3140 Kingsbridge Avenue
Bronx, NY 10463BBL 2-05707-0013Map
Owner of record: Kf 3140 Kingsbridge LLC
3140 Kingsbridge Avenue is a walk-up apartment building built in 1926 in Bronx, 10463. It has 70 residential units across 5 floors. The owner of record is Kf 3140 Kingsbridge LLC. HPD has recorded 519 housing violations here, most recently on October 9, 2026. 35 of the 50 most recent violations are still open. City tax records listed 69 rent-stabilized apartments here in 2024.
- HPD violations
- 519
- DOB violations
- 7
- ECB violations
- 5
- HPD complaints
- 1,535
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 519
- CImmediately hazardous
Properly repair or replace the broken or defective latch and assemblys at 2nd story public hall door at south section , 2nd story
Oct 9, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at 2nd story public hall door at south section , 2nd story
Oct 9, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective cracked ceramic tiles at floor in the bathroom located at apt a, 2nd story, 1st apartment from west at north , section ''south''
Oct 9, 2026 · Apt A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the bathroom located at apt a, 2nd story, 1st apartment from west at north , section ''south''
Oct 9, 2026 · Apt A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective at base cabinet at sink in the kitchen located at apt a, 2nd story, 1st apartment from west at north , section ''south''
Oct 9, 2026 · Apt A
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt a, 2nd story, 1st apartment from west at north , section ''south''
Oct 9, 2026 · Apt A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt a, 2nd story, 1st apartment from west at north , section ''south''
Oct 9, 2026 · Apt A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt a, 2nd story, 1st apartment from west at north , section ''south''
Oct 9, 2026 · Apt A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a, 2nd story, 1st apartment from west at north , section ''south''
Oct 9, 2026 · Apt A
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt a, 2nd story, 1st apartment from west at north , section ''south''
Oct 9, 2026 · Apt A
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage bags (underneath) at staircase (south) at fire passage way
Oct 6, 2026
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats at fire passage way
Oct 6, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder (shoe) using appropriate nuts and bolts at south exterior wall at fire escape
Oct 6, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a , 6th story, 1st apartment from west at north
Oct 6, 2026 · Apt 4A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective glass pane at upper cabinet door west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Aug 1, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Aug 1, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Aug 1, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective glass pane at door in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Aug 1, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cabinet door west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Aug 1, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the bathroom located at apt 2f, 2nd story, 1st apartment from west at north
Aug 1, 2026 · Apt 2F
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd room from north at east located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
Jun 16, 2026 · Apt G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from north at east located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
Jun 16, 2026 · Apt G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the foyer located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
Jun 16, 2026 · Apt G
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of vegetation growing out of east exterior wall at 5th and 6th story (building rear)
Jun 16, 2026
Open — Not complied with - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all components at all balconies at all fire escapes around the building(7 total) at fire escape
Jun 16, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty lock at building entrance door , 2nd story, section ''3140''
May 26, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
May 26, 2026 · Apt G
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
May 26, 2026 · Apt G
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
May 26, 2026 · Apt G
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower winodw sash counter balance in the kitchen located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
May 26, 2026 · Apt G
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tile in the kitchen located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
May 26, 2026 · Apt G
Open — False certification - BHazardous
Properly repair or replace the broken or defective lower window sash counter balance at 2nd window at west in the 3rd room from north located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
May 26, 2026 · Apt G
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt g, 2nd story, 2nd apartment from west at north , section ''3140''
May 26, 2026 · Apt G
Open — False certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st closet from west at north wall door frame, 1st door frame from east at south wall in the private hallway located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, 1st window frame from south at west wall in the 2nd room from north at east located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st door frame from east at south wall in the foyer located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame, 1st door frame from south at west wall, north wall, east wall, west wall, 2nd window frame from north at east wall in the 1st room from north at east located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the bathroom located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, east wall in the bathroom located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall, west wall, ceiling in the bathroom located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at west wall in the kitchen located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st riser from west at north wall in the kitchen located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the in the private hallway located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall, baseboard at west wall, 1st door from south at west wall, 1st door from south at west wall, baseboard at west wall, 1st window frame from north at east wall, ceiling in the 1st room from north at east located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, 1st door frame from north at east wall, north wall, south wall, east wall, west wall, 1st window frame from west at north wall in the kitchen located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balances at lower sash of 1st window from north at east in the 1st room from north at east located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balances at lower sash of 2nd window from south at west in the 2nd room from north at east located at apt g, 2nd story, 2nd apartment from west at north
Apr 30, 2026 · Apt G
Closed — Violation closed
DOB building violations · 7
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 2
B265 as per class (b265)28.303.7-failure to file a complete coiler in spection report.submit a complete boiler initial inspection safety report.
Sep 24, 2018
Resolve - Class - 2
11a,32a,50a,50b,50c-as per class 2 (b254)28.301.1 failure to maintain electrical wiring.11a:surface blowdown valve not installed.50a:dogleg missing at rear access door.50b:bodydrains missing from safety valves
Sep 24, 2018
Resolve - Class - 2
Failure to maintain exterior walls. noted: at the time of my inspection,at exp#3 retaining wall is in a state of disrepair. trees have overgrown causing masonry wall to begin to crack & crumble onto 3135 godwin
Jun 24, 2016 · Penalty $250
Resolve - Non-hazardous
16,32a,42,48a,50,50a,b,c,d,e,f,g,h.50-debris in boiler room.50a-missing backflow valve.50b-steam gauge missing brass syphon tube.50c-holes in boiler room ceiling.50d-sail switch not wired properly(oil valve)50e
May 14, 2007 · Penalty $180
Resolve - Non-hazardous
49-a boiler leaking in front above tubes.
Jan 22, 1996
Resolve
Complaints
- Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - Door/window
Door
Sep 8, 2026 · Apt 4F
Close - Appliance
Electric/gas range
Jul 27, 2026 · Apt 2F
Close - Appliance
Refrigerator
Jul 27, 2026 · Apt 2F
Close - Flooring/stairs
Floor
Jul 27, 2026 · Apt 2F
Close - General
Cabinet
Jul 27, 2026 · Apt 2F
Close - Plumbing
Bathtub/shower
Jul 27, 2026 · Apt 2F
Close - Appliance
Refrigerator
Jul 13, 2026 · Apt 2F
Close - Flooring/stairs
Floor
Jun 29, 2026 · Apt 2F
Close
Show 40 more ↓
- Appliance
Refrigerator
Jun 29, 2026 · Apt 2F
Close - Appliance
Electric/gas range
Jun 29, 2026 · Apt 2F
Close - Plumbing
Bathtub/shower
Jun 29, 2026 · Apt 2F
Close - General
Cabinet
Jun 29, 2026 · Apt 2F
Close - Door/window
Window frame
Apr 22, 2026 · Apt G
Close - Paint/plaster
Ceiling
Apr 22, 2026 · Apt G
Close - Flooring/stairs
Floor
Apr 22, 2026 · Apt G
Close - Unsanitary condition
Mold
Apr 22, 2026 · Apt G
Close - Unsanitary condition
Pests
Apr 22, 2026 · Apt G
Close - Flooring/stairs
Floor
Apr 22, 2026 · Apt G
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Line of travel
Line of travel
Mar 9, 2026 · Apt BLDG
Close - Line of travel
Line of travel
Mar 9, 2026 · Apt BLDG
Close - Line of travel
Line of travel
Mar 9, 2026 · Apt 3GS
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 16, 2026 · Apt E
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 23, 2026 · Apt E
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt APT3B
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Jan 19, 2026 · Apt E
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 5
- Residential units
- 70
- Building area
- 74,729 ft²
- Lot area
- 13,861 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 11
- Block / lot
- 5707 / 13
- Assessed value
- $1,458,900
- Landmark / historic district
- No
HPD registration #201694, last renewed Aug 25, 2025.
Questions about 3140 Kingsbridge Avenue
Who owns 3140 Kingsbridge Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Kf 3140 Kingsbridge LLC.
Does 3140 Kingsbridge Avenue have violations?
Yes. NYC HPD has recorded 519 housing violations at this property.
Is 3140 Kingsbridge Avenue rent stabilized?
NYC Department of Finance tax bills listed 69 rent-stabilized units here in 2024 (about 99% of its 70 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3140 Kingsbridge Avenue built?
City records list 1926 as the year it was built.
How many apartments are in 3140 Kingsbridge Avenue?
It has 70 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.