2267 Creston Avenue
Bronx, NY 10453BBL 2-03171-0028Map
Owner of record: 2267 Creston Mbsd LLC
2267 Creston Avenue is a walk-up apartment building built in 1901 in Bronx, 10453. It has 10 residential units across 3 floors. The owner of record is 2267 Creston Mbsd LLC. HPD has recorded 31 housing violations here, most recently on August 30, 2026. 19 of the 31 most recent violations are still open.
- HPD violations
- 31
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 37
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 31
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 1st story
Aug 30, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 1st story
Aug 30, 2026
Open — Nov certified on time - CImmediately hazardous
M/d law abate the nuisance consisting of extension cord at floor leading from 1c to 1d at public hall, 1st story
Aug 24, 2026
Open — Nov certified on time - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage information missing at public hall
Aug 24, 2026
Open — Nov certified on time - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Aug 24, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1a, 2nd story, 1st apartment from west at north
Feb 12, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 12, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Nov 24, 2025
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall
Nov 24, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Nov 24, 2025
Closed — Violation dismissed
Show 21 more ↓
- ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall
Nov 24, 2025
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1a, 1st story, 1st apartment from west at north
Nov 24, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Nov 24, 2025
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Nov 24, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall
Nov 24, 2025
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Nov 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Nov 24, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story
Mar 3, 2010 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story
Mar 3, 2010 · Apt 2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 2, 2nd story, apartment at west
Feb 23, 2010 · Apt 2
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2, 2nd story, apartment at west
Feb 23, 2010 · Apt 2
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 2, 2nd story, apartment at west
Feb 23, 2010 · Apt 2
Open — Nov sent out - BHazardous
Abate the nuisance consisting of evidence of water leak at ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west
Feb 19, 2009 · Apt 2
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective hard wood floor in the 2nd room from east located at apt 2, 2nd story, 1st apartment from south at west
Feb 19, 2009 · Apt 2
Open — Invalid certification - BHazardous
Abate the nuisance consisting of evidence of water leak at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from south at west
Feb 19, 2009 · Apt 2
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective hard wood floor in the private hallway located at apt 2, 2nd story, 1st apartment from south at west
Feb 19, 2009 · Apt 2
Open — Invalid certification - BHazardous
Replace the broken or defective bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Feb 19, 2009 · Apt 2
Open — Invalid certification - BHazardous
Replace with new the broken or defective marble saddle in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Feb 19, 2009 · Apt 2
Open — Invalid certification - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 19, 2009 · Apt 2
Open — Invalid certification - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Feb 19, 2009 · Apt 2
Open — Invalid certification
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Failure to maintain bldg in code compliant manner. @ time of appointment noted in rear yard a section of fence that was around 12' long x 6'in height not secured & laying on the ground. remedy: repair &/or repl
Apr 8, 2019
Resolve
Complaints
- Electric
Power outage
Aug 20, 2026 · Apt 1D
Close - Heat/hot water
Apartment only
Feb 12, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 10, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 5, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 1A
Close - Electric
Power outage
Jan 9, 2026 · Apt 1D
Close - Heat/hot water
Apartment only
Nov 22, 2025 · Apt 1A
Close - Unsanitary condition
Pests
Jul 29, 2025 · Apt 1B
Close - Unsanitary condition
Pests
Jul 29, 2025 · Apt 1B
Close
Show 27 more ↓
- Water leak
Heavy flow
Mar 27, 2025 · Apt B1
Close - Door/window
Door
Jan 28, 2025 · Apt 2A
Close - Water leak
Heavy flow
Aug 28, 2024 · Apt B1
Close - Unsanitary condition
Mold
Aug 28, 2024 · Apt B1
Close - Heating
Heat related
Dec 29, 2010 · Apt 2
Close - Plumbing
Water supply
Aug 23, 2010 · Apt 2
Close - Plumbing
Water supply
Aug 23, 2010 · Apt 2
Close - Heating
Heat related
Feb 18, 2010 · Apt 2
Close - Paint/plaster
Ceiling
Feb 18, 2010 · Apt 2
Close - Paint/plaster
Ceiling
Feb 18, 2010 · Apt 2
Close - Plumbing
Water-leaks
Feb 18, 2010 · Apt 2
Close - Nonconst
Carbon monoxide
Feb 18, 2010 · Apt 2
Close - Heating
Heat related
Feb 16, 2010 · Apt 2
Close - Heating
Heat related
Feb 4, 2010 · Apt 2
Close - Heating
Heat related
Dec 10, 2009 · Apt 2
Close - General
Cabinet
Dec 10, 2009 · Apt 2
Close - Plumbing
Water-leaks
Dec 10, 2009 · Apt 2
Close - Nonconst
Carbon monoxide
Dec 10, 2009 · Apt 2
Close - Heating
Heat related
Nov 28, 2009 · Apt 2
Close - Heating
Heat related
Jan 24, 2009 · Apt 2
Close - Heating
Heat related
Jan 24, 2009 · Apt 2
Close - Plumbing
Water-leaks
Jan 24, 2009 · Apt 2
Close - Paint/plaster
Wall
Jan 24, 2009 · Apt 2
Close - Plumbing
Radiator
Jan 24, 2009 · Apt 2
Close - General
Floor
Jan 24, 2009 · Apt 2
Close - Nonconst
Vermin
Jan 24, 2009 · Apt 2
Close - Nonconst
Vermin
Jan 24, 2009 · Apt 2
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jan 6, 2026 | Non-market transfer | Rentals - walkup apartments | 10 |
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1901
- Floors
- 3
- Residential units
- 10
- Building area
- 4,124 ft²
- Lot area
- 2,400 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 14
- Block / lot
- 3171 / 28
- Assessed value
- $342,450
- Landmark / historic district
- No
HPD registration #229026, last renewed Sep 15, 2025.
Questions about 2267 Creston Avenue
Who owns 2267 Creston Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2267 Creston Mbsd LLC.
Does 2267 Creston Avenue have violations?
Yes. NYC HPD has recorded 31 housing violations at this property.
Is 2267 Creston Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 2267 Creston Avenue built?
City records list 1901 as the year it was built.
How many apartments are in 2267 Creston Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.