117 Father Zeiser Place
Bronx, NY 10468BBL 2-03219-0216Map
Owner of record: 118 Realty Assoc., LLC
117 Father Zeiser Place is a walk-up apartment building built in 1916 in Bronx, 10468. It has 27 residential units across 5 floors. The owner of record is 118 Realty Assoc., LLC. HPD has recorded 79 housing violations here, most recently on June 24, 2026. 24 of the 50 most recent violations are still open. City tax records listed 27 rent-stabilized apartments here in 2024.
- HPD violations
- 79
- DOB violations
- 3
- ECB violations
- 0
- HPD complaints
- 117
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 79
- BHazardous
Properly repair with similar material the broken or defective marble saddle at entrance in the bathroom located at apt 3a, 3rd story, 1st apartment from south at west
Jun 24, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 3a, 3rd story, 1st apartment from south at west
Jun 24, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3a, 3rd story, 1st apartment from south at west
Jun 24, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Remove the illegal fastening consisting of a double cylinder lock at entrance door to apt in the foyer located at apt 3a, 3rd story, 1st apartment from south at west
Jun 24, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch and lock at building entrance door, (street to vesibule) at public hall, 1st story
Mar 4, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective defective latch and its assemblies at building entrance door, from street to vestibule, at public hall, 1st story
Mar 4, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door
Feb 8, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance
Feb 8, 2026
Closed — Violation closed
Show 40 more ↓
- BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Jan 30, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door at basement
Jan 25, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 25, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance at basement
Jan 25, 2026
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 4th, and 2nd story balcony at 1st fire escape from west at south exterior wall at fire escape
Nov 8, 2025
Closed — Violation dismissed - BHazardous
Provide adequate lighting at ceiling at fire passage way
Nov 8, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of locking assembly at building entrance door
Oct 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 2nd apartment from east at south
Jul 11, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt 2b, 2nd story, 2nd apartment from east at south
Jul 11, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1a, 1st story, 1st apartment from north at east
Feb 6, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Feb 6, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective at intermediate landing east wall at public hall stairs, 3rd story
Feb 6, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the intermediate landing at east wall at public hall stairs, 3rd story
Feb 6, 2024
Closed — Violation dismissed - BHazardous
Refit wood door in the 1st room from north at east located at apt 2b, 2nd story, 2nd apartment from east at south
Sep 15, 2023 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 2nd apartment from east at south
Sep 15, 2023 · Apt 2B
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... approx 10sq ft at ceiling approx 10sq ft at south wall in the bathroom located at apt 2b, 2nd story, 2nd apartment from east at south
Sep 15, 2023 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 2b, 2nd story, 2nd apartment from east at south
Sep 15, 2023 · Apt 2B
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2b, 2nd story, 2nd apartment from east at south
Sep 15, 2023 · Apt 2B
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2b, 2nd story, 2nd apartment from east at south
Sep 15, 2023 · Apt 2B
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Sep 11, 2023
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Properly secure the loose wash basin at south wall in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wash basin drain line in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the celing in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper and lower window sash spring counter balance in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1e, 1st story, 1st apartment from north at east
Jun 12, 2023 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5e, 5th story, 1st apartment from north at east
Mar 30, 2022 · Apt 5E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall at public hall stairs, 3rd story
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall stairs, 3rd story
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approximately 4 sq.ft at ceilings and west wall in the kitchen located at bsmt-apt b, 1st bsmt-apt from south at west
Aug 13, 2021 · Apt B
Closed — Violation closed
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Flooring/stairs
Floor
Jun 17, 2026 · Apt 3A
Close - Plumbing
Water supply
May 6, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt 5E
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 17, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt BLDG
Close - General
Bell/buzzer/intercom
Nov 29, 2025 · Apt 3A
Open - Heat/hot water
Entire building
Nov 29, 2025 · Apt 3A
Close - General
Janitor/super
Nov 29, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 24, 2025 · Apt 4E
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Nov 16, 2025 · Apt BLDG
Close - General
Bell/buzzer/intercom
Nov 14, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 14, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 10, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt BLDG
Close - Appliance
Refrigerator
Jun 18, 2025 · Apt 2B
Close - Unsanitary condition
Pests
Jun 18, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Jun 18, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Mar 11, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Mar 6, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Mar 5, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Feb 8, 2025 · Apt 5E
Close - Heat/hot water
Apartment only
Feb 3, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Jan 29, 2025 · Apt 5E
Close - Heat/hot water
Apartment only
Jan 14, 2025 · Apt 5E
Close - Unsanitary condition
Mold
Sep 12, 2023 · Apt 2B
Close - Door/window
Door
Sep 12, 2023 · Apt 2B
Close - Flooring/stairs
Floor
Sep 12, 2023 · Apt 2B
Close - Unsanitary condition
Pests
Sep 12, 2023 · Apt 2B
Close - Unsanitary condition
Pests
Sep 12, 2023 · Apt 2B
Close - Plumbing
Bathtub/shower
Sep 12, 2023 · Apt 2B
Close - Paint/plaster
Ceiling
Jun 8, 2023 · Apt 1E
Close - Paint/plaster
Ceiling
Jun 8, 2023 · Apt 1E
Close - Plumbing
Basin/sink
Jun 8, 2023 · Apt 1E
Close - Door/window
Door
Dec 2, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2022 · Apt BLDG
Close - General
Janitor/super
Mar 15, 2022 · Apt 5E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1916
- Floors
- 5
- Residential units
- 27
- Building area
- 22,000 ft²
- Lot area
- 5,033 ft²
- Zoning
- R6
- Community board
- 207
- Council district
- 14
- Block / lot
- 3219 / 216
- Assessed value
- $855,000
- Landmark / historic district
- No
HPD registration #201930, last renewed Sep 9, 2025.
Questions about 117 Father Zeiser Place
Who owns 117 Father Zeiser Place?
The owner of record in NYC Department of City Planning PLUTO data is 118 Realty Assoc., LLC.
Does 117 Father Zeiser Place have violations?
Yes. NYC HPD has recorded 79 housing violations at this property.
Is 117 Father Zeiser Place rent stabilized?
NYC Department of Finance tax bills listed 27 rent-stabilized units here in 2024 (about 100% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 117 Father Zeiser Place built?
City records list 1916 as the year it was built.
How many apartments are in 117 Father Zeiser Place?
It has 27 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.