2259 Creston Avenue
Bronx, NY 10453BBL 2-03171-0031Map
Owner of record: 2259 Realty LLC
2259 Creston Avenue is an elevator apartment building built in 1937 in Bronx, 10453. It has 42 residential units across 6 floors. The owner of record is 2259 Realty LLC. HPD has recorded 429 housing violations here, most recently on October 2, 2026. 38 of the 50 most recent violations are still open. City tax records listed 41 rent-stabilized apartments here in 2024.
- HPD violations
- 429
- DOB violations
- 41
- ECB violations
- 15
- HPD complaints
- 871
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 429
- CImmediately hazardous
Properly repair or replace the broken or defective locking device at building entrance door at public hall, 1st story
Oct 2, 2026
Open — Invalid certification - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at compact closet at public hall, 1st story
Aug 19, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling , 1st story
Aug 19, 2026
Open — Nov certified on time - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the entire apartment located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective door in the entrance in the 3rd room from north at west located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the compactor closets at all stories at public hall
Jul 24, 2026
Open — Nov certified on time - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Civ14 mailed
Show 40 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the 2nd room from north at east located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 3rd apartment from east at south
Jul 24, 2026 · Apt 2B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at building entrance door. at public hall, 1st story
Jul 24, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door , 1st story
Jul 18, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox signage missing at public hall, 1st story
Jul 9, 2026
Open — Not complied with - BHazardous
Provide approved glass inplace of plexiglass at building entrance door at 1st story
Jul 9, 2026
Open — Not complied with - BHazardous
Provide approved glass inplace of plexiglass at vestibule door at public hall at 1st story
Jul 9, 2026
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of plexiglass installed at vestibule door at public hall at 1st story
Jul 9, 2026
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of plexiglass installed at building entrance door at 1st story
Jul 9, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall at 1st story
Jul 9, 2026
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 9, 2026
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage and trash at compactor closet, 1st story
Jul 9, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at building entrance door at 1st story
Jul 9, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at compactor closet at public hall, 1st story
May 31, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2b, 2nd story, 2nd apartment from east at south , section ''a-d'', at west
May 26, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal upper escutcheon plate at steam riser in the bathroom located at apt 2b, 2nd story, 2nd apartment from east at south , section ''a-d'', at west
May 26, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective metal upper escutcheon plate at steam riser in the kitchen located at apt 2b, 2nd story, 2nd apartment from east at south , section ''a-d'', at west
May 26, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchen located at apt 2b, 2nd story, 2nd apartment from east at south , section ''a-d'', at west
May 26, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2b, 2nd story, 2nd apartment from east at south , section ''a-d'', at west
May 26, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective floor tile in the kitchen located at apt 2b, 2nd story, 2nd apartment from east at south , section ''a-d'', at west
May 26, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood door in the 2nd room from north at east located at apt 2b, 2nd story, 2nd apartment from east at south , section ''a-d'', at west
May 26, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b , 2nd story, 2nd apartment from east at south , section ''a-d'', at west
May 26, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Provide fuse box cover at east wall in the private hallway located at apt 2b, 2nd story, 2nd apartment from east at south , section ''a-d'', at west
May 26, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
May 26, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at compactor closet, 6th story
May 13, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective entrance door in the 1st room from east at north located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at 2nd window from north at east in the 1st room from east at north located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east at north located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Properly secure the loose counter top and sink base cabinet in the kitchen located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet handle in the bathroom located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroom located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden base at lower cabinet at washbasin in the bathroom located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective broken glass at lower window sash in the 1st room from east at north located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective doors at sink base cabinet in the kitchen located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wooden base cabinet doors at sink in the kitchen located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ciling in the 1st room from east at south located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at observed droppings in the entire apartment located at apt 6f, 6th story, 1st apartment from north at east
May 13, 2026 · Apt 6F
Open — Notice of issuance sent to tenant
DOB building violations · 41
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2024
Dob violation - active - Construction other optional
Emergency work due to cracked facade masonry bricks at multiple locati ons of exp#1(east)& cracked chimney bricks at exp#4(north)also cracked window sills at exp#3(west)remedy:immediately take and provide safety measures to protect the public and install protection at exp#1(east)ma ke immediate repair under the supervision of a licensed professional
Mar 21, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - active
Show 31 more ↓
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 10, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 3, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 27, 2017
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 8, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 16, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 2, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 20, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 19, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 7, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 18, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 31, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2003
Dob violation - resolved - Elevator elevatorrequired
2p1828
Jul 31, 2002
Dob violation - resolved - Elevator elevatorrequired
2p1828
Mar 27, 2001
Dob violation - resolved - Elevator elevatorrequired
2p1828
Dec 13, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatorrequired
(51)clean car top.(52)repair light on top of car
Aug 11, 1988
Dob violation - resolved
ECB violations · 15
- Class - 1
Rts class 1: failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condition
Apr 9, 2026 · Penalty $1,250
Active - Class - 1
Unlawful acts, failure to comply with the commissioner's order.-note: respondent has failed to comply with previous viol #35683635r dated 07/08/2024 requiring maintenance/repair of defective facade.-at time of
Aug 21, 2024 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code-compliant manner. notes: observedat exp. #1(east) cracked brick masonry at multiple locations between 2nd and 6th floor. (2)inadequate repair brick masonry over building mai
Jul 8, 2024 · Penalty $3,125
Active - Class - 1
Failure to maintain building in a code compliant manner.observed at exp#1(east elev)cracked/bulging facade masonry bricks at multiple locations between 2nd and 6th floor.cracked windowsills between 4th and 6th
Mar 21, 2024 · Penalty $1,250
Active - Class - 1
Class 1 violation, no door restrictor on device remedy; provide and install then notify nycdob of working completed and a inspection can be completed, class 2, brake tag expired remedy.; provide up to date tag,
Jun 5, 2021 · Penalty $6,250
Active - Class - 2
Failure to comply with the commissioners order to file a certficate of correction with the dept of bldgs for ecb violation #34787309l-remedy to obtain permit or remove partition wall at living room at apt 1d no
May 18, 2010 · Penalty $4,000
Resolve - Class - 3
Work w/o a permit. work noted: partition sheetrock wall with door withkeyed lock at living room creating an additional room at apt 1d 1st flr. remedy: obtain permit or restore to prior legal condition.
Sep 22, 2009 · Penalty $500
Active - Non-hazardous
Failure to provide elevator landing sign that shall read: <<in case offire use stairs, unless otherwise instructed>> at the elevator bank, on fl 2 to 6. remedy: install sign as per local law 16 1984.
Apr 2, 2007
Resolve - Non-hazardous
16j10 16-properly adjust b floor door, also replace door check.
May 13, 2005
Resolve - Non-hazardous
75b16-09g12-15l01-50f09-46b01. 75-date of tag 7/94 15-3 floor slams on close 50-f-09 eliminate back tash 46-provide proper tention, slipping on sheave.
Aug 5, 2002 · Penalty $180
Resolve
Show 5 more ↓
- Non-hazardous
75u05, 57o02, 31q03, 31 basement wall
Sep 19, 2001 · Penalty $350
Resolve - Non-hazardous
Work without a permit work noted:2nd fl. window lintels having exposed the structural steel column remedy:obtain all necessary permits
May 1, 2001
Resolve - Hazardous
54r12,08v01,50y14,18l11,31q03,74l11,50f11,75u16,35m07, 54)fuse jamped 18)lock boxes loose lobby,3rd and 6th floors.74)car top light fixture before returning car to service please call 212-312-8732..
Mar 2, 2000 · Penalty $500
Resolve - Non-hazardous
Work without a permit work noted 2nd fl window lintels having exposed the structure al stell column 3rd fl front remedy obtain all necessary permit
Jun 9, 1999 · Penalty $500
Resolve - Hazardous
Work without a permit: begining to replace the 2 floor window lintels (2 lintels) and having exposed the structaul steel column 3rd floor-north side of the building entrance without permits and without providin
Jul 16, 1997 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Oct 23, 2026 · Apt BLDG
Open - Water leak
Heavy flow
Oct 15, 2026 · Apt 4A
Open - Heat/hot water
Entire building
Oct 8, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Sep 25, 2026 · Apt 5C
Close - Door/window
Door
Aug 20, 2026 · Apt BLDG
Close - General
Signage missing
Aug 16, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 16, 2026 · Apt BLDG
Close - Electric
Power outage
Aug 16, 2026 · Apt BLDG
Close - Safety
Fire escape
Aug 16, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
Jul 21, 2026 · Apt 2B
Close
Show 40 more ↓
- General
Cabinet
Jul 21, 2026 · Apt 2B
Close - Electric
No lighting
Jul 21, 2026 · Apt 2B
Close - Door/window
Window frame
Jul 21, 2026 · Apt 2B
Close - Flooring/stairs
Floor
Jul 21, 2026 · Apt 2B
Close - Unsanitary condition
Mold
Jul 21, 2026 · Apt 2B
Close - Paint/plaster
Wall
Jul 21, 2026 · Apt 2B
Close - Electric
No lighting
Jul 16, 2026 · Apt BLDG
Close - Door/window
Door
Jul 16, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 16, 2026 · Apt BLDG
Close - Elevator
Maintenance
Jul 16, 2026 · Apt BLDG
Close - Door/window
Door
Jul 14, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 6, 2026 · Apt 10
Close - Door/window
Door
Jul 6, 2026 · Apt 10
Close - Electric
Lighting
Jul 6, 2026 · Apt 10
Close - Heat/hot water
Entire building
May 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 18, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
May 12, 2026 · Apt 2B
Close - Paint/plaster
Ceiling
May 12, 2026 · Apt 2B
Close - Door/window
Window frame
May 12, 2026 · Apt 2B
Close - Flooring/stairs
Floor
May 12, 2026 · Apt 2B
Close - Paint/plaster
Wall
May 12, 2026 · Apt 2B
Close - Door/window
Window pane
May 12, 2026 · Apt 6F
Close - General
Cabinet
May 12, 2026 · Apt 6F
Close - General
Cabinet
May 12, 2026 · Apt 6F
Close - Paint/plaster
Ceiling
May 12, 2026 · Apt 6F
Close - Unsanitary condition
Pests
May 12, 2026 · Apt 6F
Close - Heat/hot water
Entire building
Apr 12, 2026 · Apt 1
Close - Electric
Wiring
Apr 5, 2026 · Apt 2V
Close - Door/window
Door
Mar 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close - Door/window
Window frame
Mar 4, 2026 · Apt 3C
Close - Heat/hot water
Apartment only
Mar 4, 2026 · Apt 3C
Close - Heat/hot water
Entire building
Mar 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1937
- Floors
- 6
- Residential units
- 42
- Building area
- 35,700 ft²
- Lot area
- 9,000 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 14
- Block / lot
- 3171 / 31
- Assessed value
- $666,450
- Landmark / historic district
- No
HPD registration #209209, last renewed Sep 10, 2025.
Questions about 2259 Creston Avenue
Who owns 2259 Creston Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2259 Realty LLC.
Does 2259 Creston Avenue have violations?
Yes. NYC HPD has recorded 429 housing violations at this property.
Is 2259 Creston Avenue rent stabilized?
NYC Department of Finance tax bills listed 41 rent-stabilized units here in 2024 (about 98% of its 42 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2259 Creston Avenue built?
City records list 1937 as the year it was built.
How many apartments are in 2259 Creston Avenue?
It has 42 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.