2929 Bainbridge Avenue
Bronx, NY 10458BBL 2-03297-0001Map
Owner of record: Bainbridge Construction
2929 Bainbridge Avenue is an elevator apartment building built in 1955 in Bronx, 10458. It has 55 residential units across 6 floors. The owner of record is Bainbridge Construction. HPD has recorded 14 housing violations here, most recently on April 8, 2026. 5 of the 14 most recent violations are still open. City tax records listed 37 rent-stabilized apartments here in 2024.
- HPD violations
- 14
- DOB violations
- 16
- ECB violations
- 8
- HPD complaints
- 115
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 6th story
Jan 2, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at hopper door at compactor closet, 4th story
Dec 16, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door at compactor closet, 4th story
Dec 16, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assemblys at door at compactor closet, 4th story
Dec 16, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceding 130 degrees at kitchen fixture in the kitchen located at apt 6c, 6th story, 2nd apartment from west at north
Dec 10, 2025 · Apt 6C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2a, 2nd story, 2nd apartment from south at west
Nov 23, 2025 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2a, 2nd story, 2nd apartment from south at west
Nov 23, 2025 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective metal sheet cover the window sill at east in the 1st room from east located at apt 6d, 6th story, 1st apartment from north at east
Dec 4, 2023 · Apt 6D
Open — Nov sent out
Show 4 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the 1st room from east located at apt 6d, 6th story, 1st apartment from north at east
Dec 4, 2023 · Apt 6D
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective metal sheet cover the window sill at south window in the 1st room from east located at apt 6d, 6th story, 1st apartment from north at east
Dec 4, 2023 · Apt 6D
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective metal sheet cover the window sill at south window in the kitchen located at apt 6d, 6th story, 1st apartment from north at east
Dec 4, 2023 · Apt 6D
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective metal sheet cover the window sill at east window in the 4th room from east located at apt 6d, 6th story, 1st apartment from north at east
Dec 4, 2023 · Apt 6D
Open — Nov sent out
DOB building violations · 16
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 23, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2008
Dob violation - resolved
Show 6 more ↓
- Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 14, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2005
Dob violation - resolved - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Mar 29, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed
ECB violations · 8
- Class - 2
Occupancy contrary to that allowed by the certificate of occupancy or buildings department records. at time of appointment for apartment # 5a noted four beds for sleeping in a studio apartment. two full size an
Dec 30, 2019
Resolve - Class - 2
42d06,43q03,56y13,57q03,67m07: 42d06- secure relays on controller; 57q03-install cover for motor leads box on hoist motor; 67m07- provide communication in car (telephone)
Dec 30, 2011 · Penalty $250
Resolve - Class - 1
Failure to maintain bldg in code compliant manner: lack of a system ofautomatic sprinklers where required per bc 903.2; 27-954. observed andphotographedthe installation of 4 gas fired dryers w/o theinstallation
Dec 27, 2011 · Penalty $1,000
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner: gas vent for dryersnot permitted to be plastic. observed: photographed 4 gas dryers w/flexible gas connectors and plastic dryer vents. remedy: obtain a permit
Dec 27, 2011 · Penalty $250
Resolve - Non-hazardous
84l10,10b10,21l10.84/l-fan inside of car doesn't work.10/b car door needs 2 gibs. 21/l- car hits interlock when moving.
Jul 26, 2006
Resolve - Non-hazardous
10,h,11 5,j,1 12,x,7 17,h,11 34,q,3 25,h,6 42,q,3 41,g,11 51,k,10 85,m,7 86,u,5 26,u,5 5j1 too much gap between car door and car post 12x17 car top 17h11 all fls 34q3 car top 41g11 1-5 fuses 85mc company name
Feb 3, 2004 · Penalty $300
Active - Hazardous
Failure to file an amend round five report acceptable to this dept. pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file amended rep
Jun 5, 2000 · Penalty $400
Resolve - Non-hazardous
Failure to file a report of compliance with local law 16/84 certifyingto the installation of required fire protection systems. remedy: file report.
Aug 23, 1999
Active
Complaints
- Plumbing
Water supply
Jun 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 12, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 4H
Close - Heat/hot water
Entire building
Jan 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 21, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 4H
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 14, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 7, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt ENTIRE
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 28, 2025 · Apt 4H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1955
- Floors
- 6
- Residential units
- 55
- Building area
- 59,085 ft²
- Lot area
- 13,810 ft²
- Zoning
- R7B
- Community board
- 207
- Council district
- 11
- Block / lot
- 3297 / 1
- Assessed value
- $2,060,550
- Landmark / historic district
- No
HPD registration #207261, last renewed Jul 30, 2026.
Questions about 2929 Bainbridge Avenue
Who owns 2929 Bainbridge Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bainbridge Construction.
Does 2929 Bainbridge Avenue have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 2929 Bainbridge Avenue rent stabilized?
NYC Department of Finance tax bills listed 37 rent-stabilized units here in 2024 (about 67% of its 55 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2929 Bainbridge Avenue built?
City records list 1955 as the year it was built.
How many apartments are in 2929 Bainbridge Avenue?
It has 55 residential units and 56 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.