2519 Sedgwick Avenue
Bronx, NY 10468BBL 2-03237-0156Map
Owner of record: 2519 Sedgwick LLC
2519 Sedgwick Avenue is an elevator apartment building built in 2023 in Bronx, 10468. It has 40 residential units across 7 floors. The owner of record is 2519 Sedgwick LLC. HPD has recorded 10 housing violations here, most recently on September 26, 2026. 8 of the 10 most recent violations are still open.
- HPD violations
- 10
- DOB violations
- 0
- ECB violations
- 6
- HPD complaints
- 43
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 10
- BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Sep 26, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom/bell buzzer from panel at building entrance to south wall in the foyer located at apt 3g, 3rd story, 1st apartment from north at east
Sep 20, 2026 · Apt 3G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom/bell buzzer from panel at building entrance to east wall in the foyer located at apt 3a, 3rd story, 1st apartment from south at west
Sep 20, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the bathroom located at apt 3e, 3rd story, 3rd apartment from south at west
Apr 28, 2026 · Apt 3E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchenette located at apt 4g, 4th story, 1st apartment from north at east
Feb 11, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the kitchenette located at apt 4g, 4th story, 1st apartment from north at east
Feb 11, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 4th apartment from north at east
Dec 6, 2025 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercome at north wall privet hall in the private hallway located at apt 2b, 2nd story, 4th apartment from north at east
Dec 6, 2025 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 4th apartment from north at east
Dec 6, 2025 · Apt 2B
Closed — Violation closed
DOB building violations · 0
No DOB violations on record
ECB violations · 6
- Class - 1
Active jobsite with construction activities, inadequate safety measures- i observed missing handrails at multiple locations at stairway, missing guardrail systems at unenclosed leading edges at floor levels and
Sep 8, 2023 · Penalty $2,500
Resolve - Class - 1
Active jobsite, i observed existing pipe scaffold in places at exposure-1&3 missing guardrail systems(3314.8.1) platform not fully planked & secured(3314.5.5) inadequate debris netting(3314.8.2) wide gaps more
Sep 8, 2023 · Penalty $2,500
Resolve - Class - 2
Active jobsite with construction activities. i observed in place at elevator shaft with installed temporary platform used in supporting pipe scaffold, upon request for engineers approved design drawing for comp
Sep 8, 2023
Resolve - Class - 2
Active jobsite with construction activities. i observed existing pipe scaffold installed on sw shed in place at exposure-1 on sidewalk , upon request for load imposed letter, stamped, signed & sealed by registe
Sep 8, 2023
Resolve - Class - 2
Failure to provide safety measure where required at time of inspection of nb 7 story building active jobsite observed steel rebars on retaining wall not capped this condition buts workers on dangerous of injuri
Jun 23, 2023
Resolve - Class - 2
At time of inspection of nb 7 story building active jobsite observed steel beams welded to base plates and base plates bolted on retaining walls upon review steel structural drawing it was only showing base pla
Jun 23, 2023 · Penalty $3,125
Resolve
Complaints
- General
Janitor/super
Sep 19, 2026 · Apt 3G
Close - General
Bell/buzzer/intercom
Sep 19, 2026 · Apt 3G
Close - General
Bell/buzzer/intercom
Aug 25, 2026 · Apt 3A
Close - General
Bell/buzzer/intercom
Jul 28, 2026 · Apt 3G
Close - Door/window
Door
Jun 23, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Apr 11, 2026 · Apt 3E
Close - Water leak
Slow leak
Feb 9, 2026 · Apt 4G
Close - Paint/plaster
Wall
Feb 9, 2026 · Apt 4G
Close - Paint/plaster
Ceiling
Feb 9, 2026 · Apt 4G
Close - Paint/plaster
Ceiling
Feb 9, 2026 · Apt 4G
Close
Show 33 more ↓
- Paint/plaster
Wall
Feb 9, 2026 · Apt 4G
Close - Door/window
Door
Feb 9, 2026 · Apt 4G
Close - General
Bell/buzzer/intercom
Jan 7, 2026 · Apt 3G
Close - Plumbing
Toilet
Dec 6, 2025 · Apt 2B
Close - General
Bell/buzzer/intercom
Dec 3, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 7, 2025 · Apt 2B
Close - General
Bell/buzzer/intercom
Nov 7, 2025 · Apt 2B
Close - General
Bell/buzzer/intercom
Nov 7, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 7, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Aug 6, 2019 · Apt 3H
Close - Plumbing
Bathtub/shower
Aug 6, 2019 · Apt 3H
Close - Plumbing
Bathtub/shower
Aug 6, 2019 · Apt 3H
Close - Plumbing
Basin/sink
Aug 6, 2019 · Apt 3H
Close - Plumbing
Basin/sink
Aug 6, 2019 · Apt 3H
Close - Unsanitary condition
Mold
Aug 6, 2019 · Apt 3H
Close - Door/window
Window frame
Aug 6, 2019 · Apt 3H
Close - Unsanitary condition
Pests
Aug 6, 2019 · Apt 3H
Close - Plumbing
Basin/sink
Aug 6, 2019 · Apt 3H
Close - Door/window
Window frame
Aug 6, 2019 · Apt 3H
Close - Flooring/stairs
Floor
Aug 6, 2019 · Apt 3H
Close - General
Cabinet
Aug 6, 2019 · Apt 3H
Close - Plumbing
Basin/sink
Aug 6, 2019 · Apt 3H
Close - Paint/plaster
Ceiling
Aug 6, 2019 · Apt 3H
Close - Door/window
Window frame
Aug 6, 2019 · Apt 3H
Close - Flooring/stairs
Floor
Aug 6, 2019 · Apt 3H
Close - Plumbing
Radiator
Aug 6, 2019 · Apt 3H
Close - Door/window
Window frame
Aug 6, 2019 · Apt 3H
Close - Paint/plaster
Ceiling
Aug 6, 2019 · Apt 3H
Close - Paint/plaster
Wall
Aug 6, 2019 · Apt 3H
Close - Paint/plaster
Ceiling
Aug 6, 2019 · Apt 3H
Close - Paint/plaster
Wall
Aug 6, 2019 · Apt 3H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2023
- Floors
- 7
- Residential units
- 40
- Building area
- 34,578 ft²
- Lot area
- 9,348 ft²
- Zoning
- R6
- Community board
- 207
- Council district
- 14
- Block / lot
- 3237 / 156
- Assessed value
- $2,628,450
- Landmark / historic district
- No
HPD registration #229260, last renewed Jul 16, 2025.
Questions about 2519 Sedgwick Avenue
Who owns 2519 Sedgwick Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2519 Sedgwick LLC.
Does 2519 Sedgwick Avenue have violations?
Yes. NYC HPD has recorded 10 housing violations at this property.
Is 2519 Sedgwick Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2519 Sedgwick Avenue built?
City records list 2023 as the year it was built.
How many apartments are in 2519 Sedgwick Avenue?
It has 40 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.