1262 Broadway
Brooklyn, NY 11221BBL 3-01623-0039Map
Owner of record: 1262 Broadway Equities LLC
1262 Broadway is an elevator apartment building built in 1931 in Brooklyn, 11221. It has 29 residential units across 6 floors. The owner of record is 1262 Broadway Equities LLC. HPD has recorded 14 housing violations here, most recently on January 14, 2021. 5 of the 14 most recent violations are still open. City tax records listed 29 rent-stabilized apartments here in 2024.
- HPD violations
- 14
- DOB violations
- 17
- ECB violations
- 19
- HPD complaints
- 26
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Jan 14, 2021 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at apartment in the entrance located at apt 5a, 5th story, 1st apartment from east at south
Jan 14, 2021 · Apt 5A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130.f degrees at hot water fixtures, found temperature of 138.f degrees in kitchen & bathroom, . in the entire apartment located at apt 5a, 5th story, 1st apartment from east at south
Jan 14, 2021 · Apt 5A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 4c, 4th story, 2nd apartment from west at north
Nov 10, 2020 · Apt 4C
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Nov 10, 2020
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Nov 10, 2020
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Nov 10, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 6, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... at public hall, 1st story
Aug 6, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Aug 6, 2019
Closed — Violation dismissed
Show 4 more ↓
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 6, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 6, 2019
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Aug 6, 2019
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 6, 2019
Closed — Violation dismissed
DOB building violations · 17
- Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 28, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 25, 2020
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 4, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 4, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 13, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Feb 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 20, 2018
Dob violation - resolved
Show 7 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - dismissed - Construction other optional
Failure to provide approval plans at job site at time of inspection
Sep 30, 2009
Dob violation - dismissed - Construction other optional
Work without a permit; remedy; stop all work/renew permit
Sep 30, 2009
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Sep 26, 2000
Dob violation - dismissed - Construction other optional
Work w/o a permit: noted: seven metal columns and six wood columns wit h wood beams installed at cellar sheetrock partition constructed at fi rst story west section created room and mezzanine remedy: obtain a permit if feasible or restore the premises to prior l egal condition
Sep 26, 2000
Vw*-violation - work w/o permit dismissed
ECB violations · 19
- Class - 2
Inadequate housekeeping.at the time of my inspection,i observed debrisand other construction materials on several floors throughout the building as well as water in the basement.the debris consisted of sheetroc
Dec 6, 2019 · Penalty $625
Resolve - Class - 2
Bc330372-fire extinguishers.at the time of my inspection i observed multiple violations regarding fire extinguishers throughout the buildingone needed to be re-charged,and several others were left standing on t
Dec 6, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #39012062r issued on 10-30-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.b109:failure to safegu
Dec 6, 2019 · Penalty $625
Resolve - Class - 1
Failure to safeguard. at time of inspection observed at rear expo 3 scaffolding improperly planked with open holes at all levels. area by balconies no guardrails with 3' opening to the next balcony. safety pins
Oct 30, 2019 · Penalty $10,000
Resolve - Class - 2
Sec. 3307.6.4.8 pedestrian protection does not meet code spacifications. note: at time of my inspection of a 6 sty bldg under construction at 6 sty stage. no construction at 6 sty stage. no construction work in
Oct 15, 2019 · Penalty $2,400
Resolve - Class - 2
Failed to notify the department of an incident that resulted in a fatality or an injury.note=a worker was using a grinder on a concrete masonry unit (cmu) when the grinder kicked back and cut the workers forear
Jul 23, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. noted: at time of my inspection of a new 6 sty bldg,i observed numerious bags of garbage approx 30 bags on the 3rd fl,blocking walkways also
Jun 6, 2019 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction documents &/or amendments. noted: at time of my inspection of a new 6 sty bldg,i observed the adjoining property parapet wall had no protection on it as shown in
Jun 6, 2019 · Penalty $625
Resolve - Class - 1
Sec. 3301.6 no design drawings. noted: at time of my inspection of a new 6 sty bldg,i obsrrved a wood platform in the elevator shaft at the 5th fl approx 8ft x 8ft constructed of scaffold plank & plywood,upon
Jun 6, 2019 · Penalty $1,250
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments. at the time of inspection at new 6 sty bldgs,currently at 5th fl construction work in progress. i observed incorrect cable syste
May 6, 2019 · Penalty $1,250
Resolve
Show 9 more ↓
- Class - 1
Bc3309.10/roof protection;note at time of inspection of a new story building currently at 5th flr,construction work in progress i observed no roof protection in place an adjacent roof at corner of expo#3 and 4
Apr 25, 2019
Resolve - Class - 1
Housekeeping.at the time of my inspection of a new 6 story building currently at 5th flr,construction work on progress i observed construction,debris on the stairs and landing at various floors,creating a hazar
Apr 25, 2019 · Penalty $625
Resolve - Class - 1
Handrails.note:at the time of my inspection of a new 6 story building currently at 5th flr,construction work in progress i observed missing and inadequate handrails and stairs protection from cellar to 5th flr
Apr 25, 2019
Resolve - Class - 2
Job site fence not constructed or maintained in pursuant subsection. job site fence under renewed permit #302141778-01-eq-fn issued 7/5/13. does not comply w/ll47 of 2013. construction fence is constructed of
Oct 5, 2013
Resolve - Class - 2
Failure to file c/c w/dob pursuant to 28-204.2 for vio 34811177x. remedy: file c/c.
Feb 9, 2010 · Penalty $4,000
Resolve - Class - 1
Failure to institute/maintain safety equipment measures, no guard rails.defect noted: at 1st flr open area to cellar approx 8x8 opening in decking w/o protection open to below at 2nd & 3rd flrs open/unprotected
Sep 30, 2009 · Penalty $1,200
Resolve - Non-hazardous
Failure to provide contractors signs no contractors sign provided on sidewalk shed that was erected on broadway front of bldg that is to be demolished.remedy:provide contractors sign w/full name address zip cod
Sep 4, 2007 · Penalty $1,000
Resolve - Non-hazardous
Work without a permit work noted:seven metal columns and six wood columns with wood beams installed at cellar (2)sheetrock partitions constructed at first story west section created room and mezzanine
Sep 26, 2000
Resolve - Non-hazardous
Failure to maintain defect is:first story floor supported by 13 innadequate temporary timber and metal columns and beams(2)hole in fire rated cellar ceiling at various location(lolly columns and timber columns)
Sep 26, 2000
Resolve
Complaints
- Water leak
Slow leak
Jul 20, 2026 · Apt 5A
Close - Water leak
Slow leak
Jul 9, 2026 · Apt 5A
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt 4A
Close - Door/window
Door
Jan 30, 2026 · Apt BLDG
Close - Plumbing
Water supply
Dec 1, 2025 · Apt 3B
Close - Plumbing
Water supply
Dec 1, 2025 · Apt 4C
Close - Plumbing
Water supply
Dec 1, 2025 · Apt BLDG
Close - Water leak
Damp spot
Sep 26, 2024 · Apt 1B
Close - Unsanitary condition
Mold
Sep 26, 2024 · Apt 1B
Close - Water leak
Slow leak
May 19, 2024 · Apt 1B
Close
Show 16 more ↓
- Water leak
Damp spot
Jun 15, 2023 · Apt 5B
Close - Heat/hot water
Entire building
Jan 30, 2022 · Apt BLDG
Close - Plumbing
Water supply
May 12, 2021 · Apt 2A
Close - Appliance
Electric/gas range
Feb 2, 2021 · Apt 4C
Close - Plumbing
Water supply
Jan 24, 2021 · Apt 4C
Close - Plumbing
Water supply
Jan 24, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 14, 2021 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 12, 2021 · Apt 5A
Close - Water leak
Slow leak
Oct 30, 2020 · Apt 4C
Close - Electric
Outlet/switch
Oct 1, 2020 · Apt 4C
Close - Safety
Smoke detector
Oct 1, 2020 · Apt 4C
Close - Appliance
Electric/gas range
Oct 1, 2020 · Apt 4C
Close - Elevator
Maintenance
Oct 1, 2020 · Apt 4C
Close - Unsanitary condition
Garbage/recycling storage
Oct 1, 2020 · Apt 4C
Close - Unsanitary condition
Pests
Oct 1, 2020 · Apt 4C
Close - Plumbing
Water supply
Jul 31, 2019 · Apt 1B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 1931
- Floors
- 6
- Residential units
- 29
- Building area
- 28,974 ft²
- Lot area
- 6,780 ft²
- Zoning
- C4-4L
- Community board
- 303
- Council district
- 41
- Block / lot
- 1623 / 39
- Assessed value
- $2,345,850
- Landmark / historic district
- No
HPD registration #385155, last renewed Jun 26, 2025.
Questions about 1262 Broadway
Who owns 1262 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 1262 Broadway Equities LLC.
Does 1262 Broadway have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 1262 Broadway rent stabilized?
NYC Department of Finance tax bills listed 29 rent-stabilized units here in 2024 (about 100% of its 29 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1262 Broadway built?
City records list 1931 as the year it was built.
How many apartments are in 1262 Broadway?
It has 29 residential units and 31 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.