266 Bedford Park Blvd
Bronx, NY 10458BBL 2-03297-0011Map
Owner of record: Pmv Realty Management, LLC
266 Bedford Park Blvd is an elevator apartment building built in 1935 in Bronx, 10458. It has 73 residential units across 6 floors. The owner of record is Pmv Realty Management, LLC. HPD has recorded 297 housing violations here, most recently on May 10, 2026. 31 of the 50 most recent violations are still open. City tax records listed 73 rent-stabilized apartments here in 2024.
- HPD violations
- 297
- DOB violations
- 45
- ECB violations
- 12
- HPD complaints
- 3,705
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 297
- CImmediately hazardous
M/d law abate the nuisance consisting of illegal electrical work creating a fire hazard
May 10, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of lint blowing out into the yard emitting lint and blowing into the apartments
May 10, 2026
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration illegal laundry room at bassement 311-27488971
May 10, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings paper form
May 10, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
May 10, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox paper form
May 10, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
May 10, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective 2nd fire door hitting frame to boiler room at north section,at bassement
May 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective 1st fire door hitting frame to boiler room at north section at basement
May 10, 2026
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration 2nd missing fire door to apartment (1c) aparment at south section at bassement
May 10, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective 2nd missing fire door to apartment 1c at south section
May 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective 2nd fire door to laundry room hitting frame
May 10, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assembly at 1st fire door to laundry room south section at bassement
May 10, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at 1st fire door to laundry room at south section
May 10, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st fire door to laundry room at south section at bassement
May 10, 2026
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at w2 fire door at public hall
Jan 3, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective rotted countertop at sink in the kitchen located at apt 3d, 3rd story, 1st apartment from east at south , 1st section from north at east
Nov 23, 2025 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Refit entrance door to room in the 1st room from north located at apt 3d, 3rd story, 1st apartment from east at south , 1st section from north at east
Nov 23, 2025 · Apt 3D
Open — Nov sent out - BHazardous
Refit entrance door to room in the 4th room from north at east located at apt 3d, 3rd story, 1st apartment from east at south , 1st section from north at east
Nov 23, 2025 · Apt 3D
Closed — Violation dismissed - BHazardous
Refit upper and lower sashes windows in the 4th room from north at east located at apt 3d, 3rd story, 1st apartment from east at south , 1st section from north at east
Nov 23, 2025 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall and floor in the bathroom located at apt 3d, 3rd story, 1st apartment from east at south , 1st section from north at east
Nov 23, 2025 · Apt 3D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at bsmt-apt c1, 1st bsmt-apt from east at south , section ''e'', 1st from north at east
Aug 11, 2025 · Apt C1
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 5f, 4th story, 1st apartment from west at north , section ''e'', 1st from north at east
Aug 11, 2025 · Apt 5F
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6d, 5th story, 1st apartment from south at west , section ''e'', 1st from north at east
Aug 11, 2025 · Apt 6D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 6b, 5th story, 1st apartment from east at south
Aug 11, 2025 · Apt 6B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 5l, 5th story, 1st apartment from west at north
Jun 20, 2025 · Apt 5L
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 5l, 5th story, 1st apartment from west at north
Jun 20, 2025 · Apt 5L
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock at door leading to the fire escape in the 3rd room from east at north located at apt 5l, 5th story, 1st apartment from west at north
Jun 20, 2025 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Jun 10, 2025
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Jun 10, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the foyer located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the foyer located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Closed — Violation closed - ANon-hazardous
Discontunue unlawful use of kitchen for sleeping purposes ,,, in the kitchen located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration sheetrock and stud wall erected creating sleeping room in the kitchen located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, 1st door from west at north wall in the 1st room from east at south located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, north wall in the bathroom located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 3rd room from east located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st window frame from east at south wall in the 3rd room from east located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from north at east wall in the 3rd room from east located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, east wall, 2nd window frame from east at south wall, 1st window frame from north at east wall in the 3rd room from east located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of lockable slide bolt at door in the entrance located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Closed — Violation closed - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame, 2nd closet from west at north wall door frame, 3rd closet from west at north wall door frame in the private hallway located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 2nd closet from west at north wall door, 3rd closet from west at north wall door in the private hallway located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from north at east wall in the bathroom located at apt 6h, 5th story, 1st apartment from east at south , section at west
Apr 7, 2025 · Apt 6H
Closed — Violation closed
DOB building violations · 45
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 22, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 22, 2020
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2019
Dob violation - active - Elevator elevatorrequired
Cease use
Feb 12, 2018
Dob violation - active - Elevator elevatorrequired
Cease use
Feb 12, 2018
Dob violation - active
Show 35 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 4, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 8, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 8, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 21, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 28, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2003
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Elevator elevatorrequired
(74)restore elev #829 to service for purpose of inspection by this dept
Sep 5, 1989
Dob violation - resolved - Elevator elevatorrequired
(51)file proper bn with the department for new controller instal
Jul 1, 1988
Dob violation - resolved
ECB violations · 12
- Class - 1
Failure to maintain exterior building facade and appurtenances. notes:-at the time of inspection observed at exp #1, 2, 4 cracked brick masonry with open mortar joints at multiple locations. exposure3 defective
Feb 28, 2026 · Penalty $5,000
Active - Class - 2
Failure to comply with commissioner's order contained in summons#39032452k issued on 11/24/2020,and failure to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2).an acceptable certific
Mar 19, 2024 · Penalty $1,250
Active - Class - 2
Failed to notify dept prior to installation or removal of suspended scaffold. noted:suspended scaffold installed at building courtyard w/o notifying the dept. no notification in dob records. remedy:comply w/ co
Jul 18, 2021 · Penalty $2,500
Active - Class - 2
Work without a permit. at time of inspection, observed at rear yard, a car port erected, approximately 10 by 10 by 10 feet high, attached to wall of neighboring building., obtain all permits
Nov 24, 2020 · Penalty $1,250
Active - Class - 3
Violation of parking regulations in a residential district. at time of inspection, observed at rear yard, a white mercedes car, plate # jjz-6392 parked. property is in a r7-1 - general residence district, confo
Nov 24, 2020 · Penalty $500
Active - Class - 1
Cu43l10; 64m07; 15m07; 35m07; 57bb07; 100b10; 59bb05;100m07; 71m07; 30m07; 45m13. cease use items; 43l-repair relay and contact dob for restore servcie reinspection; *64m-provide and install in car *15m-provide
Mar 18, 2019 · Penalty $1,280
Active - Class - 2
05e10.56y10.70o02.45e10.05 car door rubbing on top of car saddle
Mar 13, 2009 · Penalty $500
Resolve - Non-hazardous
Work w/o a permit work noted: lintel removed above window at apt #7b. approx 7'ft long i - beam removed leaving bricks exposed and in(dangs)of falling. remedy: obtain permit to legalized work.
Jun 18, 2008 · Penalty $800
Resolve - Non-hazardous
50a,34a. rockmills ftsm,mp 125,sn-oil fired,1982 50a-boiler room-steampressure guage has a dial range of 0-15 psi.safety valve is set at 15 psi.replacement pressure guage must be 0-30psi for code compliance.34a
Mar 1, 2004 · Penalty $180
Resolve - Non-hazardous
Occupancy contrary to building department records new building approved application 207 of 1935 legal use one apartment permitted in the cellar illegel use 2 apartment in the cellar 1 at the east area and 1 at
Feb 10, 1998 · Penalty $800
Resolve
Show 2 more ↓
- Non-hazardous
75r08v
Jul 1, 1997 · Penalty $100
Resolve - Non-hazardous
46h75r
Jul 1, 1997 · Penalty $100
Resolve
Complaints
- Plumbing
Water supply
Sep 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Water leak
Slow leak
Nov 21, 2025 · Apt 3D
Close - Flooring/stairs
Floor
Nov 21, 2025 · Apt 3D
Close
Show 40 more ↓
- Heat/hot water
Entire building
Nov 21, 2025 · Apt 3D
Close - Door/window
Window frame
Nov 21, 2025 · Apt 3D
Close - Electric
No lighting
Nov 21, 2025 · Apt 3D
Close - Heat/hot water
Entire building
Apr 9, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 3, 2025 · Apt 6H
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 6, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 25, 2023 · Apt 4E
Close - Plumbing
Basin/sink
Oct 23, 2023 · Apt 2G
Close - Plumbing
Bathtub/shower
Oct 23, 2023 · Apt 2G
Close - Heat/hot water
Entire building
Dec 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 15, 2021 · Apt 5A
Close - Appliance
Electric/gas range
Sep 11, 2020 · Apt 4I
Close - Appliance
Electric/gas range
Sep 11, 2020 · Apt 4I
Close - Appliance
Refrigerator
Sep 11, 2020 · Apt 4I
Close - Heat/hot water
Entire building
Dec 31, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2019 · Apt BLDG
Close - Plumbing
Radiator
Oct 25, 2019 · Apt 7G
Close - Water leak
Slow leak
Oct 11, 2019 · Apt 6J
Close - Unsanitary condition
Pests
Oct 11, 2019 · Apt 6J
Close - Heat/hot water
Apartment only
Oct 10, 2019 · Apt 2I
Close - Plumbing
Water supply
Sep 2, 2019 · Apt 7K
Close - Heat/hot water
Entire building
Sep 2, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 1, 2019 · Apt 7K
Close - Plumbing
Water supply
Sep 1, 2019 · Apt 4D
Close - Heat/hot water
Entire building
Aug 11, 2019 · Apt 2F
Close - Heat/hot water
Entire building
Aug 6, 2019 · Apt 6C
Close - Unsanitary condition
Mold
Aug 6, 2019 · Apt 1C
Close - Heat/hot water
Entire building
Aug 4, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 4, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 4, 2019 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1935
- Floors
- 6
- Residential units
- 73
- Building area
- 93,600 ft²
- Lot area
- 18,700 ft²
- Zoning
- R7A
- Community board
- 207
- Council district
- 11
- Block / lot
- 3297 / 11
- Assessed value
- $913,500
- Landmark / historic district
- No
HPD registration #204978, last renewed Sep 25, 2025.
Questions about 266 Bedford Park Blvd
Who owns 266 Bedford Park Blvd?
The owner of record in NYC Department of City Planning PLUTO data is Pmv Realty Management, LLC.
Does 266 Bedford Park Blvd have violations?
Yes. NYC HPD has recorded 297 housing violations at this property.
Is 266 Bedford Park Blvd rent stabilized?
NYC Department of Finance tax bills listed 73 rent-stabilized units here in 2024 (about 100% of its 73 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 266 Bedford Park Blvd built?
City records list 1935 as the year it was built.
How many apartments are in 266 Bedford Park Blvd?
It has 73 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.