2501 Sedgwick Avenue
Bronx, NY 10468BBL 2-03237-0009Map
Owner of record: 2499 Sedgwick Development LLC
2501 Sedgwick Avenue is an elevator apartment building built in 2022 in Bronx, 10468. It has 113 residential units across 7 floors. The owner of record is 2499 Sedgwick Development LLC. HPD has recorded 28 housing violations here, most recently on September 16, 2026. 12 of the 28 most recent violations are still open. City tax records listed 113 rent-stabilized apartments here in 2024.
- HPD violations
- 28
- DOB violations
- 3
- ECB violations
- 28
- HPD complaints
- 27
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 28
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 213, 2nd story, 1st apartment from north at east
Sep 16, 2026 · Apt 213
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 213, 2nd story, 1st apartment from north at east
Sep 16, 2026 · Apt 213
Open — Civ14 mailed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 213, 2nd story, 1st apartment from north at east
Sep 16, 2026 · Apt 213
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 213, 2nd story, 1st apartment from north at east
Sep 16, 2026 · Apt 213
Open — Civ14 mailed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 213, 2nd story, 1st apartment from north at east
Sep 16, 2026 · Apt 213
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 203, 2nd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 203
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 2nd room from east at north located at apt 203, 762nd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 203
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 2nd room from east at north located at apt 203, 762nd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 203
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 5th story
Sep 4, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 203, 2nd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 203
Open — Civ14 mailed
Show 18 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 203, 2nd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 203
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 203, 2nd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 203
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 604, 6th story, 2nd apartment from north at east
Jun 29, 2026 · Apt 604
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 309, 3rd story, 4th apartment from west at north
Jun 29, 2026 · Apt 309
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective window frame in the 2nd room from east located at apt 309, 3rd story, 8th apartment from south at west
Jun 25, 2026 · Apt 309
Closed — Violation closed - ANon-hazardous
M/d law abate the nuisance consisting of window stopper at west in the 2nd room from east located at apt 309, 3rd story, 8th apartment from south at west
Jun 25, 2026 · Apt 309
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchenette located at apt 313, 3rd story, 1st apartment from north at east
Feb 24, 2026 · Apt 313
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 313, 3rd story, 1st apartment from north at east
Feb 24, 2026 · Apt 313
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the bathroom located at apt 313, 3rd story, 1st apartment from north at east
Feb 24, 2026 · Apt 313
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 313, 3rd story, 1st apartment from north at east
Feb 24, 2026 · Apt 313
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the kitchenette located at apt 313, 3rd story, 1st apartment from north at east
Feb 24, 2026 · Apt 313
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 24, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system paper sign at public hall, 1st story
Feb 24, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox paper sign at public hall, 1st story
Feb 24, 2026
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Feb 24, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 24, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings paper sign
Feb 24, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 24, 2026
Closed — Violation dismissed
DOB building violations · 3
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 3, 2024
Dob violation - dismissed
ECB violations · 28
- Class - 2
Observed in basement compactor room a sprinkler head obstructed by the ceiling soffit. sprinkler piping not painted red, pvc waste lines under sinks on first floor and basement, and the first floor bathrooms la
Dec 26, 2025
Resolve - Class - 2
Bc 3307.1 scope. observed construction debris on the street in from of jobsite @ exposure 1. when asked to see department of transportation(dot) permit for the use of contain on street, no permit was provided.
Apr 9, 2024
Resolve - Class - 1
Proposed 7 story new building at 7th floor level closed jobsite. building approximately 8499 square feet, upon shouting at perimeter & banging at fence to alert watchperson and to verify compliance with code, n
Sep 9, 2023 · Penalty $2,500
Resolve - Class - 2
At time of inspection on proposed 7 story nb closed jobsite. i observed at rear exposure-3 with inadequate cearance-(min 5 feet)-3307.2.1 on pedestrian walkway with fence, yudock & pole obstruction & missing bl
Sep 9, 2023 · Penalty $2,400
Resolve - Class - 2
Failure to provide pedestrian protection at exposure # 1 and 3. job site is a 7 floor nb at 3rd floor level with no pedestrian protection.amend site safety plans to re-direct traffic to the other side of the st
Jun 21, 2023 · Penalty $625
Resolve - Class - 2
Observed inadequate construction fence at exposure 3 of jobsite. the said fence is collapsing towards public and has an abundance of openings in it.maintain fence as per code
Apr 24, 2023
Resolve - Class - 1
Observed cold form steel installed with blocking at cellar level of jobsite. upon review of the dob approved drawings it shows that the blocking is to have straps installed top and bottom of blocking which is n
Apr 24, 2023 · Penalty $2,500
Resolve - Class - 2
Failure to provided ramps on pedestrian walkways. upon inspection, observed at exposure 3 temporary pedestrian walkway without ramps on both side as per building code 3307.2.6 requirement 4 ramps. also requirem
Mar 14, 2023
Resolve - Class - 2
At time of inspection, observed in multiple level inadequate fire extinguishers. as per building code 3303.7.2 fire extinguishers shall follow fire code. observed missing inspection tags, expire inspection tags
Mar 14, 2023
Resolve - Class - 1
Failure to provide temporary hand rail on stairs. upon inspection observed at exposure 3 workers currently working on stairs. no handrails installed on stairs while work in progress. stairs are higher than 6 fe
Mar 14, 2023
Resolve
Show 18 more ↓
- Class - 1
Upon inspection, observed inadequate indoor storage of a 3 containers of flammable liquids. as per building code 3303.4.6 storage of this liquids shall follow fire code. this condition violates fire codes 3306.
Mar 14, 2023 · Penalty $625
Resolve - Class - 1
Upon inspection observed workers on stairwell without any fall protection system. no guardrails, handrails or a safe anchored point provided. at first observed worker with no body harness, second time observed
Mar 14, 2023 · Penalty $2,500
Resolve - Class - 1
At time of inspection, observed construction site open currently 3 levels high. at exposure 3 observed cmu approx. 30 feet high no overhead protection installed. as per site safety plan overhead protection is r
Mar 14, 2023 · Penalty $2,500
Resolve - Class - 1
Bc2104.6 failure to provide masonry cmu block wall bracing.in accordance w/tms602/ac530.1/adce6sec3.3.as noted ato my isp@active jobsite observed@exp2 cmu block unbraced&about 100'l&over 8"(8.9") temp bracing s
Oct 25, 2022 · Penalty $2,500
Resolve - Class - 2
Job site fence not maintained, expired permitrenew construction fence permit.
Jul 12, 2022 · Penalty $500
Resolve - Class - 1
Retaining formwork wall approx 20 feet in height w/ makeshift connections w/out plans. no pre-construction survey.provide approved drawings for retaining formwork wall & pre-construction survey.
Jul 12, 2022
Resolve - Class - 2
Work contrary to construction documents.at the time of my inspection,iobserved that the construction fence surrounding the jobsite was modified/enlarged at the corner of exp3 and 4 which constricted the access
Dec 10, 2021 · Penalty $620
Resolve - Class - 2
Unsafe/unsuitable electrical equipment in use.at the time of my inspection,i observed 2 workers using separate arc welding equipment for soewalers at exp4.however the ground leads for both machines were frayed.
Dec 10, 2021 · Penalty $400
Resolve - Class - 1
Failure to notify dob prior to commencement of earthwork/foundation work. at the time of my inspection,i observed that excavation & support of excavation(soe)work being done at exp#4. however,there was no evide
Oct 19, 2021 · Penalty $2,500
Resolve - Class - 1
Work contrary to construction documents. at the time of my inspection,i observed that the support of excavation(soe)were being done at exp#4did not conform to the approved/accepted drawings. 1)there was no vibr
Oct 19, 2021 · Penalty $625
Resolve - Class - 2
Temporary construction equipment on site - expired permit. as noted:at time of inspection at active construction site observed permit #x00315735-i1-fn issued 01/28/21 expired 07/17/21.further research of dob re
Sep 8, 2021
Resolve - Class - 2
Temporary construction equipment onsite expired permit "fence" at timeof inspection observed an construction site with temporary construction equipment "fence" expires 04/10/2021 and i also hold on dobnow.not r
Apr 13, 2021 · Penalty $1,250
Resolve - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection.at time of inspection i observed an construction site,during inspection noted:at exposure#4 missing fence.this creating hazardous condition to
Apr 13, 2021 · Penalty $500
Resolve - Class - 2
Failure to maintain building walls or appurtenances. the front porch ceiling has collapsed & the remaining wooden ceiling is deteriorating &in danger of collapsing. the (sofit) at roof is deteriorating and
Jan 25, 2012 · Penalty $500
Resolve - Hazardous
Failure to maintain exterior bldg walls defect noted brick garage are cracked spalling throut parapet walls wood shacks erected at rear all in dis repair all in danger of collapsing on to baily are as stated
Sep 4, 2003 · Penalty $2,000
Resolve - Non-hazardous
Illegal use in a residential district. illegal use- dead storage of approx 10 motor vehicles. also auto repair in garage. residential zone r6- remedy: discontinue illegal use.
Jul 14, 2003 · Penalty $480
Resolve - Non-hazardous
Work without permit: work noted: constructed wooden structures out of plywood, 2x4's for franicks addedd wood burning stove for heat also built strutures on edge of incline at rear of property- in danger of col
Jul 14, 2003 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior build walls: defects noted: brick garages are cracked & spalling throut parapit walls. wood shacks erected are in disrepair & are illegal structures as stated in cosntruction with v
Jul 14, 2003 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
Sep 14, 2026 · Apt 213
Close - Water leak
Damp spot
Sep 14, 2026 · Apt 213
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 213
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 213
Close - Water leak
Slow leak
Sep 4, 2026 · Apt 203
Close - Plumbing
Radiator
Sep 4, 2026 · Apt 203
Close - Unsanitary condition
Pests
Sep 4, 2026 · Apt 203
Close - Paint/plaster
Wall
Sep 4, 2026 · Apt 203
Close - Paint/plaster
Wall
Sep 4, 2026 · Apt 203
Close - Electric
Wiring
Aug 20, 2026 · Apt 508
Close
Show 17 more ↓
- Paint/plaster
Wall
Aug 20, 2026 · Apt 508
Close - Unsanitary condition
Pests
Aug 20, 2026 · Apt 508
Close - Unsanitary condition
Pests
Aug 20, 2026 · Apt 508
Close - Door/window
Window frame
Jun 26, 2026 · Apt 309
Close - Unsanitary condition
Pests
Jun 23, 2026 · Apt 604
Close - Door/window
Window frame
Jun 22, 2026 · Apt 309
Close - Unsanitary condition
Garbage/recycling storage
Jun 22, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 22, 2026 · Apt 309
Close - Water leak
Heavy flow
Feb 23, 2026 · Apt 313
Close - Paint/plaster
Ceiling
Feb 23, 2026 · Apt 313
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Jan 28, 2026 · Apt 313
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 508
Close - Water leak
Heavy flow
Nov 6, 2025 · Apt 312
Close - Heat/hot water
Entire building
Jul 21, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 20, 2025 · Apt 1
Close - Electric
No lighting
Apr 25, 2025 · Apt 510
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2022
- Floors
- 7
- Residential units
- 113
- Building area
- 120,781 ft²
- Lot area
- 31,767 ft²
- Zoning
- R6
- Community board
- 207
- Council district
- 14
- Block / lot
- 3237 / 9
- Assessed value
- $8,645,400
- Landmark / historic district
- No
HPD registration #229075, last renewed Aug 25, 2025.
Questions about 2501 Sedgwick Avenue
Who owns 2501 Sedgwick Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2499 Sedgwick Development LLC.
Does 2501 Sedgwick Avenue have violations?
Yes. NYC HPD has recorded 28 housing violations at this property.
Is 2501 Sedgwick Avenue rent stabilized?
NYC Department of Finance tax bills listed 113 rent-stabilized units here in 2024 (about 100% of its 113 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2501 Sedgwick Avenue built?
City records list 2022 as the year it was built.
How many apartments are in 2501 Sedgwick Avenue?
It has 113 residential units and 115 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.