115 Father Zeiser Place is a walk-up apartment building built in 2020 in Bronx, 10468. It has 9 residential units across 4 floors. The owner of record is Iconic Towers Incorporated. HPD has recorded 67 housing violations here, most recently on October 6, 2026. 46 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2024.

HPD violations
67
DOB violations
5
ECB violations
39
HPD complaints
45

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 6, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
14
About 100% of the building's 9 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 67

  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 6, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing information at public hall, 1st story

    Oct 6, 2026

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Oct 6, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Oct 6, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Sep 16, 2026 · Apt 1B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Sep 16, 2026 · Apt 1B

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective bell buzzerr intercom system from building front at west wall in the 1st room from north at west located at apt 1b, 1st story, 1st apartment from north at east

    Sep 16, 2026 · Apt 1B

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the 1st room from north at west located at apt 1b, 1st story, 1st apartment from north at east

    Sep 16, 2026 · Apt 1B

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls at public hall, 1st story

    Sep 16, 2026

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling and west wall at public hall, 1st story

    Sep 16, 2026

    Open — Nov sent out
Show 40 more ↓
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 16, 2026

    Open — Nov sent out
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 16, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Sep 16, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ..... at public hall, 1st story

    Sep 16, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing information at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at door leading to rear yard at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at staircase door at public hall stairs, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Sep 4, 2026 · Apt 1B

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Sep 4, 2026 · Apt 1B

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Sep 4, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Aug 12, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective window frame at west window in the 2nd room from north located at apt 4a, 4th story, 1st apartment from south at west

    Aug 12, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective rubber gasket at refrigerator door in the kitchen located at apt 4a, 4th story, 1st apartment from south at west

    Aug 12, 2026 · Apt 4A

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective lock and assembley at building entrance door , 1st story

    May 31, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 11, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 1b, 1st story, 1st apartment from north at east

    Jan 15, 2026 · Apt 1B

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch set at door in the entrance located at apt 1b, 1st story, 1st apartment from north at east

    Jan 15, 2026 · Apt 1B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Jan 15, 2026 · Apt 1B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Jan 15, 2026 · Apt 1B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st story

    Jan 15, 2026

    Closed — Violation closed
  • B

    Refit doors at 1st closet from from east at south in the 1st room from east at north located at apt 1b, 1st story, 1st apartment from north at east

    Jan 15, 2026 · Apt 1B

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective base cabinet at west wall in the kitchen located at apt 1b, 1st story, 1st apartment from north at east

    Jan 15, 2026 · Apt 1B

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Jan 15, 2026 · Apt 1B

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective latch set at building entrance door , 1st story

    Jan 15, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective door & frame in the entrance located at apt 1b, 1st story, 1st apartment from north at east

    Mar 5, 2025 · Apt 1B

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Mar 5, 2025 · Apt 1B

    Open — Notice of issuance sent to tenant
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 25, 2024

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north

    Aug 18, 2024 · Apt 1B

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 1b, 1st story, 1st apartment from west at north

    Aug 18, 2024 · Apt 1B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective base cabinet at west wall in the kitchen located at apt 1b, 1st story, 1st apartment from west at north

    Aug 18, 2024 · Apt 1B

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Aug 17, 2024 · Apt 1B

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from north at east

    Aug 17, 2024 · Apt 1B

    Open — Notice of issuance sent to tenant
  • A

    Properly repair with similar material the broken or defective woodbase cabinet under sink in the kitchen located at apt 1b, 1st story, 1st apartment from north at east

    Aug 17, 2024 · Apt 1B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchenette located at apt 1b, 1st story, 1st apartment from north at east

    Aug 17, 2024 · Apt 1B

    Open — Nov sent out
  • A

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard

    Aug 17, 2024

    Open — Nov sent out

DOB building violations · 5

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 30, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 30, 2020

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jan 31, 2020

    Vp*-violation unserved ecb- dismissed
  • Construction other optional

    C-construction other optional

    Jan 31, 2020

    Vp*-violation unserved ecb- dismissed

ECB violations · 39

  • Class - 1

    Failure to safeguard/failure to maitain safety operations.(no control access zones)(caz)noted: at time of inspection of a 4 sty nb under construction: i observed a cmu wall being constructed at exp#1. workers

    Aug 13, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Sec. bc 3309.1 failure to provide protection of adjoining property/inadequate protection of(windows). noted: at time of inspection of a 4 sty nb under construction. i observed cmu wall built approx 24 inches

    Aug 13, 2020 · Penalty $625

    Resolve
  • Class - 2

    Housekeeping (maintenance) at time of my inspection i observed that lumber and rock debris were acculmaing in th rear yard at exposure #3 for worker safety code stipulates that all areas shall be maintai

    Aug 6, 2020 · Penalty $625

    Resolve
  • Class - 2

    Bc3307.6.5.4- storage of placement of items on sidewalk shed. at the time of my inspection i observed debris and steel demolished code stipulates that no item shall be stored or placed upon a sidewalk shed

    Aug 6, 2020

    Resolve
  • Class - 2

    At time of inspection,observed ongoing construction activities contrary to mayor's emergency executive order 120 and subsequent orders incorporating requirements of governor's executive order 202.34 and subsequ

    Jul 8, 2020

    Resolve
  • Class - 1

    Failure to maintain/display on site documents(documents to be kept on site).noted:at time of inspection of a 4 story nb under construction,upon request of construction documents sws drawing plan sws periodic 6

    Jul 1, 2020

    Resolve
  • Class - 1

    Failure to maintain/display site documents(documents to be kept on site)noted:at time of inspection of a 4 story nb under construction upon request of construction documents sws drawing plans,periodic 6 mo sws

    Jul 1, 2020

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway.at the time of inspection noted construction sidewalk shed erected at exposure # 1 obstructing adjacent property apartment # 1a fire escape window., remove obstru

    Jun 10, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    28-104.7.1 p architectural/structural plans are not adequate in that plans are not complete & sufficient clarity to advocate entire nature & safety on the site safety plans. i time of inspection i observed an

    Jun 8, 2020

    Resolve
  • Class - 2

    Bc-3301.6.1 failure to provide design drawing. i time of inspection i observed ana ctive const site with cmu block walls on prgress, during inspection noted: temporary platform overhead protection install at

    Jun 8, 2020

    Resolve
Show 29 more ↓
  • Class - 2

    Failure to post no smoking signs at construction/demo site per fire code.i time of inspection,i observed an active construction site with cmu block walls on the 2nd floor on progress.during inspection noted at

    Jun 8, 2020

    Resolve
  • Class - 2

    Failure to posy no smoking signs @construct/demo site per fire (cope) i time of inspection i observed an active const site with cmu block walls on the 2nd floor on prgress, during inspection word @the 1st & 2nd

    Jun 8, 2020

    Resolve
  • Class - 2

    28-104.7.1 & bc 1603.1 architectural/structural plans are not adequate in that plans are not complete and sufficient clarity to indicate entire nature and safety on the site safety plans.the time of inspection

    Jun 8, 2020

    Resolve
  • Class - 1

    Failure to provide pedestrian for sidewalks and walkways.the time of inspection i observed an active construction site with cmu block walls and boom truck delivery on progress,during inspection noted the boom t

    Jun 8, 2020 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to provide pedestrian protection for sidewalks & walkways i time of inspection i observed an active const site with cmy block walls&boom truck delivery on progress during inspection noted the boom true

    Jun 8, 2020

    Resolve
  • Class - 2

    Bc 3301.6.1 failure to provide design drawings.the time of inspection i observed an active construction site with cmu block wall on progress,during inspection noted (thruway)platform i observed protection insta

    Jun 8, 2020

    Resolve
  • Class - 1

    Bc3301.2 no overhead protection.at time of inspection observed at active construction site w/masonry work in progress at 2nd fl.during inspection noted that there is no overhead protection at exposure #1,2,3 &

    Mar 17, 2020

    Resolve
  • Class - 1

    Failure to provide means of egress.at time of inspection observed an active construction site with masonry work in progress at 2nd floor.during inspeciton noted a supported scaffold in place at exposure#2 and 4

    Mar 17, 2020 · Penalty $625

    Resolve
  • Class - 1

    28-105.12.8 inadequate site safety plans.at time of inspection observed an active construction site w/masonry work in progress.during inspection noted that the site safety plans do not show the sidewalk shed

    Mar 17, 2020

    Resolve
  • Class - 1

    No safety orientation logs on site.at time of inspection observed an active consruction site w/masonry work in progress at 2nd fl.during inspection i requested for the safety orientation logs & the competent

    Mar 17, 2020 · Penalty $625

    Resolve
  • Class - 1

    Inadequate sidewalk shed.at time of inspection observed an active construction site w/masonry work in progress at 2nd fl.during inspection noted that the sidewalk shed did not has the 5 ft extension at expo#4

    Mar 17, 2020

    Resolve
  • Class - 1

    Competent person{failure to designate competent person}at the time of my inspection,i observed that the name of the competent person in the letter provided did not match the name of the competent person on site

    Jan 31, 2020 · Penalty $10,000

    Resolve
  • Class - 1

    Documents to be kept on site{optical reports,vibration monitoring reports and neighboring and neighboring property agreements}at the time ofmy inspection,the competent perosn and property owner on site did not

    Jan 31, 2020

    Resolve
  • Class - 1

    Failure to designate a competent person.at the time of my inspection,iobserved that the name of the competent person in the letter provided did not match the name of the competent person on site.code stipulates

    Jan 31, 2020

    Resolve
  • Class - 1

    Work contrary to plans{location of exposure 1 fence)at the time of my inspection,i observed that the construciton fence at exposure 1 was not installed per the site safety plan,and that it was jutting into 4 po

    Jan 31, 2020 · Penalty $625

    Resolve
  • Class - 1

    Control of debris.at the time of my inspection,i observed debris beingfiled against the construction fence at exposure 1.code stipulates that debris shall be removed from the site by the endof the shift,or be p

    Jan 31, 2020

    Resolve
  • Class - 1

    Bc3307.7 failure to secure site(fences)at the time of my inspection,i observed that the job site was accessible from the adjoining property at exposure 4.code stipulates that all sites where a new building is b

    Jan 31, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Control of debris.at the time of my inspection,i observed debris beingpiled against the construction fence at exposure 1.code stipulates that debris shall be removed from the site by the end of the shift or be

    Jan 31, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to notify department prior to earthwork.at the time of my inspection,i observed evidence of earthwork having been performed.specifically,ref new retaining walls and foundation walls & footings were cons

    Jan 31, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Logs{failure to observed unsafe conditions,and to print and sign name of construction superintendent}at the time of my inspection,i observedthat the project log did not contain a complete record of unsafe condi

    Jan 31, 2020

    Resolve
  • Class - 1

    Documents to be kept on site{optical and vibration monitoring reports and neighboring property agreements}at the time of my inspection,the competent person and property owner on site did not have all the requi

    Jan 31, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Work contrary to plans{foundation plans}at the time of my inspection,iobserved that the foundation as built did not conform with the approved construction drawings.the foundation plans show a foundation wall be

    Jan 31, 2020

    Resolve
  • Class - 1

    Work contrary to plans{foundation plans}at the time of my inspection,iobserved that the foundation as built did not conform with the approved construction drawings.the foundations plans show a foundation wall/f

    Jan 31, 2020

    Resolve
  • Class - 1

    Logs{failure to observed unsafe conditions and to print and sign name of construciton superintendent}at the time of my inspection,i observedthat the project log did not contain a complete record of unsafe condi

    Jan 31, 2020

    Resolve
  • Class - 1

    Locatoin of fence {exposure 1}.work contrary to plans.at time of my inspection,i observed that the construction fence at exposure 1 was not built per the site safety plans,and that it was jutting into a portion

    Jan 31, 2020 · Penalty $5,030

    Resolve
  • Class - 1

    Failure to notify department prior to earthwork.at the time of my inspection,i observed evidence of earthwork having been done.futher research on bis informed me that no notification of commencement prior to ea

    Jan 31, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc33077-failure to secure site{fences}at the time of my inspection,i observed that the job site was accessible from the adjoining property at exposure 4.code stipulates that all sites where a new building is be

    Jan 31, 2020

    Resolve
  • Class - 1

    Failure to notify. upon review of dept records-dob bis. at time of demolition sign off inspection-bldg down. no notification date for start of demolition work was given for 113 west 188 st,bronx as required by

    Aug 21, 2019 · Penalty $2,500

    Resolve
  • Non-hazardous

    Work w/o a permit work noted at the yard of house changin the elevation of property by removing the soil and bedrock at rear yard to meet the 1st floor elevation remedy : stop all work obtain all necessary perm

    Feb 6, 2003

    Resolve

Complaints

  • Electric

    Outlet/switch

    Oct 2, 2026 · Apt 3A

    Close
  • Plumbing

    Basin/sink

    Oct 2, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Oct 2, 2026 · Apt 3A

    Close
  • Electric

    Outlet/switch

    Sep 21, 2026 · Apt 3A

    Close
  • General

    Bell/buzzer/intercom

    Sep 21, 2026 · Apt 3A

    Close
  • Electric

    No lighting

    Sep 21, 2026 · Apt 3A

    Close
  • Water leak

    Heavy flow

    Sep 21, 2026 · Apt 3A

    Close
  • General

    Cabinet

    Aug 3, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Pests

    Aug 3, 2026 · Apt 4A

    Close
  • Door/window

    Door frame

    Aug 3, 2026 · Apt 4A

    Close
Show 35 more ↓
  • Paint/plaster

    Wall

    Aug 3, 2026 · Apt 4A

    Close
  • Plumbing

    Basin/sink

    Aug 3, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Aug 3, 2026 · Apt 4A

    Close
  • Appliance

    Refrigerator

    Aug 3, 2026 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Jan 5, 2025 · Apt 1B

    Close
  • General

    Cabinet

    Dec 27, 2024 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Dec 27, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Dec 27, 2024 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Aug 16, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Aug 16, 2024 · Apt 1B

    Close
  • Water leak

    Slow leak

    Aug 15, 2024 · Apt 1B

    Close
  • Electric

    Wiring

    Aug 15, 2024 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Aug 15, 2024 · Apt 1B

    Close
  • General

    Cabinet

    Aug 15, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Aug 15, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Aug 15, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Jul 29, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Jul 29, 2024 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Jul 29, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    Jul 29, 2024 · Apt 1B

    Close
  • General

    Cabinet

    May 23, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Pests

    May 23, 2024 · Apt 1B

    Close
  • Plumbing

    Basin/sink

    May 23, 2024 · Apt 1B

    Close
  • Plumbing

    Toilet

    May 23, 2024 · Apt 1B

    Close
  • Door/window

    Door

    May 23, 2024 · Apt 1B

    Close
  • Electric

    Lighting

    May 23, 2024 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    May 10, 2024 · Apt 1B

    Close
  • Paint/plaster

    Wall

    May 10, 2024 · Apt 1B

    Close
  • Electric

    Lighting

    May 10, 2024 · Apt 1B

    Close
  • General

    Cabinet

    May 10, 2024 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    May 10, 2024 · Apt 1B

    Close
  • Electric

    Outlet/switch

    May 10, 2024 · Apt 1B

    Close
  • Door/window

    Door

    May 10, 2024 · Apt 1B

    Close
  • Electric

    Wiring

    May 10, 2024 · Apt 1B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
2020
Floors
4
Residential units
9
Building area
6,120 ft²
Lot area
2,770 ft²
Zoning
R6
Community board
207
Council district
14
Block / lot
3219 / 214
Assessed value
$689,400
Landmark / historic district
No

HPD registration #228701, last renewed Oct 7, 2025.

Questions about 115 Father Zeiser Place

Who owns 115 Father Zeiser Place?

The owner of record in NYC Department of City Planning PLUTO data is Iconic Towers Incorporated.

Does 115 Father Zeiser Place have violations?

Yes. NYC HPD has recorded 67 housing violations at this property.

Is 115 Father Zeiser Place rent stabilized?

NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 100% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 115 Father Zeiser Place built?

City records list 2020 as the year it was built.

How many apartments are in 115 Father Zeiser Place?

It has 9 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.