roofy

1260 Broadway

Brooklyn, NY 11221BBL 3-01623-0038Map

Owner of record: Townhouse Rental, L.l.c.

1260 Broadway is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 6 residential units across 4 floors. The owner of record is Townhouse Rental, L.l.c.. HPD has recorded 29 housing violations here, most recently on September 24, 2026. 2 of the 29 most recent violations are still open.

HPD violations
29
DOB violations
5
ECB violations
2
HPD complaints
68

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 24, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 29

  • B

    Replace with new the missing fire retardant material at ceiling at cellar

    Sep 24, 2026

    Open — Nov certified on time
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west

    Apr 26, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at door in the entrance located at apt 3b, 3rd story, 1st apartment from south at west

    Apr 26, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west

    Apr 26, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west

    Feb 4, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ... in the entrance located at apt 3b, 3rd story, 1st apartment from south at west

    Feb 4, 2026 · Apt 3B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall at public hall, 1st story

    Feb 4, 2026

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west

    Feb 4, 2026 · Apt 3B

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west

    Feb 4, 2026 · Apt 3B

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west

    Feb 4, 2026 · Apt 3B

    Closed — Violation closed
Show 19 more ↓
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west

    Feb 4, 2026 · Apt 3B

    Open — Defect letter issued
  • C

    Provide ready access to buildings heating system door leading to cellar locked at boiler room

    Feb 4, 2026

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective unkeyed fire retardant material at east wall wall at public hall, 1st story

    Feb 4, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance door

    Feb 4, 2026

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 19, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west

    Apr 10, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system trap door locked leading to cellar at boiler room

    Apr 10, 2025

    Closed — Violation dismissed
  • A

    Refit 1st closet door at east in the 1st room from north at west located at apt 4b, 4th story, 1st apartment from south at west

    Mar 5, 2022 · Apt 4B

    Closed — Violation dismissed
  • A

    Refit the 1st door at south in the 1st room from north at east located at apt 4b, 4th story, 1st apartment from south at west

    Mar 5, 2022 · Apt 4B

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective spriing balance 1st 2nd window at north, lower sash in the 1st room from north at east located at apt 4b, 4th story, 1st apartment from south at west

    Mar 5, 2022 · Apt 4B

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 23, 2022

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor at vestibule at public hall, 1st story

    Sep 7, 2021

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 7, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.

    Mar 15, 2021

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Mar 15, 2021

    Closed — Violation closed
  • C

    Arrange and make self-closing the doors at apartment in the entrance located at apt 3b, 3rd story, apartment at west

    Dec 18, 2020 · Apt 3B

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Dec 18, 2020

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the visible mold at caulking around bathtub at south and west walls in the bathroom located at apt 3b, 3rd story, apartment at west

    Dec 18, 2020 · Apt 3B

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 25, 2016

    Closed — Violation closed

DOB building violations · 5

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Apr 9, 1997

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 22, 1995

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    Hazardous

    May 24, 1994

    Vh*-violation hazardous dismissed

ECB violations · 2

  • Non-hazardous

    B4a-34a. 34a - boiler room firedoor not opening to egress (new boiler inspection in newly constructed boiler room).

    Dec 16, 2002 · Penalty $180

    Resolve
  • Non-hazardous

    Failure to maintain-cover to cellar entrance at front of building bro-ken and in need of repairs. remedy:make all necessary repairs in a safe and lawful manner.

    Mar 18, 1991 · Penalty $1,000

    Resolve

Complaints

  • Plumbing

    Sewer

    Apr 23, 2026 · Apt ALL

    Close
  • Door/window

    Door

    Apr 9, 2026 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2026 · Apt 3B

    Close
  • Heat/hot water

    Apartment only

    Dec 17, 2025 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Dec 17, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 3B

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 9, 2025 · Apt 2A

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Feb 6, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Feb 6, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 6, 2025 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Feb 6, 2025 · Apt 3B

    Close
  • Door/window

    Window frame

    Mar 10, 2024 · Apt 3B

    Close
  • Appliance

    Refrigerator

    Jun 13, 2023 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2022 · Apt BLDG

    Close
  • Electric

    Power outage

    May 19, 2022 · Apt BLDG

    Close
  • General

    Cabinet

    Mar 7, 2022 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2022 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Mar 4, 2022 · Apt 4B

    Close
  • Door/window

    Door

    Mar 4, 2022 · Apt 4B

    Close
  • Heat/hot water

    Apartment only

    Jan 3, 2022 · Apt 4B

    Close
  • Door/window

    Door

    Jan 12, 2021 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Nov 29, 2020 · Apt 3B

    Close
  • Appliance

    Electric/gas range

    Nov 29, 2020 · Apt 3B

    Close
  • Unsanitary condition

    Sewage

    Oct 3, 2018 · Apt 1FL

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2018 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 3, 2018 · Apt 4B

    Close
  • General

    Ventilation system

    Dec 23, 2015 · Apt 3A

    Close
  • Heating

    Heat related

    Jan 25, 2014 · Apt 3A

    Close
  • Heating

    Heat related

    Mar 17, 2012 · Apt BLDG

    Close
  • Heating

    Heat related

    Dec 30, 2011 · Apt 4B

    Close
  • Heating

    Heat related

    Dec 30, 2011 · Apt 2B

    Close
  • Heating

    Heat related

    Dec 29, 2011 · Apt 4B

    Close
  • Heating

    Heat related

    Dec 28, 2011 · Apt 2A

    Close
  • Heating

    Heat related

    Dec 28, 2011 · Apt 3A

    Close
  • Heating

    Heat related

    Dec 15, 2011 · Apt 3A

    Close
  • Plumbing

    Water supply

    Mar 11, 2011 · Apt 3B

    Close
  • Heating

    Heat related

    Jan 12, 2011 · Apt 2A

    Close
  • Plumbing

    Bathtub/shower

    Jan 5, 2011 · Apt 3A

    Close
  • Heating

    Heat related

    Dec 30, 2010 · Apt 2A

    Close
  • General

    Floor

    Dec 2, 2010 · Apt 4B

    Close
  • Nonconst

    Carbon monoxide

    Dec 2, 2010 · Apt 4B

    Close
  • Nonconst

    Smoke detector

    Dec 2, 2010 · Apt 4B

    Close
  • Heating

    Heat related

    Dec 2, 2010 · Apt 4B

    Close
  • General

    Floor

    Nov 17, 2010 · Apt 3B

    Close
  • General

    Floor

    Nov 17, 2010 · Apt 3B

    Close
  • General

    Floor

    Nov 17, 2010 · Apt 3B

    Close
  • Plumbing

    Water supply

    Aug 14, 2010 · Apt 2A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
4
Residential units
6
Building area
6,000 ft²
Lot area
2,500 ft²
Zoning
C4-4L
Community board
303
Council district
41
Block / lot
1623 / 38
Assessed value
$661,050
Landmark / historic district
No

HPD registration #317389, last renewed Jun 30, 2026.

Questions about 1260 Broadway

Who owns 1260 Broadway?

The owner of record in NYC Department of City Planning PLUTO data is Townhouse Rental, L.l.c..

Does 1260 Broadway have violations?

Yes. NYC HPD has recorded 29 housing violations at this property.

Is 1260 Broadway rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1260 Broadway built?

City records list 1931 as the year it was built.

How many apartments are in 1260 Broadway?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.