233 Naples Terrace
Bronx, NY 10463BBL 2-05707-0040Map
Owner of record: Naples Terrace
233 Naples Terrace is a walk-up apartment building built in 1926 in Bronx, 10463. It has 47 residential units across 5 floors. The owner of record is Naples Terrace. HPD has recorded 55 housing violations here, most recently on January 3, 2025. 3 of the 50 most recent violations are still open. City tax records listed 24 rent-stabilized apartments here in 2024.
- HPD violations
- 55
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 116
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 55
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 6th story, 1st apartment from north at east
Jan 3, 2025 · Apt 4C
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4c, 6th story, 1st apartment from north at east
Jan 3, 2025 · Apt 4C
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4c, 6th story, 1st apartment from north at east
Jan 3, 2025 · Apt 4C
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 2nd story
Nov 26, 2024
Closed — Violation dismissed - BHazardous
Replace with new the missing radiator valve in the 3rd room from north at west located at apt 4a, 6th story, 2nd apartment from east at south
Dec 4, 2022 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective glass pane at lower sash window in the 3rd room from north at west located at apt 4a, 6th story, 2nd apartment from east at south
Dec 4, 2022 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of slide bolt capable of being padlocked at door in the entrance located at apt 4a, 6th story, 2nd apartment from east at south
Dec 4, 2022 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a, 1st story, 2nd apartment from east at south
Sep 7, 2022 · Apt A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... ( approx. 4sq. ft) at ceiling in the bathroom located at apt a, 1st story, 2nd apartment from east at south
Sep 7, 2022 · Apt A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt a, 1st story, 2nd apartment from east at south
Sep 7, 2022 · Apt A
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 5, 2021
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors defective door hinges in the entire apartment located at apt d, 2nd story, 1st apartment from west at north
Jan 28, 2020 · Apt D
Open — Violation will be reinspected - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor inoperative at public hall, 1st story
Oct 4, 2019
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt d, 2nd story, 2nd apartment from west at north
Oct 4, 2019 · Apt D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt d, 2nd story, 2nd apartment from west at north
Oct 4, 2019 · Apt D
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt d, 2nd story, 2nd apartment from west at north
Oct 4, 2019 · Apt D
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... mold at ceiling ( 3 sq ft ) in the bathroom located at apt d, 2nd story, 2nd apartment from west at north , section ''west''
Sep 26, 2019 · Apt D
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Sep 13, 2018
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Sep 13, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures (cooking fixtures) in the kitchen located at apt 4a, 5th story, 2nd apartment from east at south
Aug 23, 2018 · Apt 4A
Closed — Violation closed - BHazardous
Properly repair the broken or defective door lock in the entrance located at apt 4a, 5th story, 2nd apartment from east at south
Aug 23, 2018 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Refit door in the entrance located at apt 4a, 5th story, 2nd apartment from east at south
Aug 23, 2018 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4a, 5th story, 2nd apartment from east at south
Aug 23, 2018 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4a, 5th story, 2nd apartment from east at south
Aug 23, 2018 · Apt 4A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 4a, 5th story, 2nd apartment from east at south
Aug 23, 2018 · Apt 4A
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of vermin (waterbugs) in the entire apartment located at apt 4a, 5th story, 2nd apartment from east at south
Aug 23, 2018 · Apt 4A
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective cabinet door under sink in the kitchen located at apt 4a, 5th story, 2nd apartment from east at south
Aug 23, 2018 · Apt 4A
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2015
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the private hallway located at apt b, 1st story, 1st apartment from east at south , section at west
Feb 5, 2015 · Apt B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from east at south wall in the 5th room from north at east located at apt b, 1st story, 1st apartment from east at south , section at west
Feb 5, 2015 · Apt B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st radiator from north at east wall in the 5th room from north at west located at apt b, 1st story, 1st apartment from east at south , section at west
Feb 5, 2015 · Apt B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt b, 1st story, 1st apartment from east at south , section at west
Feb 5, 2015 · Apt B
Closed — Violation dismissed - BHazardous
D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner flower pots etc 1st sty 2nd balcony rear 233 bldg.
Sep 12, 1989
Closed — Violation closed - BHazardous
D26-19.07 adm code install and maintain sufficient light or lights of at least 40 watts incandescent or equivalent each, to light adequately from sunset to sunrise the rear east court yard.
Sep 12, 1989
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective brickwork around front southwest window 6 sty level east section er1.
Sep 12, 1989
Closed — Violation closed - CImmediately hazardous
Remove all obstructions and repair all defects in drain at rear yards west section er1.
Sep 12, 1989
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots of household items all stys balconies rear east west.
Sep 12, 1989
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system 1 sty pub hall & boiler room door.
Sep 12, 1989
Closed — Violation closed - BHazardous
Repair or replace the smoke detector ssing 3 sty southeast apt 2a east section mr kraft. located at apt 2a
Sep 12, 1989 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint door & frame bathroom & door & frame entrance to 4 sty north apt 2c east section mr r weiss 601 8432. , section '' ''
Sep 12, 1989 · Apt 2C
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets bathtub bathroom 4 sty north apt 2c east section. , section '' ''
Sep 12, 1989 · Apt 2C
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 4 sty southwest apt 2e west section. located at apt 2e
Sep 12, 1989 · Apt 2E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color clg bathroom 4 sty south east apt 2e west section. located at apt 2e
Sep 12, 1989 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective exterior brickwork front west section.
Sep 12, 1989
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors 4 sty north apt 2c east section. located at apt 2c
Sep 12, 1989 · Apt 2C
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of air condition at fire escape window 4 sty north apt 2c east section. located at apt 2c
Sep 12, 1989 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls & clgs 1 sty northeast apt d bathroom & kitchen west section.
Apr 6, 1989
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing 3 sty southwest apt 2a west section mrarmstrong. located at apt 2a
Apr 6, 1989 · Apt 2A
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate 3 sty southwest apt 2a west section. located at apt 2a
Apr 6, 1989 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color clg & walls private hall 1 sty northeast apt d west section.
Apr 6, 1989
Closed — Violation closed
DOB building violations · 3
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2023
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 1
- Class - 2
Failure to maintain exterior walls, noted: at the time of my inspection,at exp#3 retaining wall is in a state of disrepair. trees have & grown causing masonry wall to beging to crack & crumble onto 3135 godwin
Jun 24, 2016 · Penalty $250
Resolve
Complaints
- Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Aug 20, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 3, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 4A
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 4C
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 16, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Dec 15, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 15, 2024 · Apt A
Close - Heat/hot water
Apartment only
Dec 15, 2024 · Apt 4A
Close - Heat/hot water
Apartment only
Dec 14, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Dec 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 2, 2024 · Apt 4A
Close - Heat/hot water
Apartment only
Nov 30, 2024 · Apt 4A
Close - Heat/hot water
Apartment only
Nov 24, 2024 · Apt 4A
Close - Heat/hot water
Entire building
Nov 24, 2024 · Apt 4C4A
Close - Appliance
Electric/gas range
Jul 19, 2024 · Apt 1E
Close - Heat/hot water
Apartment only
Jan 15, 2024 · Apt B
Close - Heat/hot water
Apartment only
Jan 6, 2024 · Apt 4A
Close - Heat/hot water
Apartment only
Dec 20, 2023 · Apt 4A
Close - Heat/hot water
Apartment only
Sep 17, 2023 · Apt WALKIN
Close - Heat/hot water
Apartment only
Jan 15, 2023 · Apt B
Close - Heat/hot water
Entire building
Dec 1, 2022 · Apt 4A
Close - Heat/hot water
Entire building
Nov 18, 2022 · Apt BLDG
Close - Paint/plaster
Ceiling
Sep 15, 2022 · Apt A
Close - Water leak
Damp spot
Sep 7, 2022 · Apt A
Close - Unsanitary condition
Mold
Sep 2, 2022 · Apt A
Close - Heat/hot water
Entire building
Mar 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 1, 2022 · Apt B
Close - Heat/hot water
Entire building
Jan 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 12, 2022 · Apt B
Close - Heat/hot water
Entire building
Jan 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2022 · Apt B
Close - Heat/hot water
Entire building
Jan 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2021 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 5
- Residential units
- 47
- Building area
- 39,960 ft²
- Lot area
- 10,500 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 11
- Block / lot
- 5707 / 40
- Assessed value
- $1,362,600
- Landmark / historic district
- No
HPD registration #207828, last renewed Sep 12, 2025.
Questions about 233 Naples Terrace
Who owns 233 Naples Terrace?
The owner of record in NYC Department of City Planning PLUTO data is Naples Terrace.
Does 233 Naples Terrace have violations?
Yes. NYC HPD has recorded 55 housing violations at this property.
Is 233 Naples Terrace rent stabilized?
NYC Department of Finance tax bills listed 24 rent-stabilized units here in 2024 (about 51% of its 47 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 233 Naples Terrace built?
City records list 1926 as the year it was built.
How many apartments are in 233 Naples Terrace?
It has 47 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.