o and dob records. 3 sty class'a' apt converted into 5 sros w/2 bathtubs installed. inadequate lightand ventilation. also kitchen w/kitchen sink and gas range. used as
Jun 14, 2013 · Penalty $6,000
Resolve - Non-hazardous
B4a,16,32a,34a,44a,48a,50a,50b,50c,50d. 50a)boiler safety valve discharge pipe is reduced. 58b)both prescontrols piped to boiler on one 1/4 tapping. 50c)back flow preventor not piped down. 50d)holes in boiler
Aug 27, 2003
Resolve - Hazardous
Failure to maintain exterior brick wall. defect noted: loose brick atthe top n/e corner of building at the roof level, adjacent to vacant lot to east. remedy: remove all loose brick immediately and make rep
Apr 9, 1994 · Penalty $175
Resolve - Non-hazardous
Failure to maitnain exterior building wall. remedy: repair defectivebrickwork at 4th story.
Oct 27, 1988 · Penalty $125
Resolve
Complaints
- Water leak
Heavy flow
Sep 11, 2026 · Apt 6B
Close - Plumbing
Toilet
Sep 11, 2026 · Apt 6B
Close - Unsanitary condition
Pests
Aug 15, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 6B
Close - Unsanitary condition
Mold
Jun 26, 2025 · Apt 4R
Close - General
Ventilation system
Jun 26, 2025 · Apt 4R
Close - Door/window
Window frame
Jan 9, 2025 · Apt 5B
Close - Heat/hot water
Apartment only
Jan 9, 2025 · Apt 5B
Close - Unsanitary condition
Pests
Jul 12, 2024 · Apt 5A
Close - Unsanitary condition
Pests
Jul 12, 2024 · Apt 5A
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jul 12, 2024 · Apt 3R
Close - Unsanitary condition
Pests
Jul 12, 2024 · Apt 3R
Close - Safety
Smoke detector
Jul 12, 2024 · Apt 3R
Close - Safety
Carbon monoxide detector
Jul 12, 2024 · Apt 3R
Close - Unsanitary condition
Pests
Jul 12, 2024 · Apt 2R
Close - Unsanitary condition
Pests
Jul 12, 2024 · Apt 2R
Close - Plumbing
Bathtub/shower
Mar 18, 2024 · Apt 6B
Close - Plumbing
Basin/sink
Mar 18, 2024 · Apt 6B
Close - Unsanitary condition
Mold
Mar 18, 2024 · Apt 6B
Close - Water leak
Damp spot
Mar 18, 2024 · Apt 6B
Close - Plumbing
Bathtub/shower
Mar 18, 2024 · Apt 6B
Close - Unsanitary condition
Mold
Mar 18, 2024 · Apt 6B
Close - Plumbing
Basin/sink
Mar 18, 2024 · Apt 6B
Close - Outside building
Roofing
Jan 29, 2024 · Apt 6B
Close - Door/window
Door
Jan 29, 2024 · Apt 6B
Close - Door/window
Door
Jan 29, 2024 · Apt 6B
Close - Unsanitary condition
Mold
Jan 29, 2024 · Apt 6B
Close - Paint/plaster
Ceiling
Jan 29, 2024 · Apt 6B
Close - Water leak
Heavy flow
Jan 29, 2024 · Apt 6B
Close - Door/window
Door
Jan 22, 2024 · Apt 5A
Close - General
Bell/buzzer/intercom
Jan 22, 2024 · Apt 5A
Close - Door/window
Door
Jan 22, 2024 · Apt 5A
Close - Unsanitary condition
Pests
Jan 15, 2024 · Apt 3R
Close - Heat/hot water
Entire building
Dec 26, 2023 · Apt BLDG
Close - Water leak
Damp spot
May 4, 2023 · Apt 5A
Close - Paint/plaster
Wall
May 4, 2023 · Apt 5A
Close - Unsanitary condition
Mold
May 4, 2023 · Apt 5A
Close - Heat/hot water
Apartment only
Dec 24, 2022 · Apt 5B
Close - Heat/hot water
Apartment only
Jan 25, 2022 · Apt 2R
Close - Door/window
Door
Jul 29, 2021 · Apt BLDG
Close - Outside building
Roof door/hatch
Jul 29, 2021 · Apt BLDG
Close - Paint/plaster
Wall
Jul 29, 2021 · Apt BLDG
Close - Safety
Fire escape
Jul 29, 2021 · Apt BLDG
Close - Door/window
Door
Jul 29, 2021 · Apt BLDG
Close - Safety
Fire escape
Jul 29, 2021 · Apt 5D
Close - Safety
Fire escape
Jul 29, 2021 · Apt 5B
Close - Unsanitary condition
Pests
Jul 29, 2021 · Apt 5B
Close - Safety
Fire escape
Jul 29, 2021 · Apt 6B
Close - Safety
Fire escape
Jul 29, 2021 · Apt 4L
Close - Safety
Window guard broken/missing
Jul 29, 2021 · Apt 4L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1910
- Floors
- 6
- Residential units
- 14
- Building area
- 14,334 ft²
- Lot area
- 3,250 ft²
- Zoning
- R7D
- Community board
- 303
- Council district
- 36
- Block / lot
- 2000 / 45
- Assessed value
- $1,327,950
- Landmark / historic district
- No
HPD registration #325745, last renewed Oct 6, 2025.
Questions about 1183 Fulton Street
Who owns 1183 Fulton Street?
The owner of record in NYC Department of City Planning PLUTO data is Spencer Pl. Realty LLC.
Does 1183 Fulton Street have violations?
Yes. NYC HPD has recorded 185 housing violations at this property.
Is 1183 Fulton Street rent stabilized?
NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 100% of its 14 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1183 Fulton Street built?
City records list 1910 as the year it was built.
How many apartments are in 1183 Fulton Street?
It has 14 residential units and 15 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.