154 East 175 Street
Bronx, NY 10457BBL 2-02796-0028Map
Owner of record: 175th Street Realty Group LLC
154 East 175 Street is a walk-up apartment building built in 1905 in Bronx, 10457. It has 15 residential units across 4 floors. The owner of record is 175th Street Realty Group LLC. HPD has recorded 788 housing violations here, most recently on October 13, 2026. 48 of the 50 most recent violations are still open. City tax records listed 14 rent-stabilized apartments here in 2024.
- HPD violations
- 788
- DOB violations
- 14
- ECB violations
- 9
- HPD complaints
- 609
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 788
- IInformation / order
The property has been issued an order to identify and address underlying conditions and violations related to the order. failure to comply may result in extensive repair work to correct underlying conditions and related violations by hpd. charges for repair work done pursuant to this order, if not paid, will become tax liens on the property
Oct 13, 2026
Open — Info nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 4th story, 2nd apartment from south at west
Sep 26, 2026 · Apt 3B
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3b, 4th story, 2nd apartment from south at west
Sep 26, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from east at south located at apt 3b, 4th story, 2nd apartment from south at west
Sep 26, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood base cabinet at the east wall in the kitchen located at apt 3b, 4th story, 2nd apartment from south at west
Sep 26, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3b, 4th story, 2nd apartment from south at west
Sep 26, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and all walls at public hall, 4th story
Sep 26, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of chairs and a book shelf at public hall, 3rd story
Sep 26, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above the ceiling at public hall, 4th story
Sep 26, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant material at the ceiling at public hall, 4th story
Sep 26, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at south located at apt 3c, 4th story, 1st apartment from south at west
Sep 21, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3c, 4th story, 1st apartment from south at west
Sep 21, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Repair the broken or defective connection drain pipe underneath kitchen sink base cabinet in the kitchen located at apt 3c, 4th story, 1st apartment from south at west
Sep 21, 2026 · Apt 3C
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead
Sep 21, 2026
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 21, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
Sep 21, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at west wall in the 3rd room from east at north located at apt 3c, 4th story, 1st apartment from south at west
Sep 21, 2026 · Apt 3C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 4th story, 1st apartment from south at west
Sep 21, 2026 · Apt 3C
Open — Civ14 mailed - BHazardous
Properly secure the loose door knob at entrance door in the 5th room from east at south located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Properly secure the loose door knob in the 5th room from east at north located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall behind the radiator in the 4th room from east at south located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall and south wall in the bathroom located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective silicone caulking around the bathtub in the bathroom located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Repair the broken or defective connection wasteline at the wash basin in the bathroom located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Repair the broken or defective connection wasteline at wash basin in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 17, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
Aug 17, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 1a, 2nd story, 1st apartment from north at east
Aug 17, 2026 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sloping wood floor in the kitchen located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sloping wood floor in the kitchen located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq feet at 1st window frame from south at west wall in the 5th room from east at north located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective sash lock at fire escape window in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Aug 17, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood at floor and west wall of sink base cabinet (repair and seal) in the kitchen located at apt 1a, 2nd story, 1st apartment from north at east
Aug 17, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly secure the loose door knob at interior in the entrance located at apt 1a, 2nd story, 1st apartment from north at east
Aug 17, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 1a, 2nd story, 1st apartment from north at east
Aug 17, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the 5th room from east at south located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 5th room from east at south located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 2nd story, 1st apartment from north at east
Aug 17, 2026 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 4th story, 2nd apartment from south at west
Aug 17, 2026 · Apt 3B
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall under the sink in the kitchen located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Civ14 mailed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq feet at the window header in the bathroom located at apt 1c, 2nd story, 1st apartment from south at west
Aug 17, 2026 · Apt 1C
Open — Notice of issuance sent to tenant
DOB building violations · 14
- Immediate emergency anythingoptional
Install an approx.total of 150 linear ft of sidewalk shed with approx 100 linear feet along east 175 street and approx. 50 linear feet of sidewalk shed along eastburn avenue to safeguard the public and property
Jul 27, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 9
- Class - 3
Failure to miantain building in code compliant manner note: metal carnice @parapet lvl is is corrding, with openings @various location alongexp 1. rem: repair and or replace.
Jun 25, 2019 · Penalty $500
Active - Class - 2
Failure to maintain in code complaint manner. one inch marble landing between 2nd and 3rd floors broke. temporary plywood in place by fdny. rem: replace landing with fire proof material. provide report for sta
Jul 11, 2009
Resolve - Non-hazardous
Work without a permit having constructed a grocery store in basement.1.store fronts 2.shelves 3.countertops.reinspection of#34129762p,34092832p,34121125x.remedy:obtain all necessary permits.
May 9, 2001 · Penalty $250
Active - Non-hazardous
Work without a permit work noted opeing created in exterior wall antinteror partitions creating a grocery store in basement remedy obtain permit if fesible or discontinue illegla use and restore premises to pri
Jun 8, 1999
Resolve - Non-hazardous
Work without a permit work noted grocery store installed at basement remedy discontinue illegal use.
Jan 17, 1998
Resolve - Non-hazardous
Work withut a permit.work noted:grocery store installed at basemt.remedy:discontinue unlawful use/and restore back to legal prior condition.
Jan 2, 1996 · Penalty $1,000
Active - Non-hazardous
Work without a permit.work noted:grocery store installed at basement.remedy:discontinue use or obtain a new c of o.
Mar 10, 1995 · Penalty $350
Active - Non-hazardous
Illegal use in a residential district. operating a grocery store in the basement of an r-8 district. remedy- discontinue illegal use
Apr 27, 1994 · Penalty $475
Active - Non-hazardous
Work without permit. work noted. grocery store installed at basement remedy:obtain a permit or restore premises to prior legal conditions.
Jul 9, 1993 · Penalty $1,000
Active
Complaints
- Unsanitary condition
Mold
Sep 18, 2026 · Apt 1C
Close - General
Cabinet
Sep 18, 2026 · Apt 1C
Close - Water leak
Slow leak
Sep 18, 2026 · Apt 1C
Close - Paint/plaster
Wall
Sep 18, 2026 · Apt 1C
Close - Plumbing
Basin/sink
Sep 18, 2026 · Apt 1C
Close - Flooring/stairs
Floor
Sep 18, 2026 · Apt 1C
Close - Water leak
Slow leak
Sep 17, 2026 · Apt 3C
Close - Flooring/stairs
Floor
Sep 1, 2026 · Apt 3B
Close - Plumbing
Basin/sink
Sep 1, 2026 · Apt 3B
Close - Plumbing
Basin/sink
Sep 1, 2026 · Apt 3B
Close
Show 40 more ↓
- Flooring/stairs
Floor
Sep 1, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Aug 10, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Aug 10, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Aug 10, 2026 · Apt 3B
Close - Door/window
Door
Aug 10, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Aug 3, 2026 · Apt 1C
Close - Unsanitary condition
Pests
Aug 3, 2026 · Apt 1C
Close - Flooring/stairs
Floor
Aug 3, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
Aug 3, 2026 · Apt 1C
Close - Door/window
Door frame
Jul 23, 2026 · Apt 3B
Close - Door/window
Door
Jul 23, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Jul 23, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Jul 23, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Jul 17, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Jul 17, 2026 · Apt 3B
Close - Door/window
Door
Jul 17, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Jun 29, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Jun 29, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Jun 29, 2026 · Apt 3B
Close - Door/window
Door
Jun 29, 2026 · Apt 3B
Close - Door/window
Door
Jun 18, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Jun 18, 2026 · Apt 3B
Close - Door/window
Door
Jun 18, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Jun 18, 2026 · Apt 3B
Close - Unsanitary condition
Pests
May 21, 2026 · Apt 3A
Close - Unsanitary condition
Pests
May 21, 2026 · Apt 3A
Close - Unsanitary condition
Mold
May 21, 2026 · Apt 3A
Close - Unsanitary condition
Pests
May 21, 2026 · Apt 2C
Close - Unsanitary condition
Pests
May 21, 2026 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
May 21, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
May 21, 2026 · Apt BLDG
Close - Safety
Fire escape
May 21, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
May 21, 2026 · Apt 3C
Close - Flooring/stairs
Floor
May 11, 2026 · Apt 1A
Close - Door/window
Door
May 11, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
May 11, 2026 · Apt 1A
Close - Plumbing
Bathtub/shower
May 11, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
May 11, 2026 · Apt 1A
Close - General
Cabinet
May 11, 2026 · Apt 1A
Close - Paint/plaster
Wall
May 11, 2026 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1905
- Floors
- 4
- Residential units
- 15
- Building area
- 13,700 ft²
- Lot area
- 4,418 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 14
- Block / lot
- 2796 / 28
- Assessed value
- $396,900
- Landmark / historic district
- No
HPD registration #205477, last renewed Jul 28, 2025.
Questions about 154 East 175 Street
Who owns 154 East 175 Street?
The owner of record in NYC Department of City Planning PLUTO data is 175th Street Realty Group LLC.
Does 154 East 175 Street have violations?
Yes. NYC HPD has recorded 788 housing violations at this property.
Is 154 East 175 Street rent stabilized?
NYC Department of Finance tax bills listed 14 rent-stabilized units here in 2024 (about 93% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 154 East 175 Street built?
City records list 1905 as the year it was built.
How many apartments are in 154 East 175 Street?
It has 15 residential units and 16 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.